Question: 1
B. TRUE
Answer: A
Question: 2
DevOps is a set of tools that enable communication, automation and integration among Development and Operations
A. FALSE
B. TRUE
Answer: A
Question: 3
B. Team Increment
C. Epic
D. System Increment
Answer: A,B,D
https://www.certsquestions.com/
Question: 4
D. The RTE
Answer: A
Question: 5
B. Strategic
D. Servant
Answer: D
Question: 6
During iteration execution there is a smaller PDCA cycle. Which meeting represents this?
A. Daily Standup
https://www.certsquestions.com/
B. System Demo
C. Iteration Retrospective
D. Iteration Review
Answer: A
Question: 7
Which of the following are parts of the Inspect & Adapt event?
A. Quantitative Measurement
B. Problem-solving workshop
C. PI System Demo
D. Confidence Voting
Answer: A,B,C
Question: 8
When does management review and problem soliving meeting take place in PI Planning?
A. At the beginning of Day 1
https://www.certsquestions.com/
Answer: C
Question: 9
C. Lack of innovation
Answer: A,B,C,D
Question: 10
WIP limits are initially a hypothesis. They will evolve over time as the teams learn
A. TRUE
B. FALSE
Answer: A
Question: 11
A. 15-20
B. 3 to 5
https://www.certsquestions.com/
C. 5 to 12
D. 25-35
Answer: C
Question: 12
Who facilitates the management review and problem solving meeting at the end of Day 1 of PI Planning?
A. System Architect
B. RTE
D. Business Owner
Answer: B
Question: 13
What is the output of the problem-solving workshop of the Inspect & Adapt event?
A. Detailed report of the PI
D. PI metrics sheet
Answer: B
https://www.certsquestions.com/
Question: 14
Which is the key problem from the 5 team dysfunctions which leads to the other 4?
A. Lack of Commitment
B. Inattention to Results
C. Fear of Conflict
D. Absence of Trust
Answer: D
Question: 15
B. Enterprise Architect
C. Product Owner
D. Business Owners
Answer: C
Question: 16
The Program Kanban board has implicit policies of how work is managed in each state
A. FALSE
B. TRUE
Answer: A
https://www.certsquestions.com/
Question: 17
Which of the following areas is the main concern of the RTE role?
A. Program Execution
B. Technology
C. Content Management
D. Human Resource
Answer: A
Question: 18
Due to uncommitted objectives, it is possible for a team to achieve more than 100% on their PI Team Performance Report
A. FALSE
B. TRUE
Answer: B
Question: 19
Which program level event is used to discuss problems or opportunities with feature development and to assess any
scope adjustments?
A. Scrum of Scrums
B. PO Sync
C. System Demo
D. ART Sync
Answer: B
https://www.certsquestions.com/
Question: 20
B. Performing
C. Forming
D. Storming
Answer: A
Question: 21
Each team's planned vs. actual business value is rolled up to the program predictability measure during the Inspect &
Adapt event
A. TRUE
B. FALSE
Answer: A
Question: 22
Which artifact shows the progress being made toward the Program Increment timebox?
A. PI burndown chart
B. WIP Limits
Answer: A
https://www.certsquestions.com/
Question: 23
B. FALSE
Answer: A
Question: 24
B. WSJF
C. SMART
D. ROAM
Answer: C
Question: 25
Which artifact shows the sequence of inter-team dependencies for delivering the features?
A. SoS radiator
D. Program Board
Answer: D
https://www.certsquestions.com/
Question: 26
Which component of the Continuous Delivery Pipeline focuses on creating alignment on what needs to be built?
A. Continuous Integration
B. Continuous Exploration
C. Continuous Deployment
D. Release On Demand
Answer: B
Question: 27
Answer: D
Question: 28
Which meeting aligns all team members to the common goals of the team as defined by the Team PI Objectives?
A. Iteration Review
B. Iteration Retrospective
D. Iteration Planning
Answer: D
https://www.certsquestions.com/
Question: 29
What is the main concern of having too much preparation for PI Planning?
A. This will reduce exploration and affect interaction and emergent design
B. The PI Planning event will be too short to fill the typical timebox
Answer: A
Question: 30
Answer: D
Question: 31
B. IP Iteration
C. PI System Demo
D. PI Planning
Answer: A
https://www.certsquestions.com/
Question: 32
B. Totally clear
C. Testable
D. Task-oriented
Answer: A
Question: 33
Answer: B
Question: 34
Answer: A
https://www.certsquestions.com/
Question: 35
It is recommended to use the same layout and colours for planning boards in order to create shared understanding and
transparency.
A. FALSE
B. TRUE
Answer: B
Question: 36
B. Iteration
Answer: A
Question: 37
Answer: D
https://www.certsquestions.com/
Question: 38
Answer: A
Question: 39
Answer: D
Question: 40
Which of the following is not one of the four stages which are characteristic for team development?
