When chamber size increases to 1500mm 600 x 600 Clear opening ductile iron NOTE:- General Backfill In line with the above regulations we are obliged to inform the Contractor of the abnormal risks that may be
Road construction
150
150mm reinforced concrete slab. 1. This drawing is to be read in conjunction with all relevant KHY,
600
Cover and frame to be sat on on Class B engineering Selected fill material
Reinforced cover slab with 600 x 600 C20-DC2 with A393 mesh reinforcement
bricks minimum 2 courses / maximum 4 courses or Architects and M&E Consultants drawings and project specifications.
300
access (BS EN1917-2002 Kitemarked) NOTE: Selected Backfill (see notes)
PCC cover and frame seating rings, if required Selected fill material 2. All drainage works shall be carried out in accordance with the relevant
Selected fill material shall consist of uniform soil, free from stones
100
100
600
bedded on mortar, proprietary bitumen parts of BSEN 752 'Drains and Sewer Systems Outside Buildings', the
larger than 40mm, clay lumps larger than 75mm, tree roots, (see notes)
or resin mastic sealant
100min
600 x 600 access hole Plastic pipe shall comply current Building Regulations and the Local Authority Building Control
contaminated material. Selected backfill material is to be placed in with WIS 4-35-01 specifications and requirements.
positioned to align over channel Granular bedding
layers not exceeding 150mm thickness. Should the excavated 3. The location, size and depth of all existing drains/sewers and services
(see table) Granular bedding
material be unsuitable or weather conditions affect the materials shall be established by the contractor prior to commencement of works
(see table)
100
100
stability, then a suitable hard granular material shall be used. on site. Any discrepancies from the information indicated on these
Precast concrete manhole sections and
drawings shall immediately be brought to the attention of the
Bc Bc
cover slab to be bedded on mortar, engineers.
proprietary bitumen or resin mastic Mechanical compaction of fill material shall not be
Bc + 300 min Bc + 300 min
permitted until there is a total depth of cover of 4. All levels and dimensions shall be verified on site prior to
sealant commencement of any works. Any discrepancies shall immediately be
300mm above barrel/crown of the pipe
brought to the attention of the engineers.
Precast concrete manhole sections 5. Position, size, depth, capacity, condition & status of existing drainage
All in situ concrete to be C20-DC2 Sidefill material to be placed evenly on both sides of systems are not known. The design of the foul and surface water
with sulphate resisting cement to BS EN 1917-2002
pipes taking care to work the material under the lower
CONCRETE PROTECTION FOR PIPES CLASS S BEDDING drainage assumed that no pumping, storage, modification, diversion,
unless agreed otherwise 1:20 1:20 abandoning or improvement works are required on the existing
quadrant of the pipe ensuring the pipe is not lifted.
Both sides of the trench should be filled simultaneously systems.
Benching slope to be 1:10 to 1:30 6. The design assumes a gravity connection for the foul system is possible.
to avoid horizontal movement of the pipe
500mm min. 225mm min. The bottom precast manhole ring to If the existing sewers are not deep enough then pump stations will be
be built into concrete min 75mm PIPE NOMINAL SIZE NOMINAL MAXIMUM MINIMUM RECOMMENDED TRENCH WIDTHS required.
High strength concrete topping to Any trench box/sheeting to terminate 150mm (mm) MATERIALS SPECIFIED IN BRITISH STANDARDS FOR PIPES IN POOR GROUND CONDITIONS
PARTICLE SIZE (mm) 7. Design assumes that all works are not to be adopted.
be brought up to a dense smooth above crown of pipe to prevent displacement of 8. All works are assumed to be within public highway or within the land
Distance between top of NOM PIPE DIA MIN TRENCH WIDTH
face neatly shaped and finished to granular material. Boxing/sheeting to be 100 10 10mm nominal single size owners lands & no works are required on third party land owners
pipe and underside of (mm) (mm)
all branch connections removed progressively during placement of main property.
precast section to be 50mm 110 to 150 16 10-14mm nominal single size or 14mm to 5mm graded
(min thickness 20mm) backfill 9. All works within the public highway to be reinstated to the highway
150 450 authority requirements. All drainage connections onto adoptable
160 to 300 20 10-14mm or 20mm nominal single size or 14mm to 5mm
drainage systems shall be carried out to to the water authority's
Inverts to be formed graded or 20mm to 5mm graded
225mm to barrel of pipe 225 525 approval.
using channel pieces 10. The contractor must allow for any fee's required for road and sewer
310 to 500 20 14 or 20mm nominal single size or 14mm to 5mm graded
opening permits, sewer connections and make the appropriate
C20-DC2 concrete surround 150mm or 20mm to 5mm graded 300 Two times applications.
thick with sulphate resisting cement And above nom. diameter 11. All insitu and precast concrete products shall comply with class DS1
unless agreed otherwise 14 - 20mm or 40mm nominal single size or 14mm to
Ø Of largest pipe Minimum internal Ø of requirements for sulphate exposure in accordance with the BRE Special
Over 550 40 5mm graded or 20mm to 5mm graded or 40mm to 5mm Digest 1, Concrete in Aggressive Ground (2001) Part 1: Table 2.
in manhole (mm) manhole (mm)
graded 12. Manhole covers and frames shall comply with the relevant provisions of
Less than 375 1200 BSEN 124, have 600x600mm clear openings and be of a non-rocking
Notes: Notes:
375-700 1500 design without cushion inserts and be kitemarked. Load class D400 in
trafficked areas and load class B125 in footways, landscaped and
750-900 1800 a) Processed granular materials to include aggregates to BS 882, air-cooled Native Soil Modulus between 3 and 4 Mpa pedestrian areas. Where required, covers shall be recessed to receive
blast furnace slag to BS1047 and lightweight aggregates to BS 3797 Typical Soil Classifications : Very loose gravel, loose sand, medium dense clayey silty sand, firm clay the Architects specified finish.
