0% found this document useful (0 votes)
377 views25 pages

Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022)

The document contains questions about unpacking, configuring, and installing the ZDLRA hardware and software. It includes over 40 multiple choice questions about topics like hardware components, installation steps, and configuration scripts. The questions cover both initial hardware setup and the subsequent software configuration performed using scripts like ra_preinstall.pl and ra_install.pl.

Uploaded by

Josip Belina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
377 views25 pages

Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022)

The document contains questions about unpacking, configuring, and installing the ZDLRA hardware and software. It includes over 40 multiple choice questions about topics like hardware components, installation steps, and configuration scripts. The questions cover both initial hardware setup and the subsequent software configuration performed using scripts like ra_preinstall.pl and ra_install.pl.

Uploaded by

Josip Belina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

1. What steps should be performed when unpacking the ZDLRA for the first time?

(Choose all correct answers)

Open up an Installation SR
Assemble the spare parts
Collect the Customer Information Sheets (*)
Verify all parts have arrived (*)
Correct !
(1/1) Points
2. What command do you use to check the infiniband topology?
verify-toplogy (*)
cellcli
check-ib
dbmcli
Correct !
(1/1) Points
3. What do Recovery Appliance systems come configured with upon delivery?
(Choose all correct answers)

Enterprise Manager Agents


IP Address (*)
RMAN Configuration
Name (*)
Correct !
(1/1) Points
4. Where can you go to find documentation related to the hardware installation?
ZDLRA Hardware Installation Guide
ZDLRA Owner's Guide (*)
MOS Note 238134.1
DB Backup and Recovery Guide
Correct !
(1/1) Points
5. What is the default password for most users on the ZDLRA?
oracle (*)
welcome1
manager
zdlra1
Correct !
6. What activities are done during network updates?
(Choose all correct answers)

Set the clock and timezone (*)


Check the spanning tree on the uplink port (*)
Configure the NTP servers (*)
Connect to the network and update the firmware
Delete the default NTP server
Correct !
(1/1) Points
7. How do you prevent duplicate IP conflicts?
Use the IP addresses suggested by Oracle
Use IPv6 instead of IPv4
Assign every 3rd IP address in sequence to the ZDLRA
Connect to the customer network after IPs have been re-configured (*)
Correct !
(1/1) Points
8. What is the major difference between the Fiber cards on Exadata and fiber cards
on ZDLRA?
Fiber cards can be connected to ZDLRA only (*)
Fiber cards can be connected to Exadata only
Fiber cards cannot be connected to Exadata or ZDLRA
Fiber cards are installed on ZDLRA Storage Nodes
Fiber cards are used to connect the ZDLRA to the protected databases
Correct !
(1/1) Points
9. What does PDU stand for?
Performance Distribution Unit
Performance Delivery Unit
Power Delivery Unit (*)
Plain Deconstruction Unit
Correct !
(1/1) Points
10. When working with the PDU, how can you verify that you are running the
current version?
cellcli -version all
dbmcli pdu -version (*)
Connect to each PDU's webpage
verify-pdu -version
Correct !
11. How many database nodes are included in the base rack configuration?
3
4
2 (*)
6
1
Correct !
(1/1) Points
12. Once the hardware installation is complete what should be done next?
Disconnect the systems from the customer network
Handoff the system to the customer to begin database protection
Handoff the system to the engineer for OEDA configuration (*)
Connect the systems to the customers network
Correct !
(1/1) Points
13. How many storage nodes are included in the base rack configuration?
3 (*)
1
6
4
2
Correct !
(1/1) Points
14. When should you connect the Recovery Appliane rack to the customer's
network?
At any time during the install
After the initial config (*)
As soon as the rack is delivered
Before the initial config
Correct !
(1/1) Points
15. What items do you verify when performing initial activities on the storage cells?
(Choose all correct answers)

Use CellCLI for MS Service startup (*)


Verify infiniband conections (*)
Verify all 16 disks
Use DBMCLI for MS Service startup
Verify NVMe logical devices (*)
Correct !