A. Integrating
B. Storming
C. Forming
D. Performing
Answer: A
https://www.certsquestions.com/
Question: 41
B. Product Owners
D. System Architect
Answer: A,C
Question: 42
As the ART matures, teams typically migrate from __________ teams to ___________ teams
A. component, feature
B. cross-functional, self-organizing
C. smaller, bigger
D. feature, component
Answer: A
Question: 43
Answer: D
https://www.certsquestions.com/
Question: 44
B. TRUE
Answer: A
Question: 45
According to systems thinking, optimizing a component always leads to optimizing the system
A. FALSE
B. TRUE
Answer: A
Question: 46
What happens if during PI Planning the confidence vote of a team or overall is low?
A. Mark the risk as Accepted, using ROAM
D. Cancel the PI
Answer: C
https://www.certsquestions.com/
Question: 47
B. ART Sync
C. Scrum of Scrums
Answer: A,B,C
Question: 48
Which level of Definition of Done is concerned with capabilities completed by all trains meet acceptance criteria?
A. Portfolio Increment DoD
Answer: C
Question: 49
B. RTE
C. product management
D. Business Owners
Answer: D
https://www.certsquestions.com/
Question: 50
B. 4 hours
C. 1 day
D. 2 days
Answer: D
Question: 51
The Continuous Delivery Pipeline is part of which of the seven core competencies for business agility?
A. Enterprise Solution Delivery
B. Organizational Agility
Answer: D
Question: 52
B. FALSE
Answer: A
https://www.certsquestions.com/
Question: 53
Which artifact shows a series of areas representing the amount of work in the different Kanban states?
A. Cumulative Flow Diagram
C. WIP Limits
D. PI burndown chart
Answer: A
Question: 54
The ___________ of the Continuous Delivery Pipeline is an Enabler that helps the RTE identify and remove bottlenecks
A. Fishbone analysis
C. process mapping
D. Pareto Analysis
Answer: B
Question: 55
Which of the below are not part of the CALMR approach to DevOps?
A. Large batches
B. Automation
C. Measurement
D. Culture
Answer: A
https://www.certsquestions.com/
Question: 56
B. Facilitating PI Planning
Answer: A
Question: 57
C. In T shirt size
D. In monetary terms
Answer: A
Question: 58
Which of the following roles are involved into the preparation of the Program Backlog for PI Planning?
A. RTE
B. Enterprise Architect
C. Product management
D. Epic Owners
Answer: A,C
https://www.certsquestions.com/
Question: 59
B. System team
C. Epic Owners
D. Product management
Answer: C
Question: 60
Which team event expresses the “Check” step of the PDCA cycle?
A. Team Demo
B. Iteration Retrospective
C. Daily Standup
D. Iteration Planning
Answer: A
Question: 61
Coaching the members of the ART to embrace learning and relentless improvement is a key task for the RTE.
A. TRUE
B. FALSE
Answer: A
https://www.certsquestions.com/
Question: 62
Implementing Conway's law to design systems which mirror the communication structure is a good practice when
organizing the ART
A. TRUE
B. FALSE
Answer: B
Question: 63
On which part of the Inspect & Adapt event the teams on the train work together to systematically address the larger
impediments that are limiting program velocity by using root cause analysis?
A. Confidence Voting
B. Iteration Retrospective
C. Problem-solving workshop
D. PI System Demo
Answer: C
Question: 64
D. Annually
Answer: A
https://www.certsquestions.com/
Question: 65
Which of the following is not an RTE tool used in preparation for PI Planning?
A. ART events calendar
B. Roadmap
C. Facilities checklist
Answer: B
Question: 66
A. 45 mins
B. 30 mins
C. 15 mins
D. 1 hour
Answer: C
Question: 67
B. 10 to 25
C. 30 to 40
D. 250 to 300
Answer: A
https://www.certsquestions.com/
Question: 68
Where are the actions which are outcome of the problem-solving workshop during Inspect & Adapt stored?
A. in the risk sheet
D. in a database
Answer: C
Question: 69
The RTE presents the planning adjustments which are output of the management review and problem solving meeting to
the teams at the beginning of Day 2 of PI Planning
A. TRUE
B. FALSE
Answer: B
Question: 70
Answer: D
https://www.certsquestions.com/
Question: 71
B. Iterations
C. Story Points
D. Kanban states
Answer: B
Question: 72
C. It is not mandatory to have all the functionalities tested before the demo
Answer: A,D
Question: 73
Which artifact aligns expectations among key ART roles, teams, and stakeholders regarding what 'done' actually means?
A. Acceptance Criteria
B. Functional Specification
C. Definition of Done
D. Definition of Ready
Answer: C
https://www.certsquestions.com/
Question: 74
B. FALSE
Answer: B
Question: 75
The RTE collects and aggregates the agreed-upon ART Metrics once per PI, at the end of the PI
A. FALSE
B. TRUE
Answer: A
Question: 76
What happens if the teams need to rework their plans due to low confidence level after confidence vote?
