TU 380 Eng
TU 380 Eng
TU 380 Eng
OPERATION MANUAL
Operation Procedure
1. Press POWER -> On Machine
2. Press AUTO->Complete Run
3. Press Red Button -> Will Stop at any step until dissolve defect
issue, Press Stop and return to Origin, If you need to
continue Please press AUTO.
4. Press STOP-> Will immediately stop operation until defect
issue dissolve And will continue to run.
5. Press HEATER-> ON Start Heating TOP & Bottom Heater, Press
OFF Will cut off Both Heaters.
6. Flow Meter ->Flow Meter Knob. Adjust N2 flow rate (I LPM=28
Lit/Min.)
7. N2 Knob ->Adjust N2 intake pressure.
8. N2 Meter -> N2 Meter set at 1.5Kg.
9. Ampere Meter-> Show Existing ampere consumption.
Reset Setting 1stValue Adjust 2nd Value adjust 3rdvalue adjust decimal value adjust
0~ 9 9 9. 9 sec
****** WEIDACHENG ****** (6)
4.Max. Reflow Area.155mmX155mm
5.Using Computer to Plot out the Temp. Profile for the Communication
connection between Thermo Couple & USB
6.Saving for the Tempreture Profile and print out in the Graph Format.
(8) TU-380 is more suitable to use to reflow and rework for BGA
cause the heat transfer Is transfer using not contact and also the
heat transfer is more even. Compare to the Hot plate which are
using direct heat transfer will cause die damages due to delta T is
More than 5 Deg C. The delta T for the hot air is only 1 Deg /sec.
Therefore by using Hot Air method will not cause damage to the
components and more suitable for Rework.
250
Reflow
Temp (deg C)
217
45 - 90 seconds
200 Soak or Dryout
above liquidus
30 - 60 seconds
0
0 1 2 3 4 5 6 7
Time (min)
This profile serve as a guide in establishing a reflow profile for your process.
Different reflow methods, board geometries and densities may require further adjustments.
DRAM-PCB Reflow
Reballed Reflow