SIGNATURE:
RISK
WORK ACTIVITY HAZARD(S) RATING CONTROL MEASURE(S) RESIDUAL RISK
1-25
Break the activity down into steps. Each step should Identify the hazards in each step Identify what control measures will be
accomplish some major task and be in a logical and give them a risk rating using implemented to eliminate the hazard or
sequence. the Hazard ID and Risk minimise the risk.
Assessment Summary.
Measurements for the new counter are to be • No risks involved 1 • Safety barricading of the area during -
taken from the site. getting measurements.
Step 1
Fabrication of the new Corian Counter in the
factory.
Covering the floor with Nylon to avoid any • Negligence - • Safety barricading and PPE to be -
Step 2
damage to the floor provided.
Classification: Internal
Installation of the new Counter involves the • Dust Inhalation 10 • Proper trolleys and vacuum 2
following steps. Eye Irritation cleaners to suck the specks of dust
• Check the counter where the solid surface Noise and sealing and protection of the
material top is to be fixed and properly place.
leveled. • Use appropriate PPE (dust mask,
• Place the solid surface material tops on the goggles). Use extraction if
carcass and prepare a temporary joint. necessary.
• Remove the tops and supply the silicone.
Step 3
• Place the tops again and prepare the joint
permanently.
• After cleaning the seam, apply the joint to
the adhesive reinforcement strip.
• Make the joint an even surface by using a
belt sander.
• Finally finishing is done by sanding and
buffing
What Plant and Equipment will be used to carry out this Activity?
Battery Drill machine, Tools Box, Router Machine, Sanding Machine
Qualifications / Competencies required of Persons carrying out this Activity (Licenses, Qualifications, Permits):
Ranking Method
Probability
1 2 3 4 5