0% found this document useful (0 votes)
66 views52 pages

Geology Database

The document provides instructions for setting up a geology database in Minex software. It describes how to create projects, import data, set up borehole and lithology databases, load collar, litho, seam and quality data from files, create geology grids and sections, and validate the data. The steps include copying raw data, setting project directories, importing DXF/DWG topo files, creating borehole and seam databases, adding variables, loading collar and sample data from files, creating rock types and intervals, and plotting boreholes, profiles and sections.

Uploaded by

Alwi Wilogo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views52 pages

Geology Database

The document provides instructions for setting up a geology database in Minex software. It describes how to create projects, import data, set up borehole and lithology databases, load collar, litho, seam and quality data from files, create geology grids and sections, and validate the data. The steps include copying raw data, setting project directories, importing DXF/DWG topo files, creating borehole and seam databases, adding variables, loading collar and sample data from files, creating rock types and intervals, and plotting boreholes, profiles and sections.

Uploaded by

Alwi Wilogo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 52

GEOLOGY DATABASE

1. Copy all your raw data under project name.


 Collar Data

 Litho Data
 Seam Data

 Quality Data
2. File>Project Manager>Set Project Directory

SETTING LOCAL ORIGIN


Tools>Option>Local Origin
CREATING GEOMETRY FILE
File>New>Geometry.GM3

Next
Beri Nama Ex : SINCLINE1

Finish
TOPOGRAFI

CREATING GRID FOLDER


File>New>Folder

Next
Beri Nama Ex : TOPO.GRD

Finish
IMPORT DATA TOPOGRAFI DARI DXF/DWG (FILE – IMPORT – IMPORT DXF/DWG)

MENAMPILKAN TOPOGRAFI (GEOLOGYRAWDATA.GM3 – TOPO – DISPLAY)


MEMBUAT GRID TOPO, CARANYA MEMBUAT FOLDER :
MENAMPILKAN HASIL GRID TOPO
GRID BOW-5
CREATING BOREHOLEDB
File>New>BoreholeDB.B31

Next
Beri Nama Ex : GEOBOREHOLES

Finish
PILIH GEOBOREHOLES-OPEN
GEO-LOAD-LOAD COLLAR DATA

MASUKKAN FILE DATA COLLAR BOREHOLES Ex: COLLAR_2012 (CSV/PRN)


FORMAT FILE – CREATE/EDIT
PRIVEW MINEX VARIABLE
Save-Ok

OK
Geoboreholes.B31-Save

BoreholeDB-Reporting-Report Borehole

BoreholeDB-Plot-Borehole Display
Copy Lithology.DIC, Lithology.SYM dan Symbol.PAR (LOCAL DISK or C – User – Public –
GEMCOM – MINEX – 613 – shared - etc) Pada Boreholes Database File – SETUP atau Di
project Directory untuk minex 602/3
Jika tidak ditemukan buka organize-folder and search option
SETUP DATA TYPE & VARIABLE
GEOBOREHOLES.B31> In the Properties window change the Read Only field from True becomes False

MEMBUAT ROCKTYPE PADA COLUMN LITHO


GEO>LITHO>NEW BOREHOLE VARIABLE atau BoreholeDB>Edit>New Borehole Variable
GEO>LITHO>LOAD SAMPLE DATA atau BoreholeDB>Load>Sample Data

MASUKKAN FILE DATA LITHOLOGY BOREHOLES Ex: LITHO_2012 (CSV/PRN)


FORMAT FILE – CREATE/EDIT
PRIVEW MINEX VARIABLE

OK
GEO - SAVE
GEO>LITHO>LOAD SAMPLE DATA atau BoreholeDB>Load>Sample Data

MASUKKAN FILE DATA LITHOLOGY BOREHOLES Ex: WEAT_2012 (CSV/PRN)


FORMAT FILE – CREATE/EDIT
PRIVEW MINEX VARIABLE
OK

GEO – SAVE

BoreholeDB-Reporting-Report Sample Data


MEMBUAT INTERVAL SEAM
BOREHOLEDB>EDIT>CREATE/EDIT SEAM SEQUENCE

Ganti
MODW
SAVE and OPEN
VALIDATING COAL QUALITY DATA
BoreholeDB>Edit>New Borehole Variable
borehole variable ADL, RM, TM, IM, AC, VM, FC, TS, CV (Adb), CV (Ar), CV (Daf), RD and HGI
BOREHOLEDB>LOAD>LOAD SAMPLE DATA
MASUKKAN FILE DATA QUALITY Ex: Quality (CSV/PRN)
FORMAT FILE – CREATE/EDIT
PRIVEW MINEX VARIABLE

BOREHOLEDB>REPORTING>REPORT SAMPLE DATA


INTERVAL – LOAD SEAM/LAYER INTERVALS
MASUKKAN FILE DATA SEAM BOREHOLES Ex: SEAM_2012 (CSV/PRN)
FORMAT FILE – CREATE/EDIT
PRIVEW MINEX VARIABLE

VALIDATING SEAM DATA


BoreholesDB>Reporting>Report Seam Validation

BoreholesDB>Reporting>Report Seam Data


BoreholesDB>Plot>Borehole Display
MEMASUKKAN DATA GEOPHYSICAL LOGGING
GEO>DATA TYPE>ADD DATA TYPE Atau BoreholeDB>Edit>New Data Type

GEO>GEOPHY>NEW BOREHOLE VARIABLE Atau BoreholeDB>Edit>New Data Type


(GAMMA, CALIPER, LONG, SHORT)
BOREHOLEDB>LOAD>LOAD LAS

CREATING BOREHOLE PROFILE PLOT


BOREHOLEDB>PLOT>PROFILE/SINGLE HOLE PROFILE

SELECT BOREHOLES DATA


CLIK
VALIDATION DATA

 Cek Data dari Statistik

 Statistik Analisis

 Cross Correlation
 Cek Rocktype vs Dictionary Litho

Cek Data di Litho Data Base maupun Dictionary Litho

 Cek Litho Coal yang Belum ada Nama Seam


 Cek Data Interval Seam Vs Data Interval Quality

BOREHOLEDB-PLOT-PROFIL
BOREHOLEDB-EDIT-ADD/EDIT SEAM INTERVAL
PLOTTING SECTION

MOUNTS-SECTION-CREATE
Runtime-Section-Section001-Draft on Mounts

Mounts-Section-Borehole Section
Mounts-Section- Grid Cross-Section

You might also like