13. All u-PVC pipes and fittings shall comply with WIS 4-35-01 and shall be
b) For the purpose of this table, PE pipe of 630mm O.D. can be regarded * A vertical trench face has been assumed to allow a modulus of 7 Mpa to be achieved for the pipe bedding and sidefill kitemarked.
Joint to be as close as See table for rocker pipe details as having nominal bores of over 550mm, irrespective of wall thickness. material. 14. Pipes to be laid in Class "S" bedding (150mm granular bed and
possible to face of manhole surround). Where depth of cover to the pipe barrel is less than 1.2m
to permit satisfactory joint c) Nominal bore is used in preference to DN because of the different Other assumed values: Depth of cover = 6.0 metres (max) under vehicular trafficked areas and 0.9m under footways/gardens then
Nominal Effective a concrete slab protection should be provided above the granular bed
and subsequent movement nominal size classifications for flexible pipes Traffic Loading = Main Road
Diameter Length (m) and surround.
Pipe stiffness = SNB
(mm) 15. All pipes shall be laid with soffits level. All manhole/inspection chamber
150-600 0.6
GRANULAR BEDDING MATERIAL invert levels shown are for the outlet pipe (unless specified otherwise).
Note. Where the native soil modulus is below 3Mpa or the depth of cover exceeds 6 metres guidance should be sought All pipe runs shall be laid to the levels indicated. All pipe gradients are
Pipe joint to be located min EXTRACT FROM TABLE A2 WIS-4-08-02 from the pipe manufacturer regarding structural design and installation details. approximate.
100mm inside face of manhole 675-750 1.0 CONSTRUCTION RISKS 16. 450mmØ chambers for depths greater than 1.2m, restricted access
Over 750 1.25 opening to 350mm is required for safety reasons.
Collapse of excavations. MAINTENANCE RISKS DEMOLITION RISKS PLASTIC PIPE (UPVC) TRENCH BEDDING DETAILS 17. All RWP's & SVP's connections to be 100mm dia (unless specified
otherwise by the Architect). Gully connections to be 100mm dia.
Minimum width of 1:20 18. All RWP's, SVP's and connections are shown indicatively or to the latest
Un-charted buried existing services. No future abnormal demolition risks
benching to be 500mm Minimum width of associated with Roads and Sewers. Architects drawings. Position of down pipes must be confirmed from
(plastic pipes shall comply with WIS 4-35-01)
benching to be 225mm Architects drawing before laying underground pipework. All down pipes
should be provided with a roddable access point above the FFL.
All channels in manholes Working on live sewers. 19. Drains laid within 5 metres from deep rooting trees and hedges to have
to be clayware concrete bed and surround.
20. Plastic channel sections in manholes are not acceptable and clayware is
to be used. Plastic channels are difficult to set in concrete and a
Working adjacent to the public highway. satisfactory finish cannot be obtained on the benching.
All pipes entering or leaving 21. Filled ground must be filled and consolidated before any drainage works
manholes shall have a flexible are carried out.
Formation level Formation level Formation level
Manholes with outgoing pipes joint 600mm of the inside face 22. The strength of vitrified clay pipes (if used) to be 40kN/m for 100Ø,
greater than 600mmØ shall be of the manhole. The next pipe 40kN/m for 150Ø, 45kN/m for 225Ø and 72kN/m for 300Ø. All concrete
shall be a short "Rocker Pipe" products to be Class 120.
fitted with guard bars, safety 23. All excavations in areas of high water tables and granular materials
with length as table above General backfill material General backfill material
chains or other safety devices with high sand/silt contents shall be wrapped with a suitable geotextile
(see notes) (see notes)
filter membrane to prevent migration of sands/silts. Full height clay
stanks across trenches and/or at manhole locations at 25m intervals to
Plastic pipe shall comply Selected fill material restrict water movement along the excavation shall be provided.
24. Yorkshire Water is not obliged to accept filter drain/land drainage runoff
300
300
300
with WIS 4-35-01 (see notes)
In addition to the hazards/risks normally associated with this type of work detailed on this drawing take note of into the public sewer network or adoptable drainage system (directly or
the above. iD Civils Design are only required to provide information about any significant risks associated with in-directly). An alternative method of disposal of the land drainage
runoff will therefore be required and liason with the Land Drainage
the design.
TYPICAL MANHOLE DETAIL Authority with regard to the disposal of the filter drain/land drainage
Granular bedding
Granular bedding runoff is required.
1:20 (see table) 25. Do not scale from this drawing.
(see table)
Y
A15 covers in non trafficked areas.
Bc Bc Bc
A15 covers in non trafficked areas. B125 in trafficked areas. Rev Description By Date
B125 in trafficked areas.
Bc + 300 min Bc + 300 min Bc + 300 min
450 x 450mm max cover size (depth to invert less than 1.2m) Client:
450 x 450mm max cover size (depth to invert less than 1.2m)
350 x 350 mm max cover size (depth to invert greater than 1.2m)
350 x 350 mm max cover size (depth to invert greater than 1.2m)
Strength to conform with Clause 5.7.11 Keepmoat Homes
CLASS S BEDDING CLASS B BEDDING CLASS F BEDDING
1:20 1:20 1:20 Project Title: