Calculation, 27.12.22-Al-8

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A2 7' 7

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 18' 19 20 21 22 23 24 A3

A1 A4
A A

B B

C C

D D

E E

F F

G G

H' H'
H
H

J J

K K

L
L
L'

VIP PRIVATE CABENS LEVEL L'

M M

F.F.L.+13.20
N N

O O

P P

Q Q

R R

S S

S1 S4

S2 S3

a
1 2 3 4 5 6 7' 7 8' 8 8" 9 10 11 12 13 14 15 16 17' 17 17" 18 18' 19 20 21 22 23 24

KE PLAN
NOTES:

REVISIONS
REV. DATE DESCRIPTION ACTION CKD

APPROVALS
REV. ACTION SIGN CKD

CERTIFIED FOR CO-ORDINATION AND COMPLIANCE WITH


CONTRACT DOCUMENTS EXCEPT AS NOTED

TRADES CONT. /SUBCONT. SIGNATURE DATE

ISSUES REVISIONS

CONT. REF. DRG. No.

OWNER:

Pu li Aut o it fo S o t

OWNER:

Sulai i at S o t Clu
CONSULTANT:

MAIN CONTRACTOR:

‫تال ركلركل ككنهلل ةركلارةكرش‬


AL KHALID ENGINEERING CONT. CO.

P.O. Box : 3777, 13038 Safat, Kuwait


Tel : 24812177,1888111 Fax :24845726

PROJECT:
STUD , DESIGN
CONSTRUCTION SUPERVISION OF
FOOTBALL STADIUM
FOR SUL BIKHAT SPORTING CLUB

DRAWING TITLE :

PROJ. No. DRAWING NUMBER


DRAWING NO. SCALE

6 – 2020 / 2021

REV.

You might also like