16. What are the maximum number of database nodes in a ZDLRA rack?

6
2 (*)
There is no max
4
Correct !
(1/1) Points
ZDLRA Software Configuration
(Answer all questions in this section)
17. What systems can be configured with OEDA?
(Choose all correct answers)

Exalogic
SuperCluster (*)
Recovery Appliance (*)
Exadata (*)
Oracle Cloud Machine
Correct !
(1/1) Points
18. Which installation software script performs additional configuration steps on
the recovery appliance?
ra_preinstall.pl
ra_install.pl (*)
install.sh
oeda_check.sh
Correct !
(1/1) Points
19. What does reclaiming disk space do on the Recovery Appliance?
Defragments the storage nodes to ensure optimal storage usage
Deletes all the install files
Connect to the network and update the firmware
Converts the Linux system to four disks in a RAID-5 configuration (*)
Defragments the compute nodes to ensure optimal storage usage
Correct !
(1/1) Points
20. What step in ra_install.pl gets the system prepped to become a ZDLRA?
OS Setup (*)
DBFS Setup
Validation and Configuration Prep
Tape Backup configuration
Correct !
21. What targets can be managed by the Recovery Appliance?
(Choose all correct answers)

Database (*)
Automatic Storage Management (*)
Cluster (*)
Backup Pool
Correct !
(1/1) Points
22. Which installation software script enables the ZDLRA services on the recovery
appliance?
ra_preinstall.pl
oeda_check.sh
install.sh
ra_install.pl (*)
Incorrect, ra_install.pl enables the ZDLRA services on the recovery appliance
(0/1) Points
23. Which installation software script configures the networks on the recovery
appliance?
oeda_check.sh
install.sh (*)
ra_install.pl
ra_preinstall.pl
Correct !
(1/1) Points
24. Which installation software script performs initial checks on the recovery
appliance?
ra_preinstall.pl (*)
ra_install.pl
install.sh
oeda_check.sh
Correct !
(1/1) Points
25. Before performing the SW configuration, what tasks should be done?
(Choose all correct answers)

Execute preinstall_check.pl
Go through config.sh with the customer (*)
Walk through the install plan and expectations with the customer (*)
Execute ra_preinstall.pl
Correct !
26. Where should the enterprise manager agents be installed on the Recovery
Appliance?
On each storage node disk
On the compute nodes (*)
On the storage nodes
On the compute and storage nodes
Correct !
(1/1) Points
27. Where can you find information on configuring and administering the ZDLRA?
MOS Note 238134.1
ZDLRA Administrator's Guide (*)
ZDLRA Configuration and Administration Guide
ZDLRA Owner's Guide
Correct !
(1/1) Points
28. Select some of the prerequisites for installing the software on the Recovery
Appliance.
(Choose all correct answers)

OEDA was used to perform the Exadata portion of the install


OEDA was used to generate the config files (*)
checkip script ran successfully (*)
All components of all new racks are configured (*)
Correct !
(1/1) Points
29. Which installation software script creates the cell and grid disks on the recovery
appliance?
install.sh (*)
ra_install.pl
oeda_check.sh
ra_preinstall.pl
Correct !
(1/1) Points
30. Which installation software script uses files generated by OEDA on the recovery
appliance?
ra_install.pl
install.sh (*)
ra_preinstall.pl
oeda_check.sh
Correct !
31. Select 2 files created from the inputs of the OEDA.
(Choose all correct answers)

customer_name-rack_name.zip (*)
customer_name-rack_name.xml (*)
Correct !
(1/1) Points
ZDLRA RA21 Assessment
(Answer all questions in this section)
32. RA21 reserves which PCIe Slot for the optional Qlogic Fiber Channel Card?
PCIe 3
PCIe 4
PCIe 1 (*)
PCIe 2
Incorrect! Please review the course content and try again.
(0/1) Points
33. RA21 has better performance and more capacity than the ZDLRA X9M.
True
False (*)
Correct !
(1/1) Points
34. What rack configurations are valid for the RA21? Choose all that apply.
(Choose all correct answers)