A. This is one occasion when the timebox is less important than achieving alignment and the teams should take the
required time they need to rework the plan
B. The low confidence is marked as risk using ROAM and the PI starts as planned
D. The PI is cancelled
Answer: A
https://www.certsquestions.com/
Question: 77
Answer: C
Question: 78
Which of the below are not part of the CALMR approach to DevOps?
A. Measurement
B. Continuous Improvement
C. Automation
D. Lean Flow
Answer: B
Question: 79
Answer: B
https://www.certsquestions.com/
Question: 80
Answer: D
Question: 81
Answer: A
Question: 82
C. Facilitating PI Planning
Answer: C,D
https://www.certsquestions.com/
Question: 83
The product increment that the team demos to the Product Owner on the team demo does not necessarily need to have
been tested by the team.
A. FALSE
B. TRUE
Answer: A
Question: 84
Which level of Definition of Done is concerned with stories completed by all teams in the ART are integrated?
A. Portfolio Increment DoD
Answer: B
Question: 85
B. TRUE
Answer: B
https://www.certsquestions.com/
Question: 86
C. ART Sync
D. PI Planning
Answer: A,B,C,D
Question: 87
B. uses empathy
Answer: D
Question: 88
In SAFe the smallest cadence at which the team delivers potentially shippable work product is called
A. Program Increment
B. Iteration
C. Product Increment
D. Portfolio Increment
Answer: B
https://www.certsquestions.com/
Question: 89
The most important thing to visualize on the Program Board is when features are expected to be delivered.
A. TRUE
B. FALSE
Answer: A
Question: 90
In SAFe releases happen once per PI, at the end of the PI.
A. TRUE
B. FALSE
Answer: B
Question: 91
Which of the following areas is the main concern of the System Architect/Engineer?
A. Technology
B. Content Management
C. Human Resource
D. Program Execution
Answer: A
https://www.certsquestions.com/
Question: 92
B. Product management
C. Business Owners
D. Epic Owners
Answer: C
Question: 93
Which of the following are true for the Program Kanban Board?
A. Visualizes the individual teams progress at user story level of detail
D. It is a useful tool for the SoS, PO sync , and ART sync meetings and problem solving
Answer: B,C,D
Question: 94
Which from the below are typical program measures of a cumulative flow diagram?
A. WIP limits
B. Throughput
C. Business value
D. Lead time
Answer: A,B,D
https://www.certsquestions.com/
Question: 95
Answer: C
Question: 96
D. Continuous Learning
Answer: B
Question: 97
Which of the following are inputs to the management review and problem solving meeting at the end of Day 1 of PI
Planning?
A. PI Objectives
B. PI Risks
C. ART
D. PI Problems
Answer: B,C,D
https://www.certsquestions.com/
Question: 98
According to systems thinking, a system can evolve faster than its slowest integration point
A. FALSE
B. TRUE
Answer: A
Question: 99
Which Program Level event is used to create visibility into how well the ART is progressing toward meeting the program
Pl Objectives?
A. System Demo
B. PO Sync
C. ART Sync
D. Scrum of Scrums
Answer: B
Question: 100
In SAFe, to organize the teams around value, the teams are organized around
A. technical competencies
B. features
C. components
D. customers
Answer: B,C
https://www.certsquestions.com/
Question: 101
B. Fostering collaboration
Answer: B
Question: 102
B. PI Objectives
C. Team backlog
D. Program risks
Answer: C
Question: 103
B. SMART
C. ROAM
D. WSJF
Answer: C
https://www.certsquestions.com/
Question: 104
Which of the following is an indicator of whether achievements fall into an acceptable process control Band?
A. Process Map
Answer: C
Question: 105
B. Business Owners
C. System Architect
D. Product Owner
Answer: A,B,C
Question: 106
Answer: A,B,C,D
https://www.certsquestions.com/
Question: 107
Which is step from the PDCA cycle is expressed by the Iteration Retrospective?
A. Check
B. Adjust
C. Accommodate
D. Adapt
Answer: B
Question: 108
Answer: A,C
Question: 109
PI Objectives are created top down, e.g team objectives are created from the PI objectives
A. FALSE
B. TRUE
Answer: A
https://www.certsquestions.com/
Question: 110
The RTE should move from facilitating team problem-solving towards fixing problems rather than helping others fix them
A. TRUE
B. FALSE
Answer: A
Question: 111
B. twelve
C. eight
D. five
Answer: A
Question: 112
B. User stories
C. Tasks
D. features
Answer: A,D
https://www.certsquestions.com/
Question: 113
What is displayed above each Kanban column of the Program Kanban and is used to improve flow?
A. WIP limits
D. WSJF Score
Answer: A
Question: 114
Which component of the Continuous Delivery Pipeline is the ability to make value available to customers all at once, or in
a staggered fashion based market and business needs?
A. Continuous Deployment
B. Continuous Exploration
C. Release On Demand
D. Continuous Integration
Answer: C
Question: 115
Answer: D
https://www.certsquestions.com/
Question: 116
Which component of the Continuous Delivery Pipeline focuses on taking features from the Program backlog and
implementing them?
