(CHECKLIST FORMAT)
This Generic ENVIRONMENTAL PERFORMANCE REPORT AND MANAGEMENT PLAN (EPRMP) shall be used as the interim pro-
forma EIA Report requirement (IEE Checklist) for non environmentally critical projects located within Environmentally Critical Areas
(ECA) requesting expansion or modification
Read the questions carefully and write the required information on the blank spaces provided or otherwise check () the
appropriate boxes □ or parenthesis ( ). Boxes with check marks () are automatically required. Use additional sheets if necessary
and indicate this in the appropriate space.
Misleading or erroneous answers are basis for legal actions and/or denial of ECC issuance.
Others,
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
____________________________________________________________________________________________________________
______________________________________________________________________________________________________
See attached vicinity map/s and photographs of the project site and site development/layout plan (include existing project component in the layout)
Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify datum used).
Perimeter/Boundary points
(based on OCT/TCT/etc) Longitude Latitude Longitude Latitude
Existing Expansion
Drainage system
(Please list facilities by module/grouping. Use additional sheets if needed)
Existing Expansion
Power/Electricity
KWh KWh
(Total)
Power/Electricity
KWh KWh
(From Renewable Energy
Water Source
Existing Expansion
[ ] ground water [ ] well [ ] spring [ ] others: [ ] ground water [ ] well [ ] spring [ ] others:
____________________________ ____________________________
[ ] Surface water [ ] river [ ] lake [ ] others: [ ] Surface water [ ] river [ ] lake [ ] others:
____________________________ ____________________________
Water Cubic
meters/day
a. Construction Phase
b. Operation Phase
Manpower Expertise/Skills Total Expertise/Skills Total
Requirement
Existing Expansion
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures (for entire Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts project) Implementation (for entire (for entire project)
project)
LAND
Disturbance to wildlife Existing vegetation in the expansion
area:
Compliance with conditions of DENR/LGU Annual inspection of area Cost integrated in the
due to vegetation SLUP, Tree Cutting Permit, ROW, PCA replanted/ revegetated construction /operation cost
clearing during Forestland Permit
expansion Marshland Limit land clearing as much as possible
Grassland Provide temporary fencing for vegetation
Mangrove that will be retained
Wetland Promote restoration of damaged or
destroyed vegetation where possible (e.g.,
Others, specify tree planting);
____________________
Change in surface Slope in expansion area: Provide erosion control and slope Regular inspection of slope Slope/ Erosion Control
landform/ topography/ flat (0-3%) protection measures protection measures in Cost: ___________
terrain/slope (in gently sloping to rolling (3-18%) Designate a Spoils Storage Area, with erosion-prone areas Others, specify
expansion area)
steep (>18%) topsoil set aside for later use and allow Regular inspection for new ____________
maximum re-use of spoils eroded areas near the site
Soil Erosion(in Construction during dry season Others, specify
expansion area)
Stabilization of embankment with grasses ___________
or other soil cover
Others, specify
____________
Is the project site’s expansion area Compliance with the DENR Administrative
located in an area identified by Order No. 2003-30 and DENR
MGB/PAG-ASA/ PHIVOLCS as Administrative Order No. 2000-28,
hazard prone? Implementing Guidelines on Engineering
Yes Geological and Geo-hazard Assessment
(EGGA).
No
Increased siltation due Specify nearest/receiving water Set-up proper and adequate sanitary Regular (ocular) inspection of: Cost integrated in the
to project activities body:
____________________________
facilities Drainage / canal systems construction/ operation cost
Water quality Strictly require the contractor and its Water treatment facility (i.e.,
degradation Distance to nearest/receiving water workers to observe proper waste disposal grease trap, septic tank, etc.)
