Process Flow Chart Stator Cleating Stack
Process Flow Chart Stator Cleating Stack
Date :
Process Flow Chart Rev. No. : Rev. Date :
Core Team :
Model/Frame Size : M2BAX280S(A6)-200mm Drg. No. : 3GZH133028-6 Part Name : Cleated Stator Stack
Process Flow Machine/
Opn. No. : Operation Incoming Sourses of Location Jig/
Description Variation R Tools.
Return to Supplier
Wrong Material Receipt R Test Parameter
Move By Truck
R.M. Receipt & OK
Storage Raw
Material inspection
10 Not matched with
Specification Move By Forklift
Reject
R Slitting M/c
Move By Crane
Reject
20 Incoming Wrong Material Receipt R Crane
OK
Move By Crane
OK
Move By Trolly
Notching M/c
40 Stator Punching Improper Dimensions Reject & Punching
R Tool
OK
Move By Trolly
Hydraulic Press
50 Stator Stacking Improper Dimensions Reject & Stacking
R fixture
OK
Move By Trolly
Pre Dispatch
60 Inspection
Improper Dimensions Reject
R
OK
Move By Trolly
Dispatch
Raw Material
Receiving
Inspection Storage Transport Operation Packing R Reject
If any rework take place at any stage og production it will be again inspected & will be given approval for dispatch.
Note :
Note :
Key/Special characterstics identified by CFT.