RA21 will intermix a variety of X8 and X9 Database servers from the factory.
RA21 will allow intermixing of Storage servers post install per upgrade/expansion
process. (*)
RA21 will not intermix X8 and X9 Database servers from the factory. (*)
RA21 will not intermix X8 and X9 Storage servers from the factory. (*)
RA21 will intermix a variety of X8 and X9 Storage servers from the factory.
Incorrect! Please review the course content and try again.
(0/1) Points
35. How many Storage Servers are allowed in the RA21 Full Rack?
9
18 (*)
12
22
Incorrect! Please review the course content and try again.
36. The Exadata or ZDLRA X9M platforms allow RoCE Fabric Switches to be replaced
from the front of the rack.
True (*)
False
Incorrect! Please review the course content and try again.
(0/1) Points
37. Which two of the following are true, in respect to how Linux Ethernet device
enumeration occurs between the three Exadata X9M PCIe slots? Select two
answers.
(Choose all correct answers)
The dual-port SFP28 25Gb ports are enumerated from top-to-bottom when
installed in an X9M-8, and right-to-left when installed in an X9M-2. (*)
The devices are always enumerated with eth1 – eth4, for PCIe slot 1 network ports,
eth5 – eth8, for PCIe slot2 ports, and eth9 – eth12 for PCIe slot3 ports. (*)
The devices for PCIe slots 1 through 3 will be in a mixed enumeration, depending
on what dual-port SFP28 25Gb and quad-port RJ45 10Gb cards are selected, and
how they are mixed-and-matched between the slots.
The quad-port RJ45 10Gb ports are enumerated from top-to-bottom, right-to-left
when installed in an X9M-2.
Incorrect! Please review the course content and try again.
(0/1) Points
38. On an Exadata X9M multi-rack, the RoCE leaf interlinks have increased from
four to seven when compared to the X8M.
True (*)
False
Correct!
(1/1) Points
39. Which of the following are true of the Exadata X9M Database Server? Select all
that apply.
Contains 32-core Ice Lake Intel processors
Increased Memory Capacity – 512 GB standard, 1 TB, and 2 TB-DDR4-3200MT/s
2x 3.84 TB NVMe Disks expandable to 4x 3.84 TB NVMe Disks
Based on PCIe Gen4 architecture
All of the above (*)
Correct!
(1/1) Points
40. Like the Exadata X8M, the Exadata X9M platform database servers contain two
onboard SFP28 and RJ45 ports, giving customers the choice between either pair.
True
False (*)
Incorrect! Please review the course content and try again.
41. The Exadata X9M platform increases the RDMA Network Fabric speeds from 100
Gb/s to 200 Gb/s.
True
False (*)
Correct!
(1/1) Points
42. Which of the following are true for the Exadata X9M Storage Servers? Select all
that apply.
(Choose all correct answers)

Contains 36-core Ice Lake Intel processors


Contains new DDR4-3200 memory, in increased capacity of 256GB (*)
NVMe flash – F320v3 (capacity – 3.2 TB)
Persistent memory – Intel Optane PMem Series 200 (same capacity – 1.5 TB) (*)
All of the above
Incorrect! Please review the course content and try again.
(0/1) Points
43. What is the primary reason the X9M racks now use standard-length 3 meter
cables, versus the mixed-length cables on previous platforms?
Because having extra slack of power cables, in the side-panels and rear of the
cabinet, is attractive.
The extra cable length is required to attach to the neighboring rack.
Higher power draw of X9 servers required more flexibility in PDU group balancing,
resulting in the need to increase from 2M to 3M. (*)
Incorrect! Please review the course content and try again.
(0/1) Points
EIS Installation Best Practices Online Assessment
(Answer all questions in this section)
44. What two activities are accomplished during Installation Task Planning step in
the EIS Methodology?
(Choose all correct answers)