A. Continuous Exploration
B. Release On Demand
C. Continuous Deployment
D. Continuous Integration
Answer: D
Question: 117
Which event helps the teams keep on track and facilitate early identification of risks?
A. Inspect and Adapt
B. IP iteration
C. Daily Scrum
D. Scrum of Scrums
Answer: D
Question: 118
B. RTE
C. System Architect
D. ScrumMasters
Answer: B
https://www.certsquestions.com/
Question: 119
What does the S in the SMART model for PI Objectives stand for?
A. Special
B. Solid
C. Specific
D. Secondary
Answer: C
Question: 120
Answer: C
Question: 121
In which stage of team development the team resolves initial conflicts and difficulties in establishing a shared
understanding?
A. Storming
B. Performing
C. Forming
D. Norming
Answer: A
https://www.certsquestions.com/
Question: 122
B. Pareto chart
C. Fishbone
D. Process Map
Answer: C
Question: 123
Results are empirically reviewed at every System Demo and Pl Planning event and this helps to overcome which team
dysfunction?
A. Absence of Trust
B. Fear of Conflict
C. Inattention to results
D. Lack of Commitment
Answer: C
Question: 124
A. TRUE
B. FALSE
Answer: B
https://www.certsquestions.com/
Question: 125
The RTE is responsible to create a set of Integrated Program Pl Objectives at the end of PI Planning
A. TRUE
B. FALSE
Answer: A
Question: 126
Who has the primary responsibility to agree the business objectives with the key stakeholders on the ART?
A. Product management
B. Epic Owners
C. RTE
D. Business Owners
Answer: D
Question: 127
B. Line Manager
Answer: B
https://www.certsquestions.com/
Question: 128
B. Marketing
C. Backlog Prioritization
D. Integration
Answer: A,D
Question: 129
Which artifact aligns the teams in the ART around a common mission?
A. Team Backlog
B. Portfolio
C. Program Backlog
D. Solution Backlog
Answer: C
Question: 130
C. To update management
Answer: D
https://www.certsquestions.com/
Question: 131
What does the R in the SMART model for PI Objectives stand for?
A. Rare
B. Reliable
C. Realistic
D. Relatable
Answer: C
Question: 132
When are he boundaries within which teams are planning the PI established?
A. At the end of day 1 of PI Planning
Answer: B
Question: 133
B. There needs to be a balance between the System Team and the Agile Teams on the Train
D. The Agile Teams on the ART take preference over the System Team
Answer: B
https://www.certsquestions.com/
Question: 134
It is acceptable to increase PI Planning to 2.5 or 3 days in the case of different time zones to have enough time
overlapping periods
A. TRUE
B. FALSE
Answer: A
Question: 135
Answer: C
Question: 136
Which level of Definition of Done is concerned with user stories satisfying the acceptance criteria?
A. System Increment DoD
Answer: C
https://www.certsquestions.com/
Question: 137
Which part of the Inspect & Adapt event provides a formal approach to demonstrating accumulated value?
A. Problem-solving workshop
B. Quantitative Measurement
C. Confidence Voting
D. PI System Demo
Answer: D
Question: 138
Answer: B,D
Question: 139
B. Iterations
C. Kanban states
D. Team names
Answer: A
https://www.certsquestions.com/
Question: 140
In SAFe, what provides for cadence-based planning and is an estimating guard band for cadence-based delivery?
A. IP Iteration
C. Iteration
D. Iteration Review
Answer: A
Question: 141
B. Content Management
C. Technology
D. Human Resource
Answer: B
Question: 142
B. TRUE
Answer: A
https://www.certsquestions.com/
Question: 143
Who is responsible to follow up on the action items of the problem-solving workshop of the Inspect & Adapt event?
A. System Architect
B. Scrum Masters
C. RTE
D. Product Owners
Answer: C
Question: 144
B. Continuous Testing
C. Continuous Deployment
D. Continuous Exploration
Answer: B
Question: 145
What is used to make process policies and decisions visible to the entire ART?
A. Program Kanban Board
Answer: A
https://www.certsquestions.com/
Question: 146
B. TRUE
Answer: B
Question: 147
Which of the following is the recommended approach to create T-shaped skills on the ART?
A. Cross-training
B. Pair-programming
Answer: C
Question: 148
The number of items that can be finished per unit of time is called
A. lead time
B. velocity
C. cycle time
D. throughput
Answer: D
https://www.certsquestions.com/
Question: 149
Which component of the Continuous Delivery Pipeline takes the changes from the staging environment and deploys them
to production?
A. Continuous Integration
B. Continuous Deployment
C. Release On Demand
D. Continuous Exploration
Answer: B
Question: 150
B. four weeks
C. three weeks
D. two weeks
Answer: D
Question: 151
The planned total in the PI Team Performance Report does not include uncommitted objectives. They are included in the
actual total.
