Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from Km. 3.400 (under tunnel). in all respects including roads, plantation &
Maintenance HPs & Drawings – As approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide SE’s Proced.No. SE/CC(P)/OGL/194 M, Dt.14.03.2017
from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt., No.03VGP/2004, Dt.09.11.2004.
Agreement No:- 30/2017-18, Dt: 13-11-2017, Value:- Rs. 51,35,919/-
Supl.Agreement No : 24/2018-19, Dt: 20-07-2018, Value:- Rs. 7,84,22,589/-
Name of the contractor:- M/s RR Edifice
Seignorage to be recovered as
RA Bill Details Seignorage as recovered per Agreement
Difference to be
Description of Quantity
Sl.No. Material Cum reimbursed as per Remarks
Month & clause 104 of GCC
Bill No Year Rate Amount (RS.) MB Reference Rate Amount (RS.)
1 2 3 4 5 6 7 8 9 10 11 12
1 Metal 165.477 75.00 12,411 P-90 of MB 7 33.00 5461 6,950
11 Dec-18 MRK(P-IID)
2 Sand 80.94 50.00 4,047 30.00 2428 1,619
3 Metal 2270.005 75.00 170,250 33.00 74910 95,340
P- of MB 2 MRK(P-
4 14 Aug-20 Sand 1110.29 50.00 55,515 30.00 33309 22,206
IID)
5 Gravel 4994.98 30.00 149,849 13.00 64935 84,914
Total difference amount in Seignorage charges to be Reimbursed as per Agreement clause 104 of GCC (Rs.) 211,029
For RR Edifice
Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel
of Feeder Canal from Km. 3.400 (under tunnel). in all respects including
roads, plantation & Maintenance HPs & Drawings – As approved in
Package No.II (Part of Balance work deleted) under 60(C) of P.S. to
APDSS vide SE’s Proced.No. SE/CC(P)/OGL/194 M, Dt.14.03.2017
from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt.,
No.03VGP/2004, Dt.09.11.2004.
1 Cement 706,134
2 Steel 339,168
3 Fuel 5,321,059
4 Labour 7,214,086
5 Machinery 2,253,501
Total 20,182,564
For RR Edifice
Authorised Signatory
Superintending Engineer
Construction Circle
Ongole
Price Adjustment towards Cement
For bill No. LS 11,14 & Part
Name of The Agency : M/s RR Edifice
Name of work : Pula Subbaiah Veligonda Project – “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal
including Construction of CM & CD works and distributory system for 62000 Acres on EPC Turnkey System
Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from Km. 3.400 (under
tunnel). in all respects including roads, plantation & Maintenance HPs & Drawings – As approved in Package No.II
Sub-Work:- (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide SE’s Proced.No. SE/CC(P)/OGL/194 M,
Dt.14.03.2017 from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt., No.03VGP/2004,
Dt.09.11.2004.
Agreement No : 30/2017-18, Dt: 13-11-2017, Value:- Rs. 51,35,919/-
Supl.Agreement No : 24/2018-19, Dt: 20-07-2018, Value:- Rs. 7,84,22,589/-
Supl.Agreement No : 15/2020-21, Dt: 23-09-2020, Value:- Rs. 3,38,28,633/-
Cement Qty Cement
Base
Sl. Bill Month of Qty of Qty during Base Prevailing Rate Difference Variation
Recording
Discription of Item M.B Reference Rate (+5%)
No No Concrete Per Cum Total Qty month Rate(Rs) (Rs) (Rs) Amount (Rs)
(Rs)
in kg in kg in (MT)
1 11 Dec-18 RCC M30 195.32 6 MRK(P-IID) P-48 391 76368.556 76.369 2700 2835 3900 1065 81333
For RR Edifice
Asst. Executive Engineer Dy. Executive Engineer EXECUTIVE ENGINEER Superintending Engineer
Authorised Signatory VGP Sub-Divison VGP Sub-Divison VGP DIVISION Construction Circle
Markapur. Markapur. MARKAPUR Ongole
Price Adjustment towards Steel
For bill No.LS 11 & Part
Name of The Agency : M/s RR Edifice
Name of work : Pula Subbaiah Veligonda Project – “Closing of Sunkesula Gap – Excavation of Feeder and
Teegaleru Canal including Construction of CM & CD works and distributory system for 62000
Acres on EPC Turnkey System
Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from
Km. 3.400 (under tunnel). in all respects including roads, plantation & Maintenance HPs &
Drawings – As approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S.
to APDSS vide SE’s Proced.No. SE/CC(P)/OGL/194 M, Dt.14.03.2017 from the scope of the M/s
Jai-Prakash Gayatri(JV), Hyderabad vide Agt., No.03VGP/2004, Dt.09.11.2004.
