Process Flow Chart Stator Cleating Stack

This document is a process flow chart that outlines the steps for manufacturing a cleated stator stack. It includes 7 main operations: 1) Raw material receipt and inspection, 2) Slitting of wide coils, 3) Blanking, 4) Stator punching, 5) Stator stacking, 6) Pre-dispatch inspection, and 7) Packing/dispatch. Each operation has incoming sources of variation listed that could cause the material to be rejected and returned to a previous step. The chart notes that any reworked material will be reinspected before final approval and dispatch.

Uploaded by

Vipin Jangra
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views

Process Flow Chart Stator Cleating Stack

This document is a process flow chart that outlines the steps for manufacturing a cleated stator stack. It includes 7 main operations: 1) Raw material receipt and inspection, 2) Slitting of wide coils, 3) Blanking, 4) Stator punching, 5) Stator stacking, 6) Pre-dispatch inspection, and 7) Packing/dispatch. Each operation has incoming sources of variation listed that could cause the material to be rejected and returned to a previous step. The chart notes that any reworked material will be reinspected before final approval and dispatch.

Uploaded by

Vipin Jangra
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Doc. No. : Doc.

Date :
Process Flow Chart Rev. No. : Rev. Date :
Core Team :
Model/Frame Size : M2BAX280S(A6)-200mm Drg. No. : 3GZH133028-6 Part Name : Cleated Stator Stack
Process Flow Machine/
Opn. No. : Operation Incoming Sourses of Location Jig/
Description Variation R Tools.

Return to Supplier
Wrong Material Receipt R Test Parameter
Move By Truck
R.M. Receipt & OK
Storage Raw
Material inspection
10 Not matched with
Specification Move By Forklift
Reject
R Slitting M/c

Slitting of Wide Coils Wrong Slitting OK

Move By Crane

Reject
20 Incoming Wrong Material Receipt R Crane

OK

Move By Crane

Power Press &


30 Blanking Improper Dimensions Reject
R Blanking Tool

OK

Move By Trolly

Notching M/c
40 Stator Punching Improper Dimensions Reject & Punching
R Tool

OK

Move By Trolly

Hydraulic Press
50 Stator Stacking Improper Dimensions Reject & Stacking
R fixture

OK

Move By Trolly

Pre Dispatch
60 Inspection
Improper Dimensions Reject
R

OK

Move By Trolly

1) Improper Packing Reject


70 Packing / Dispatch
2) Packing Material R
3) Improper Dispatch
Detail
OK

Dispatch

Raw Material
Receiving
Inspection Storage Transport Operation Packing R Reject

Prepared By : Approved by (CFT) :

If any rework take place at any stage og production it will be again inspected & will be given approval for dispatch.
Note :
Note :
Key/Special characterstics identified by CFT.