A. TRUE
B. FALSE
Answer: A
https://www.certsquestions.com/
Question: 152
C. Dependencies
D. Milestones
Answer: B
Question: 153
B. PI Objectives
C. Iteration Goal
D. Team Backlog
Answer: C
Question: 154
B. minimizing dependencies
C. compromising quality
D. minimizing hand-offs
Answer: B,D
https://www.certsquestions.com/
Question: 155
Which program level event is focused on overall program execution and impediment escalation?
A. ART Sync
B. Scrum of Scrums
C. System Demo
D. PO Sync
Answer: B
Question: 156
Which of the below are not part of the CALMR approach to DevOps?
A. Measurement
B. Authentication
C. Culture
D. Lean Flow
Answer: B
Question: 157
Which team event ensures that relentless improvement - one of the pillars of SAFe's Lean-Agile Mindset - is happening at
the Team Level?
A. Iteration Retrospective
B. Iteration Review
C. System Demo
https://www.certsquestions.com/
Answer: A
Question: 158
The actions that are planned to resolve inter-team dependencies are marked visually with different colour on the
program board, e.g red
A. TRUE
B. FALSE
Answer: A
Question: 159
Who has design authority and prioritizes the architectural work at an ART level?
A. System Team
B. Enterprise Architect
C. RTE
D. System Architect
Answer: D
Question: 160
When is the first formal integration point among teams on the Agile Release Train (ART)?
A. I&A event
D. Team demo
https://www.certsquestions.com/
Answer: B
Question: 161
Relevant stakeholders present the planning adjustments which are output of the management review and problem
solving meeting to the teams at the end of Day 2 of PI Planning
A. FALSE
B. TRUE
Answer: A
Question: 162
What is the output of the management review and problem solving meeting at the end of Day 1 of PI Planning?
A. PI Objectives
D. Iteration Goal
Answer: C
Question: 163
What should the RTE do if impediments cannot be solved with the ART?
A. Nothing – the RTE is responsible only for the ART level
https://www.certsquestions.com/
Answer: C
Question: 164
Answer: D
Question: 165
B. TRUE
Answer: A
Question: 166
B. FALSE
Answer: A
https://www.certsquestions.com/
Question: 167
B. Scrum Master
D. Business Owner
Answer: A
Question: 168
Answer: A
Question: 169
B. RTE
C. System Architect
D. Product management
Answer: D
https://www.certsquestions.com/
Question: 170
B. RTE
C. Product Owner
D. Product Management
Answer: D
Question: 171
What does Accepted mean in the context of the ROAM risk framework?
A. nothing else can be done and the risk may interfere with the release
Answer: A
Question: 172
The ART vision and events are established during which of the Tuckman stages?
A. Performing
B. Norming
C. Storming
D. Forming
Answer: D
https://www.certsquestions.com/
Question: 173
PI Planning Retrospective is a long and elaborate event to ensure that all possible improvement actions are captured
A. FALSE
B. TRUE
Answer: A
Question: 174
Answer: B
Question: 175
B. Lack of Empathy
C. Absence of Trust
D. Lack of Commitment
Answer: B
https://www.certsquestions.com/
Question: 176
Which of the following Kanban states are to the left of the Backlog column on the Program Kanban?
A. Funnel
B. Analyzing
C. Releasing
D. In Review
Answer: A,B
Question: 177
A. seven
B. three
C. four
D. five
Answer: C
Question: 178
Which of the following are acceptable measures expressed by the M in the SMART model for PI Objectives?
A. quantitative measures
B. a range
C. descriptive measures
Answer: D
https://www.certsquestions.com/
Question: 179
B. Faster implementation
Answer: A,C,D
Question: 180
Answer: A
Question: 181
B. 250 to 300
C. 50 to 125+
D. 30 to 40
Answer: C
https://www.certsquestions.com/
Question: 182
What happens if the teams need to rework their plans due to low confidence level after confidence vote?
A. This is one occasion when the timebox is less important than achieving alignment and the teams should take the
required time they need to rework the plan
B. The low confidence is marked as risk using ROAM and the PI starts as planned
D. The PI is cancelled
Answer: A
Question: 183
Which level of Definition of Done is concerned with capabilities completed by all trains meet acceptance criteria?
A. Team Increment DoD
Answer: B
Question: 184
Which of the below are not part of the CALMR approach to DevOps?
A. Measurement
B. Continuous Improvement
C. Automation
D. Lean Flow
Answer: B
https://www.certsquestions.com/
Question: 185
The ___________ of the Continuous Delivery Pipeline is an Enabler that helps the RTE identify and remove bottlenecks
A. Pareto Analysis
B. Fishbone analysis
D. Process mapping
Answer: C
Question: 186
Which component of the Continuous Delivery Pipeline focuses on creating alignment on what needs to be built?
