0% found this document useful (0 votes)
46 views10 pages

QSCT Tile Page

The document outlines 10 exercises related to estimating costs and specifications for construction projects. Exercise 1 involves estimating costs for a single-story load bearing structure. Exercise 2 requires working out detailed quantities and costs for a two-story reinforced concrete building. Exercise 3 is preparing a bar bending schedule for the building from Exercise 2. The remaining exercises include estimating costs for various construction types, writing detailed specifications, rate analysis, tender documents, valuation reports, using appropriate software, and a mandatory site visit and report.

Uploaded by

Atul Manchalwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views10 pages

QSCT Tile Page

The document outlines 10 exercises related to estimating costs and specifications for construction projects. Exercise 1 involves estimating costs for a single-story load bearing structure. Exercise 2 requires working out detailed quantities and costs for a two-story reinforced concrete building. Exercise 3 is preparing a bar bending schedule for the building from Exercise 2. The remaining exercises include estimating costs for various construction types, writing detailed specifications, rate analysis, tender documents, valuation reports, using appropriate software, and a mandatory site visit and report.

Uploaded by

Atul Manchalwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Exercise No.

Detailed estimate of load bearing structure (for a single


storied building)
Exercise No. 2

Working out detailed quantities for two storied (G+1) R.C.C.


framed building based on prevailing SSR.
Exercise No. 3

Preparation of bar bending schedule for the G + 1 building as


in exercise No. 2.
Exercise No. 4

Detailed estimate for any one of the following


a. Factory Shed of Steel Roof Truss
b. Elevated Water Reservoir
c. Pipe/Slab Culvert
d. Road / Railway Track/Runway
Exercise No. 5

Detailed specifications for major construction items of


building/road.
Exercise No. 6

Working out rate analysis for major construction items of


building/road.
Exercise No. 7

Preparation of tender documents for exercise No. 2


Exercise No. 8

Preparing valuation report of a Residential building and


writing report using O-1 form
Exercise No. 9

Appropriate software/excel spread sheet for exercise in serial


No 1 to 4 is recommended.
Exercise No. 10

Site visit and reports for understanding of BBS with


photographs (Mandatory).