Organization of the team who will actively work the Installation (*)
Networking and system component cabling
Communicate schedule for installation to the customer (*)
System unpacking and acclimatization
Review the timeframe options for delivery of the service
Correct!
(1/1) Points
45. What is the purpose for the Operational Handover step in the EIS Methodology?
Perform system testing and diagnostics
Used to negate responsibility for any ongoing System issues
Documents the installation and configuration of Customer's system(s) (*)
Documents how to use the EIS documentation and standards
Correct!
46. When should the Site-Audit be performed?
After the system has been acclimatized and is ready for unpacking at the customer
site
As soon as possible, and certainly prior to delivery of the system (*)
Prior to the completion of the sale, in order to ensure that the customer’s location
is viable
As soon as the product has been delivered to the customer
Correct!
(1/1) Points
47. What are the four key points covered in each test topic of the Test Procedures
Plan?
(Choose all correct answers)

Method (*)
Test Result (*)
Outcome (*)
Conclusion
Objective (*)
Prerequisites
Correct!
(1/1) Points
48. What three typical activities are done during the Project Initiation phase of the
EIS Methodology?
(Choose all correct answers)

The EIS Site-Audit is scheduled (*)


Details about the project are identified and documented, for example, is this a
single system installation or a complex, multi-product installation (*)
Details about the customer are determined and documented (*)
System configuration details are documented.
System delivery occurs, and the project commences
Correct!
(1/1) Points
49. What are three items in the EIS Site-Audit Report are documented for all Oracle
hardware?
(Choose all correct answers)

Access Route requirements (*)


Operating System requirements
Facility Power requirements (*)
IP Address requirements
Operating Environment and Cooling requirements (*)
Correct!
(1/1) Points
50. Why should you use the EIS methodology to guide your installation process?
Using the proven EIS methodology will provide step-by-step installation guidelines,
help guarantee a quality installation, make your life easier, and ensure customer
satisfaction (*)
The EIS methodology provides a 20% discount on Support Services if you install
your customers’ hardware or software using it
Installation processes are very lengthy, the EIS methodology is quick and dirty
Larry Ellison has mandated using EIS
Correct!
51. What are two activities that take place during the System Test step of the EIS
methodology?
(Choose all correct answers)

Electrical grounding and environmental assessment


Application installation, configuration, and testing
On Solaris-based systems, Oracle's Explorer Data Collector will be run and the
results evaluated with ORAS/CLI from the EIS-DVD (*)
Tests specified in the Test Procedures Plan Plan will be carried performed (*)
Correct!
(1/1) Points
52. Why it is important to do Installation planning, rather than just asking the
customer as you work through the installation process? (Select three)
(Choose all correct answers)
Support Services will not engage on services requests if no installation planning was
done
Pricing for Installation Services is less expensive if planning in not included
Continuing interruptions can detract from the professionalism of your work, and
lead to customer dissatisfaction (*)
Planning leads to more thoughtful consideration for a predictable outcome of the
installation process (*)
Customer technical contact may not be readily available (*)
Correct!
(1/1) Points
53. Why do the EIS Standards recommend that external cables between Oracle
hardware, such as servers, storage devices, network devices and ports be clearly
labeled?
Cable routing should be done with rubber bands for ease of reconfiguration
Labeling is not an EIS best practice
Service requests for field diagnostics will not be accepted unless cables are labeled

For ease of maintenance it should be unambiguously clear from the label on each
cable, where the cable has to be attached (*)
Correct!
(1/1) Points
54. What is the primary purpose of the”Basic Solaris” standard?
Describes how to install legacy versions of Solaris on systems that need to support
backward compatible applications
Specifically describes how to install Solaris on non-SPARC hardware
Defines a method for achieving a consistent installation for Oracle Servers with
Solaris OS (*)
Differentiates between Linux and Solaris installation processes on dual-boot
systems
Correct!
(1/1) Points
55. Which four documents are included as part of the Operational Handover?
(Choose all correct answers)

Installation and Configuration Plan (*)


MOS Internal Documentation
EIS Checklist for the System installed
Test Procedures Plan (*)
System Documentation
Site Audit Report (*)
Incorrect! Please review the course content and try again.
56. When should you review deliverables and why?
EIS deliverables are used as a last step in the installation process to ensure the
installer provided everything that is required
Ideally EIS deliverables would be reviewed at the very start of an installation project,
as they clearly define scope, roles and responsibilities, and project deliverables (*)