A. Continuous Integration
B. Continuous Deployment
C. Continuous Exploration
D. Release On Demand
Answer: C
Question: 187
B. System Architect
C. Scrum Masters
D. RTE
Answer: D
https://www.certsquestions.com/
Question: 188
B. ten
C. five
D. eight
Answer: B
Question: 189
B. 3 to 5
C. 15-20
D. 5 to 12
Answer: D
Question: 190
B. Team backlog
C. Program risks
D. PI Objectives
Answer: B
https://www.certsquestions.com/
Question: 191
C. Facilitating PI Planning
Answer: D
Question: 192
B. ROAM
C. STAR
D. WSJF
Answer: A
Question: 193
B. Lack of innovation
Answer: A,B,C
https://www.certsquestions.com/
Question: 194
Which of the following is not an RTE tool used in preparation for PI Planning?
A. Facilities checklist
C. Roadmap
Answer: C
Question: 195
Answer: A
Question: 196
Answer: D
https://www.certsquestions.com/
Question: 197
C. Iteration
Answer: B
Question: 198
Which of the following have their own Definition of Done in SAFe? (Choose three)
A. Epic
B. Team Increment
C. System Increment
D. Release
Answer: B,C,D
Question: 199
Answer: B
https://www.certsquestions.com/
Question: 200
Which artifact aligns expectations among key ART roles, teams, and stakeholders regarding what 'done' actually means?
A. Definition of Ready
B. Acceptance Criteria
C. Functional Specification
D. Definition of Done
Answer: D
Question: 201
B. System Architect
C. Product Owner
D. Enterprise Architect
Answer: C
Question: 202
Which of the following events are facilitated by the RTE? (Choose three)
A. PI Planning
B. Scrum of Scrums
C. Iteration Retrospective
D. PO Sync
E. ART Sync
https://www.certsquestions.com/
Answer: A,B,E
Question: 203
Which artifact shows the sequence of inter-team dependencies for delivering the features?
A. SoS radiator
B. Program Board
Answer: B
Question: 204
Answer: C
Question: 205
Which of the following areas is the main concern of the RTE role?
A. Technology
B. Human Resource
C. Program Execution
https://www.certsquestions.com/
D. Content Management
Answer: C
Question: 206
What is the main concern of having too much preparation for PI Planning?
A. The PI Planning event will become redundant
B. The PI Planning event will be too short to fill the typical timebox
D. This will reduce exploration and affect interaction and emergent design
Answer: D
Question: 207
Which of the following are inputs to the management review and problem solving meeting at the end of Day 1 of PI
Planning? (Choose three)
A. PI Risks
B. PI Objectives
C. ART
D. PI Problems
Answer: A,B,D
Question: 208
The Continuous Delivery Pipeline is part of which of the seven core competencies for business agility?
A. Team and Technical Agility
B. Organizational Agility
https://www.certsquestions.com/
C. Enterprise Solution Delivery
Answer: D
Question: 209
Answer: C
Question: 210
B. SMART
C. ROAM
D. WSJF
Answer: C
Question: 211
https://www.certsquestions.com/
B. Leaving testing or bug fixing to the IP Iteration
Answer: C
Question: 212
Which component of the Continuous Delivery Pipeline focuses on taking features from the Program backlog and
implementing them?
A. Release On Demand
B. Continuous Integration
C. Continuous Exploration
D. Continuous Deployment
Answer: B
Question: 213
B. Annually
Answer: D
https://www.certsquestions.com/
Question: 214
Answer: A
Question: 215
Which is the key problem from the 5 team dysfunctions which leads to the other 4?
A. Lack of Commitment
B. Fear of Conflict
C. Inattention to Results
D. Absence of Trust
Answer: D
Question: 216
B. 30 mins
C. 15 mins
D. 45 mins
Answer: C
https://www.certsquestions.com/
Question: 217
In SAFe, to organize the teams around value, the teams are organized around.... (Choose two)
A. technical competencies
B. features
C. customers
D. components
Answer: B,D
Question: 218
C. Lean-Agile Leadership
Answer: D
Question: 219
B. Product management
C. Business Owners
D. RTE
Answer: C
https://www.certsquestions.com/
Question: 220
What is the output of the problem-solving workshop of the Inspect & Adapt event?
A. Actionable items for improvements
B. PI metrics sheet
Answer: A
Question: 221
Answer: C
Question: 222
Which artifact shows a series of areas representing the amount of work in the different Kanban states?
A. Lead time diagram
B. PI burndown chart
D. WIP Limits
Answer: C
https://www.certsquestions.com/
Question: 223
Answer: A
Question: 224
Which of the following are parts of the Inspect & Adapt event? (select 3 answers)
A. Problem-solving workshop
B. Confidence Voting
C. Quantitative Measurement
D. PI System Demo
Answer: A,C,D
Question: 225
Answer: D
https://www.certsquestions.com/
Question: 226
B. Teams are far more productive than the same number of individuals
Answer: A,B
Question: 227
Which of the following is an indicator of whether achievements fall into an acceptable process control Band?
A. Program predictability measure
D. Process Map
Answer: A
Question: 228
On which part of the Inspect & Adapt event the teams on the train work together to systematically address the larger
impediments that are limiting program velocity by using root cause analysis?