Others, specify body: and proper sanitation
___________________ 0 to less than 0.5 km Strictly observe proper waste handling and Quarterly monitoring of the
B
for domestic sewage Oil and Grease
Provide ring canals around fuelling tanks/
C motorpool/ maintenance areas
D Others, specify
___________
If nearest/receiving water body is
coastal or marine water, specify
classification:
SA
SB
SC
SD
AIR / NOISE
Air quality degradation Distance to nearest community: Properly operate and maintain all emission Regularly monitor Cost integrated in the
0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of construction/ operation cost
0.5 to 1 km etc) complaints
More than 1 km Install when applicable, the appropriate air
Regular (ocular) inspection of:
pollution control device/s
Strictly enforce good housekeeping Absence of white or black
practices smoke from vehicles,
heavy equipment and
Control vehicle speed to lessen generator
suspension of road dust
Presence of truck cover
Conduct water spraying to suppress dust during deliveries
sources and minimize discomfort to nearby
residents
Use covered vehicles to deliver materials
that may generate dust
Other, specify
___________________
Nuisance due to noise Distance to nearest community: Properly operate and maintain all noise Regularly monitor Cost integrated in the
generation 0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of construction/ operation cost
0.5 to 1 km etc) complaints
More than 1 km Install when applicable, the appropriate Regular monitoring of buffer
noise control device/s (e.g., mufflers, zones
PEOPLE
Displacement of Size of population of host barangay: Provide relocation/disturbance Regularly monitor Cost integrated in the
residents in the project
≤ 1,000 persons
compensation packages presence/absence of construction/ operation cost
site and within its
>1,000 and ≤ 5,000persons
Prioritize local residents for employment complaints
vicinity
Regular coordination with
Displacement of >5,000person
Promptly pay local taxes and other
financial obligations LGU
Indigenous People
Regular coordination with LGU Others, specify
Enhanced employment
Classification of host barangay:
_________________
and/or livelihood Urban Prior consultation & coordination to
opportunities Rural
minimize disruption on daily domestic
activities & respect for IP rights and
Reduced employment cultural practices
and/or livelihood Available services within/near the
opportunities host barangay: Ensure participation of IPs in consultations
Increased revenues for Schools (e.g. elementary, high
and dialogues
LGU school, college) Provide appropriate traffic/warning signs,
Disruption/Competition Health facilities (e.g., clinics,
lighting, etc
in delivery of public hospitals, etc.) Others, specify
services (e.g., Peace and order (e.g., police
________________
education, peace and outpost, brgy. Tanod, etc.)
order, etc.)
Recreation and sports facilities
Enhanced delivery of
Others, specify
public services (e.g.,
_____________________
education, peace and
order, etc.)
Impacts on community Regular coordination with LGU Presence/Absence of Cost integrated in the
health and safety Provide appropriate warning signs, lighting complaints construction/ operation cost
Others, specify and barricades, whenever practicable Regular coordination with
_______________ Observe proper housekeeping LGU
Provide on-site medical services for any Regular submission of reports
emergency. to concerned agency
Participate in public awareness programs Others, specify
on health and safety _________________
Provide description of the Abandonment activities for existing and proposed expansion, such as, dismantling and waste disposal.
______________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________
This is to certify that all the information and commitments in this Environmental Performance Report and Management Plan (EPRMP) are
accurate and complete to the best of my knowledge.
By the authority vested in me by the ____(Company Name) as ___(Position/Designation), I hereby commit to ensure implementation of all
commitments, mitigating measures and monitoring requirements indicated in this EPRMP as well as the following:
Conform to pertinent provisions of applicable environmental laws e.g., R.A. No. 6969 (Toxic Substances and Hazardous and Nuclear
Wastes Control Act of 1990), R.A. No. 9003 (Ecological Solid Waste Management Act of 2000), R.A. No. 9275 (Philippine Clean Water
Act of 2004), and R.A. No. 8749 (Philippine Clean Air Act of 1999).
Abide and conform to LGU development plans and guidelines.
Promptly pay local taxes and other financial obligations.
Regularly submit reports to concerned agencies.
I hereby bind myself to answer any penalty that may be imposed arising from any misrepresentation or failure to state material information in
this EPRMP.
In witness whereof, I hereby set my hand this ____ day of __________ at ______________________.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant exhibiting his/her Community Tax Certificate No. ___________________ issued at
______________________ on __________________________.