0% found this document useful (0 votes)
578 views3 pages

Create Measurement Document in Sap

The document explains how to create a measurement document in SAP PM. It outlines the steps to navigate to transaction code IK11, select a measuring point for equipment, and enter a measurement reading. The measurement document is then saved, completing the process of creating a measurement document for a measuring point in SAP.

Uploaded by

Sanjeev
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
578 views3 pages

Create Measurement Document in Sap

The document explains how to create a measurement document in SAP PM. It outlines the steps to navigate to transaction code IK11, select a measuring point for equipment, and enter a measurement reading. The measurement document is then saved, completing the process of creating a measurement document for a measuring point in SAP.

Uploaded by

Sanjeev
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

SAP PM – Create Measurement Document in SAP

In this SAP PM tutorial, you will learn how to create measurement document in SAP by using transaction code
IK11.

How to create measuring document in SAP

In this activity you create measurement document for measuring point and Counter.

Navigation

You can create measuring document by using the following navigation method.

Transaction IK11
Code

SAP Menu Logistics >Plant Maintenance > Management of technical objects > Equipment >
Path Measurement documents > Create.

Configuration steps

Perform the following configuration steps for creating the measuring documents for counter and measurement
point in SAP.

Step 1: Execute t-code “IK11” in command field from SAP easy access screen.

Step 2 : On create measurement document initial screen, update the following details.

Measuring Point : Update the corresponding measuring point for the equipment.
Default values : The SAP system automatically update the values of measurement time and read by.
Step 3 : On create measurement document general data screen, update the following details.

MeasRdg : Update the measurement reading for the measuring position.

Choose save icon and save the configured details.

Successfully we have created measurement document for measurement point in SAP.

SAP PM

⊩ SAP PM Tutorial

SAP PM - Enterprise Structure

⊩ SAP PM - Define Company

⊩ SAP PM - Define Company Code

⊩ SAP PM - Assign company to company code

⊩ SAP PM - Define Plant

⊩ SAP PM - Assign Plant to Company code


⊩ SAP PM - Maintain Maintenance Planning Plant

⊩ SAP PM - Maintenance Planner group

⊩ SAP PM - Define Purchase Organization

⊩ SAP PM - Assign Purchase organization to Plant

⊩ SAP PM - Define Purchase group

⊩ SAP PM - Storage Location

SAP PM - Master Data

⊩ SAP PM - Create Factory Calendar

⊩ SAP PM - Create Work Centers

⊩ SAP PM - Types of Technical Objects

⊩ SAP PM - Attributes for material type

⊩ SAP PM - Define Material Groups

⊩ SAP PM - Maintain company code for MM

⊩ SAP PM - Material Master Record

SAP PM - Functional Locations

⊩ SAP PM - Define Structure Indicator

⊩ SAP PM - Create Functional location

SAP PM - Equipment

⊩ SAP PM - Create Equipment

⊩ SAP PM - Create Equipment Task List

⊩ SAP PM - Measurement Documents

SAP PM - Measuring Points

⊩ SAP PM - Create Measuring Point

SAP PM - Maintenance Planning

⊩ SAP PM - Maintenance Strategy

⊩ SAP PM - Create cycle sets

⊩ SAP PM - Configure Order Types

⊩ SAP PM - Assign Order Types to Planning Plant

⊩ SAP PM - Single cycle maintenance plan

SAP TCodes

⊩ SAP TCodes

⊩ SAP PM TCodes

You might also like