EIS deliverables are an interim checklist to ensure that at the mid-way point of an
installation the project remains on track.
EIS deliverables are included in the Oracle system shipping and packaging
documents near the start of an installation
Correct!
(1/1) Points
57. What should you do if you believe you have found an error in an EIS checklist?
Submit your concerns to My Oracle Support
Assume that the EIS team is already aware and the next version of the checklist will
be updated
Follow the feedback method on the last page of every checklist: email SUPPORT-
[email protected] (*)
Email Larry Ellison and recommend changes
Correct!
(1/1) Points
58. Which two EIS documents are most useful during the Installation and
Configuration of Oracle Hardware and Software step?
(Choose all correct answers)

Installation Configuration Plan (*)


DVD
Site-Audit Report
EIS Checklist (*)
Operational Handover Agreement
Correct!
(1/1) Points
59. If the customer has asked for some customization of their installation, how is
testing for that accomplished? Choose all responses that apply.
(Choose all correct answers)
Oracle is automatically responsible for any non-standard installation procedure,
regardless of whether they were agree to as part of the Installation and
Configuration Plan
Testing above and beyond the Covered System Tests are at the sole discretion of
Oracle and/or the Partner installer (*)
Additional tests can be inserted into the Test Procedures plan (*)
Not all installation actions need testing
Correct!
(1/1) Points
60. Which four objectives are primary goals for an EIS Site Audit?
(Choose all correct answers)
Determine the availability of required electrical power to run and maintain the
System (*)
Determine how frequently system backups will be completed
Determine how many logical domains need to be configured on the system
Determine the environmental conditions at Customer's site including temperature,
humidity, cleanliness and such other assessments as are determined to be
necessary in Oracle's sole discretion (*)
Determine the floor weight load capacity at the location where the System will be
installed (*)
Determine installation needs for the System, including such assessments as: the
suitability of access routes to the installation location, such as doors, elevators,
floor strengths and ramps (*)
Correct!
61. Why should you typically complete the Installation Configuration Plan and
create your Test Procedures Plan at the same time?
As you work through the system configuration process with your customer, you
should state how you will test key items in the system’s configuration for having
been successfully completed. (*)
You should create the Test Procedures Plan after you have completed the system
installation and configuration.
Test Procedures plan is a standard document used in all generic system
installations.
Correct!
(1/1) Points
62. According to the EIS methodology, when issues are uncovered during the Site-
Audit, who should be notified?
(Choose all correct answers)

Installation coordinator if applicable (*)


Oracle Premier Support
Oracle sales management
Customer point of contact (*)
Correct!
(1/1) Points
63. You are assigned to an installation project in France in February to install 5 new
SPARC T5 servers. The servers, in their original packaging, are sitting in the
customer’s loading dock with a temperature of 8 degrees C (46 degrees F). The
customer’s data center is 20 degrees C (68 degrees F). What is the recommended
next step in acclimating these systems?
Unpack the servers and store in the data center
Move the systems (still packed) into the data center
Unpack the servers and store in the loading dock
Move the systems (still packed) into a room with a similar environment to the data
center (*)
Correct!
(1/1) Points
64. Who is involved in the Project Initiation phase?
(Choose all correct answers)

3rd party Service Provider


Oracle Financing contact
Customer point of contact (*)
Partner point of contact (*)
Oracle Installation Coordinator or Project Manager (if applicable) (*)
Correct!
(1/1) Points
65. What are three factors that influence how long a system (server, storage,
engineered system) will require to be acclimatized after delivery to a customer,
before power can be applied without causing damage?
(Choose all correct answers)

timezone
data center space
humidity (*)
cleanliness (*)
temperature (*)
Correct!
66. Name two functions for the EIS-DVD during the Installation and Configuration of
Oracle Hardware and Software step in the EIS methodology?
(Choose all correct answers)

Contains required patches and firmware for most installations (*)