1 11 Dec-18 Placement of Steel 4 MRK(P-IID) P-43 23190.715 23.191 23.191 27500 28875 43500 14625 339168
For RR Edifice
Asst. Executive Engineer Dy. Executive Engineer EXECUTIVE ENGINEER Superintending Engineer
Authorised Signatory VGP Sub-Division VGP Sub-Division VGP DIVISION Construction Circle
Markapur. Markapur. MARKAPUR Ongole
CALCULATION OF PRICE VARIATION AMOUNT TOWARDS FUEL
For RA Bill No 11,14 & Part
Name of work:- Pulasubbaiah Veligonda Project-Package -II-Closing Sunkesula Gap, Excavation of Feeder Canal and Teegaleru Canal including
Construction of CM & CD works, Distributory System for 62,000 Acres on EPC System.
Sub-Work:- Earth work Excavation and construction of under tunnel of Feeder Canal from Km. 3.400 (under tunnel). in all respects including roads,
plantation & Maintenance HPs & Drawings – As approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide SE’s
Proced.No. SE/CC(P)/OGL/194 M, Dt.14.03.2017 from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt., No.03VGP/2004,
Dt.09.11.2004.
Agreement No:- 30/2017-18, Dt: 13-11-2017, Value:- Rs. 51,35,919/-
Supl.Agreement No :-24/2018-19, Dt: 20-07-2018, Value Rs. 7,84,22,589/-
Name of the contractor:- M/s RR Edifice
=0.85X4.23/100 X 2525753 X
2 Aug-20 14 2,525,753 2,525,753 26.13 27.44 24.82 81.45 54.01 4.23% (81.45 -27.44)/27.44
= 178748
Total Fuel Escalation 5,321,059
Certified that the amounts furnished in the proposals are verified with original records and found to be correct
Labour Component
Name of The Agency : M/s RR Edifice
Name of work : Pula Subbaiah Veligonda Project–Package II-Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal including Construction of CM & CD
works and distributory system for 62,000 Acres on EPC Turnkey System
Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from Km. 3.400 (under tunnel). in all respects including
roads, plantation & Maintenance HPs & Drawings – As approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide
SE’s Proced.No. SE/CC(P)/OGL/194 M, Dt.14.03.2017 from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt., No.03VGP/2004,
Dt.09.11.2004.
Agreement No : 30/2017-18, Dt: 13-11-2017, Value:- Rs. 51,35,919/-
Percentage of Factors approval : CE & DWRO/Pkm DIST / OGL / DEE2/ AEE1 / 36 /2005 / VGP/ P-II / Vol.14, Dt: 10.08.2016.
1 2 3 4 5 6 7 8 9 10
TOTAL: 7,214,086
For RR Edifice
Asst. Executive Engineer Dy. Executive Engineer EXECUTIVE ENGINEER Superintending Engineer
Authorised Signatory VGP Sub-Divison VGP Sub-Divison VGP DIVISION Construction Circle
Markapur. Markapur. MARKAPUR Ongole
Page 8 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Machinery Component
Name of The Agency : M/s RR Edifice
Pula Subbaiah Veligonda Project–Package II-Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal including Construction of CM & CD
Name of work :
works and distributory system for 62,000 Acres on EPC Turnkey System
Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from Km. 3.400 (under tunnel). in all respects including
roads, plantation & Maintenance HPs & Drawings – As approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide
Sub-Work:-
SE’s Proced.No. SE/CC(P)/OGL/194 M, Dt.14.03.2017 from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt., No.03VGP/2004,
Dt.09.11.2004.
Percentage of Factors approval : CE & DWRO/Pkm DIST / OGL / DEE2/ AEE1 / 36 /2005 / VGP/ P-II / Vol.14, Dt: 10.08.2016.
1 2 3 5 6 7 8 9 10 11 12
TOTAL: 2,253,501
For RR Edifice
Asst. Executive Engineer Dy. Executive Engineer EXECUTIVE ENGINEER Superintending Engineer
Authorised Signatory VGP Sub-Divison VGP Sub-Divison VGP DIVISION Construction Circle
Markapur. Markapur. MARKAPUR Ongole
Page 9 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Name of work : Pula Subbaiah Veligonda Project–Package II-Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal including Construction of CM & CD works and
distributory system for 62,000 Acres on EPC Turnkey System
Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from Km. 3.400 (under tunnel). in all respects including roads,
plantation & Maintenance HPs & Drawings – As approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide SE’s Proced.No.
SE/CC(P)/OGL/194 M, Dt.14.03.2017 from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt., No.03VGP/2004, Dt.09.11.2004.
Percentage of Factors approval : CE & DWRO/Pkm DIST / OGL / DEE2/ AEE1 / 36 /2005 / VGP/ P-II / Vol.14, Dt: 10.08.2016.