A. Confidence Voting
B. PI System Demo
C. Iteration Retrospective
D. Problem-solving workshop
Answer: D
https://www.certsquestions.com/
Question: 229
B. The RTE
Answer: C
Question: 230
Answer: A
Question: 231
C. 1 day per PI
Answer: B
https://www.certsquestions.com/
Question: 232
B. Senior management
C. RTE
D. Business Owners
Answer: D
Question: 233
Which program level event is used to discuss problems or opportunities with feature development and to assess any
scope adjustments?
A. System Demo
B. ART Sync
C. PO Sync
D. Scrum of Scrums
Answer: C
Question: 234
Which of the below are not part of the CALMR approach to DevOps?
A. Large batches
B. Measurement
C. Culture
D. Automation
Answer: A
https://www.certsquestions.com/
Question: 235
What is displayed above each Kanban column of the Program Kanban and is used to improve flow?
A. Aggregated business value of the items in this column
C. WIP limits
D. WSJF Score
Answer: C
Question: 236
During iteration execution there is a smaller PDCA cycle. Which meeting represents this?
A. Daily Standup
B. Iteration Review
C. Iteration Retrospective
D. System Demo
Answer: A
Question: 237
Answer: A,B
https://www.certsquestions.com/
Question: 238
Which level of Definition of Done is concerned with stories completed by all teams in the ART are integrated?
A. Portfolio Increment DoD
Answer: B
Question: 239
B. Time-bound
C. Testable
D. Task-oriented
Answer: B
Question: 240
Answer: A
https://www.certsquestions.com/
Question: 241
What does the S in the SMART model for PI Objectives stand for?
A. Secondary
B. Solid
C. Special
D. Specific
Answer: D
Question: 242
C. Visualize and limit WIP,increase batch sizes, and manage queue lengths
Answer: B,D
Question: 243
Answer: B
https://www.certsquestions.com/
Question: 244
B. 1 week
C. 2 days
D. 4 hours
Answer: C
Question: 245
Which event helps the teams keep on track and facilitate early identification of risks?
A. Daily Scrum
C. IP iteration
D. Scrum of Scrums
Answer: D
Question: 246
B. PI Planning
C. PI System Demo
Answer: D
https://www.certsquestions.com/
Question: 247
Which team event expresses the “Check” step of the PDCA cycle?
A. Daily Standup
B. Iteration Planning
C. Iteration Retrospective
D. Team Demo
Answer: D
Question: 248
Answer: A
Question: 249
Who facilitates the management review and problem solving meeting at the end of Day 1 of PI Planning?
A. Business Owner
B. RTE
C. System Architect
Answer: B
https://www.certsquestions.com/
Question: 250
As the ART matures, teams typically migrate from __________ teams to ___________ teams
A. smaller, bigger
B. cross-functional, self-organizing
C. feature, component
D. component, feature
Answer: D
Question: 251
B. Features
C. Dependencies
D. Milestones
Answer: A
Question: 252
Which of the following are recommended approaches used to maximize velocity? (Choose two)
A. minimizing dependencies
B. compromising quality
C. maximizing hand-offs
D. minimizing hand-offs
Answer: A,D
https://www.certsquestions.com/
Question: 253
In SAFe, what provides for cadence-based planning and is an estimating guard band for cadence-based delivery?
A. Inspect & Adapt
B. Iteration
C. IP Iteration
D. Iteration Review
Answer: C
Question: 254
B. System Architect
C. Business Owners
D. RTE
Answer: A
Question: 255
Who has design authority and prioritizes the architectural work at an ART level?
A. RTE
B. Enterprise Architect
C. System Architect
D. System Team
Answer: C
https://www.certsquestions.com/
Question: 256
B. Scrum Master
C. Line Manager
Answer: C
Question: 257
B. Servant
C. Strategic
D. Transformational
Answer: B
Question: 258
B. Human Resource
C. Program Execution
D. Technology
Answer: A
https://www.certsquestions.com/
Question: 259
The number of items that can be finished per unit of time is called
A. throughput
B. cycle time
C. velocity
D. lead time
Answer: A
Question: 260
Which level of requirements are stored in the Program Backlog? (Choose two)
A. Enablers
B. Tasks
C. User stories
D. Features
Answer: A,D
Question: 261
Which of the following are key program level events? (Choose three)
A. Business Owners Sync
B. ART Sync
C. PO Sync
D. Scrum of Scrums
Answer: B,C,D
https://www.certsquestions.com/
Question: 262
B. In T shirt size
D. On a scale from 1 to 10
Answer: D
Question: 263
B. Faster implementation
Answer: A,C,D
Question: 264
Which component of the Continuous Delivery Pipeline takes the changes from the staging environment and deploys them
to production?
A. Continuous Exploration
B. Continuous Deployment
C. Continuous Integration
D. Release On Demand
Answer: B
https://www.certsquestions.com/
Question: 265
Which from the below are typical program measures of a cumulative flow diagram? (Choose three)
A. Business value
B. Lead time
C. WIP limits
D. Throughput
Answer: B,C,D
Question: 266
What is used to make process policies and decisions visible to the entire ART?