Used as a back-up for complete documentation sets that are on
http://docs.oracle.com
Provides installation assessment and diagnostic tools (*)
Provides an excellent tool as a leave behind utility for customers
Correct!
(1/1) Points
67. For safety awareness with respect to grounding, if a system has been modified
after the manufacturer's assembly process, what three recommendations does the
EIS Grounding Standard make?
(Choose all correct answers)

If the temperature is below 60 degrees F., warm the room first before power ON
If qualified personnel did not test the safety of the modified system then proper
testing should be requested before Oracle and/or partner personnel will work on
the equipment (*)
Check whether the modification involved any power supplies, distribution units or
wiring? (*)
If modifications involved any power supplies, distribution units or wiring, did
qualified personnel verify that the modification was was correct and did they test
the system to ensure that it doesn't pose any safety hazard? (*)
Determine whether the local electrician can support the installation process
Correct!
(1/1) Points
68. What if the customer has their own labeling methodology that differs from the
recommended one from EIS?
Follow the customer's standard for cable labeling provided it meets with EIS
requirements for identification and port location. (*)
Submit a Service Request for Oracle approval on use of the customer labeling and
routing methods
Redo cabling throughout the datacenter to meet the EIS standard
Ignore the customer’s standard and use the EIS standard
Correct!
(1/1) Points
69. What are the two primary objectives for the Installation Configuration Planning
step of the EIS methodology?
(Choose all correct answers)
Oracle/Partner confirms power and cooling requirements for system installation

Tests that will be performed during the Systems Testing will be defined. (*)
Customer provides walk-through of installation site
Oracle/Partner and Customer will determine and mutually agree upon the
hardware and software installation requirements which will be documented in the
Installation and Configuration Plan (*)
Correct!
(1/1) Points
70. What four tasks are typically happening at the EIS Planning and Preparation
stage in the installation process?
(Choose all correct answers)

Cable and install systems into custom rack


Begin work on Project Schedule
Compile EIS planning documents (*)
Identify Installation team – Oracle Installation Coordinator, Project Manager,
Customer Point of Contact, others as needed (*)
Notification of Customer Installation project (*)
Unpack and power ON systems
Incorrect! Please review the course content and try again.
71. What is the primary goal of the Installation and Configuration of Oracle
Hardware and Software step in the EIS methodology?
Managing transition from Installation phase to Field Service issue recording
Hardware cabling , wiring and Power ON
Troubleshooting software configuration issues
System acclimatization, installation, and basic configuration (*)
Correct!
(1/1) Points
72. What should you do with the EIS checklist when an installation project is
complete?
Crumple the checklist and throw it in the customer wastepaper bin
Remove the EIS checklist and other confidential Oracle Intellectual Property from
the customer datacenter (*)
Leave the EIS checklist with the customer so that they can re-install when they need
to
Post the EIS checklist and Test Procedures Plan to My Oracle Support under your
customer’s account
Correct!
(1/1) Points
73. Why is the rate of temperature change when acclimatizing systems such an
important factor as described in the EIS methodology?
Variations in temperature should not exceed the approved gradient of
approximately 2° C (4° F) per hour, because ignoring this may could lead to long-
term damage (hair-cracks) on the boards (*)
It is actually not relevant or important
Systems should be warmed up and powered ON as quickly as possible to optimize
the installation project timeline
Variations in temperature do not have as big an impact as do Service contract
considerations for how long an installation will take
Correct!
(1/1) Points
74. What are two cautions that should be acknowledged when acclimatizing a
system?
(Choose all correct answers)
The maximum positive or negative temperature gradient that is permitted for
multi-layer boards is approximately 2° C (4° F) per hour. (*)
Once powered on the temperature is no longer an issue, as internal cooling
systems commence
Avoid unpacking items inside the computer centre (dust/dirt contaminating filters
etc.) (*)
Powering ON the system will speed the acclimatization process as the heat from
the system will accelerate its warming
Correct!
(1/1) Points
75. What three documents are typically used as part of the EIS Planning and
Preparation stage in the installation process?
(Choose all correct answers)

