Spd-Ar-Abd-B-009-Type B-Door Schedule
Spd-Ar-Abd-B-009-Type B-Door Schedule
Spd-Ar-Abd-B-009-Type B-Door Schedule
D01 D01
SHOP DRAWINGS:
REV. DWG./DOC. NO. DESCRIPTION
DOOR TYPE - D02 (NFR) DOOR TYPE - D03 (NFR) DOOR TYPE - D04 (NFR) DOOR TYPE - D05 (NFR) DOOR TYPE - D06 (NFR)
DOOR TYPE - D01 (PANEL)
LAUNDRY, POWDER RM & BATH RM STORAGE MAIDS ROOM TEL./ELEC. BED ROOM-2, 3 & MASTER BED RM
MAIN ENTRANCE
PLAN, ELEVATION . PLAN, ELEVATION . PLAN, ELEVATION . PLAN, ELEVATION .
PLAN, ELEVATION . PLAN, ELEVATION .
RFI REFERENCES:
RFI NO.
REVISIONS:
D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13
OWNER / CLIENT
00 26/11/17
CONSULTANT
SOLID-NON-COMBUSTIBLE CONSTRUCTION
DOOR CORE
TUBULAR CHIPBOARD
PROJECT NAME AND LOCATION
SOLID CONSTRUCTION
Serena Casa Dora
70% SEMI SOLID WHITE WOOD Phase-2
PLOT NO.: 6653099
4 mm PLY WITH DARK OAK VENEERED AT WADI AL SAFA 7 - DUBAI
FACING
A SP2-AR-ABD-B-009 00