A. Program Kanban Board
Answer: A
Question: 267
B. Iteration Goal
C. PI Objectives
D. Team Backlog
Answer: B
https://www.certsquestions.com/
Question: 268
Which of the following is not one of the four stages which are characteristic for team development?
A. Performing
B. Forming
C. Storming
D. Integrating
Answer: D
Question: 269
When does management review and problem solving meeting take place in PI Planning?
A. At the beginning of Day 1
Answer: C
Question: 270
Which level of Definition of Done is concerned with user stories satisfying the acceptance criteria?
A. Portfolio Increment DoD
Answer: C
https://www.certsquestions.com/
Question: 271
Answer: C
Question: 272
Which artifact shows the progress being made toward the Program Increment timebox?
A. Cumulative Flow Diagram
D. WIP Limits
Answer: B
Question: 273
Which Program Level event is used to create visibility into how well the ART is progressing toward meeting the program
Pl Objectives?
A. ART Sync
B. System Demo
C. PO Sync
D. Scrum of Scrums
Answer: C
https://www.certsquestions.com/
Question: 274
Which of the following areas is the main concern of the System Architect/Engineer?
A. Content Management
B. Human Resource
C. Technology
D. Program Execution
Answer: C
Question: 275
Where are the actions which are outcome of the problem-solving workshop during Inspect & Adapt stored?
A. in the risk sheet
B. in a database
Answer: C
Question: 276
B. Lack of Empathy
C. Fear of Conflict
D. Absence of Trust
Answer: C
https://www.certsquestions.com/
Question: 277
B. The Agile Teams on the ART take preference over the System Team
C. There needs to be a balance between the System Team and the Agile Teams on the Train
D. The System team takes preference over the Agile Teams on the ART
Answer: C
Question: 278
In SAFe the smallest cadence at which the team delivers potentially shippable work product is called ___
A. Program Increment
B. Portfolio Increment
C. Product Increment
D. Iteration
Answer: D
Question: 279
What is the output of the management review and problem solving meeting at the end of Day 1 of PI Planning?
A. Iteration Goal
D. PI Objectives
Answer: C
https://www.certsquestions.com/
Question: 280
Which program level event is focused on overall program execution and impediment escalation?
A. ART Sync
B. Scrum of Scrums
C. System Demo
D. PO Sync
Answer: B
Question: 281
Which meeting aligns all team members to the common goals of the team as defined by the Team PI Objectives?
A. Iteration Review
B. Iteration Planning
C. Iteration Retrospective
Answer: B
Question: 282
The ART vision and events are established during which of the Tuckman stages?
A. Performing
B. Storming
C. Norming
D. Forming
Answer: D
https://www.certsquestions.com/
Question: 283
What happens if during PI Planning the confidence vote of a team or overall is low?
A. Rework the plan
D. Cancel the PI
Answer: A
Question: 284
B. four
C. five
D. seven
Answer: B
Question: 285
B. Scrum Master
D. Business Owner
Answer: A
https://www.certsquestions.com/
Question: 286
B. Epic Owners
C. System team
D. RTE
Answer: B
Question: 287
Results are empirically reviewed at every System Demo and Pl Planning event and this helps to overcome which team
dysfunction?
A. Fear of Conflict
B. Lack of Commitment
C. Inattention to results
D. Absence of Trust
Answer: C
Question: 288
Which of the following is the recommended approach to create T-shaped skills on the ART?
A. Cross-training
B. Pair-programming
Answer: C
https://www.certsquestions.com/
Question: 289
In which stage of team development the team resolves initial conflicts and difficulties in establishing a shared
understanding?
A. Forming
B. Storming
C. Performing
D. Norming
Answer: B
Question: 290
Which of the below are not part of the CALMR approach to DevOps?
A. Lean Flow
B. Measurement
C. Culture
D. Authentication
Answer: D
Question: 291
What should the RTE do if impediments cannot be solved with the ART?
A. Hold a Scrum of Scrums event
Answer: D
https://www.certsquestions.com/
Question: 292
Answer: A
Question: 293
Which team event ensures that relentless improvement - one of the pillars of SAFe's Lean-Agile Mindset - is happening at
the Team Level?
A. Iteration Review
B. Iteration Retrospective
D. System Demo
Answer: B
Question: 294
B. Norming
C. Storming
D. Forming
Answer: B
https://www.certsquestions.com/
Question: 295
Answer: B
Question: 296
When is the first formal integration point among teams on the Agile Release Train (ART)?
A. During the IP Iteration
B. Team demo
D. I&A event
Answer: C
Question: 297
Which of the following roles are involved into the preparation of the Program Backlog for PI Planning? (Choose two)
A. RTE
B. Product management
C. Enterprise Architect
D. Epic Owners
Answer: A,B
https://www.certsquestions.com/
Question: 298
D. uses empathy
Answer: C
Question: 299
B. Team names
C. Kanban states
D. Iterations
Answer: D
Question: 300
B. RTE
D. System Architect
Answer: C,D