Operational Hand-off Form


Site Audit Report (*)
Project Schedule
Test Procedures Plan (*)
Installation and Configuration Plan (*)
Acclimatization Report
Correct!
76. What are the new tags used for multi-rack configurations?
mleaf, msleaf, and mleaf23 (*)
mleafsw1, mleafsf, mleafsp
Leaf1, leaf2, leaf3
mrleaf, mrsfleaf, mrleaf28
Correct !
(1/1) Points
77. We now use patchmgr to apply the Golden Config on the RoCE Network Fabric
switches.
True (*)
False
Incorrect! Please review the course content and try again.
(0/1) Points
78. There are now 3 RoCE X9M Golden Config multi-rack templates.
False
True (*)
Incorrect! Please review the course content and try again.
(0/1) Points
79. When multi-racking a new Exadata X9M rack to an existing Exadata X8M rack,
additional uplinks will need to be added to the X8M rack.
False
True (*)
Incorrect! Please review the course content and try again.
(0/1) Points
80. How many uplinks per rack are now needed for multi-racking the Exadata X9M?
28 (*)
7
14
56
Correct !
81. If you expand an Exadata X8M quarter rack with Exadata X9M servers to make it
a full rack, then you must implement the 7 uplinks from leaf to spine to avoid over-
subscription.
False
True (*)
Incorrect! Please review the course content and try again.
(0/1) Points
82. What is the maximum number of racks that can be multi-racked with Exadata
X9M?
12 (*)
18
16
8
Incorrect! Please review the course content and try again.
(0/1) Points
83. When adding a ZFS Appliance to the RDMA Network Fabric of a multi-racked
Exadata X9M, 2 hosts will have to be removed from the rack.
True (*)
False
Incorrect! Please review the course content and try again.
(0/1) Points
84. What is the primary change to the X9M Golden Config for the RoCE leaf
switches?
Port 1-3 and 34-36 are now configured as router ports and connected to the
spines. (*)
One Golden Config for all deployment types.
All network ports on the leaf switches are configured as Edge ports
The Golden Config is on the leaf switch from the factory
Incorrect! Please review the course content and try again.
(0/1) Points
85. Where can you find the multi-rack EIS checklists?
https://exadata.us.oracle.com
https://docs.oracle.com
https://eis.us.oracle.com (*)
All of the above
Incorrect! Please review the course content and try again.
86. Why does Exadata X9M require 7 uplinks from leaf to spine vs 4 uplinks on
previous generations?
To enable secure fabric between switches
To eliminate dropped packets
There is a significant increase in over-subscription due to Gen4 PCIe speeds on
Exadata X9m requiring additional uplinks from leaf to spine. (*)
To increase the throughput to 400 gb/s
Correct !
(1/1) Points
Exadata X9M TOI – ZDLRA X9M Updates Assessment
(Answer all questions in this section)
87. The usable space for ZDLRA X9M Full Rack High Redundancy is _____?
395TB
1260TB
794TB (*)
628TB
Correct!
(1/1) Points
88. Which General Expansion Rules still apply to ZDLRA X9M?
Min of 3 storage servers to leverage full usable capacity
If adding < 3, they are added to existing disk group (+Delta)
Disk size of new servers must align with (+Delta)
All of the above (*)
Correct!
(1/1) Points
89. Which document lists the details of the supported software versions of ZDLRA?
ZDLRA Release and Patching Policy (Doc ID 2410137.1)
Release Schedule of Current Database Releases (Doc ID 742060.1)
Zero Data Loss Recovery Appliance Supported Versions (Doc ID 1927416.1) (*)
All of the above
Incorrect! Please review the course content and try again.
(0/1) Points
90. Which add-in PCIe card is newly supported on the ZDLRA X9M?
Quad-port 10 Gigabit RJ-45 Copper (Fort Pond) Network PCIe Card (*)
Qlogic 16gb Fiber Channel PCIe card
Dual 10/25 Gigabit SFP28 Ethernet
8-Port 12Gbps SAS-3 HBA (External)
Incorrect! Please review the course content and try again.
91. What size disk drive is used in the ZDLRA X9M Storage server?
14TB
18TB (*)
10TB
8TB
Correct!

You might also like