1 2 3 4 5 6 7 8 9 10 11
TOTAL: 3,318,813
For RR Edifice
Asst. Executive Engineer Dy. Executive Engineer EXECUTIVE ENGINEER Superintending Engineer
Authorised Signatory VGP Sub-Divison VGP Sub-Divison VGP DIVISION Construction Circle
Markapur. Markapur. MARKAPUR Ongole
Page 10 of 67
Statement showing the "R" value after deduction of VAT (@ 2.8%) and Seignorag
Name of The Agency : M/s RR Edifice
Name of work : Pula Subbaiah Veligonda Project – Package II -Closing o
Excavation of Feeder Canal and Teegaleru Canal includi
CM & CD works and distributory system for 62,000 Acre
System
1 2 3 4 5 7 8
R - value after
Deduction 2.8% VAT
and Seignorage
Charges-Earth work
and Remarks
concrete works
(R)
9 10
1342832 #REF!
1342832
1116725
4305404
14171024
2525753
22,118,906
Engineer
Statement showing recoveries of Seignorage charges
1 2 3 5 6 7 8 = (6 x 7) 9
Total 116159
For RR Edifice
1 2 3 4 5 6.000 7.000
1 Steel placement 4 MRK(P-IID) P-42 23.191 23.191
Dec-18
2 11 RCC M30 6 MRK(P-IID) P-48 179.866 179.866
Total bill 11 & part
4504.21335 4.886
1590.75525 1.591
6.477
break-up for the RA bill No. 11,14& part
8 9 10 11 12 13 14
MT 33223.00 770474
1454864 65178 1389686
Cum 3805.00 684390
1454864 1454864 65178 1389686
74.00 492514
Cum 1364175 61115 1303060
147.00 734264
33.00 137397
1720600
24,101,314 24,101,314 1,079,739 23,021,575
7178829
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Other Materials Component
Name of The Agency : M/s Jai Prakash- gayatri (JV)
Name of work : Pula Subbaiah Veligonda Project – Package II - “Closing of Sunkesula Gap – Excavation of Feeder canal and Teegaleru
Canal including Construction of CM & CD works and distributory system for 62,000 Acres on EPC Turnkey System
SE's Areement No : 3VGP/2004-05, dt: 09.11.2004.
Percentage of Factors approval : CE & DWRO/Pkm DIST / OGL / DEE2/ AEE1 / 36 /2005 / VGP/ P-II / Vol.14, Dt: 10.08.2016.
1 2 3 4 5 6 7 8 9 10 11 12
Feb'17 2,288,857 188.900 198.345 185.500 347.442 21.06% 307,995
Mar-17 179,708 188.900 198.345 185.800 348.003 21.06% 24,273
1 Jun'17 93
May'17 18,640,060 188.900 198.345 112.900 176.237 330.092 21.06% 2,216,379
May'17 8,103,271 188.900 198.345 112.900 176.237 330.092 21.06% 963,512
Jun-17 5,543,395 188.900 198.345 112.700 175.925 329.507 21.06% 656,206
2 Jun'17 94
Jun-17 1,830,852 188.900 198.345 112.700 175.925 329.507 21.06% 216,729
TOTAL: 36,586,143 4,385,094
Page 22 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Machinery Component
Name of The Agency : M/s Jai Prakash- gayatri (JV)
Name of work : Pula Subbaiah Veligonda Project – Closing of Sunkesula Gap – Excavation of Feeder canal and Teegaleru Canal including
Construction of CM & CD works and distributory system for 62,000 Acres on EPC Turnkey System
SE's Areement No : 3VGP/2004-05, dt: 09.11.2004.
Name of the Project : P.S Veligonda Project Works - Package - II
Percentage of Factors approval : CE & DWRO/Pkm DIST / OGL / DEE2/ AEE1 / 36 /2005 / VGP/ P-II / Vol.14, Dt: 10.08.2016.
1) Labour = 19.96%, 2) Machinery = 33.07% & 3) Other Materials=21.06%
Machinery component for earth work & concrete works
Page 23 of 67
1 2 3 4 5 6 7 8 9 10 11 12
Asst. Executive Engineer Dy. Executive Engineer EXECUTIVE ENGINEER
General Manager VGP Sub-Divison - 1 VGP Sub-Divison - 1 VGP DIVISION
Dornala @ Markapur. Dornala @ Markapur. MARKAPUR
Page 24 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Labour Component
Name of The Agency : M/s Jai Prakash- Gayatri (JV)
Name of work : Pula Subbaiah Veligonda Project–Package II-Closing of Sunkesula Gap – Excavation of Feeder and
Teegaleru Canal including Construction of CM & CD works and distributory system for 62,000 Acres
on EPC Turnkey System
SE's Areement No : 3VGP/2004-05, dt: 09.11.2004.
Percentage of Factors approval : CE & DWRO/Pkm DIST / OGL / DEE2/ AEE1 / 36 /2005 / VGP/ P-II / Vol.14, Dt: 10.08.2016.
1 2 3 4 5 6 7 8 9 10 11
Page 26 of 67
Statement showing the "R" value after deductions of VAT (@ 2.8%) and Seignorage Charges
Name of The Agency : M/s Jai Prakash- gayatri (JV)
Pula Subbaiah Veligonda Project – Package II -Closing of Sunkesula Gap – Excavation of Feeder Canal and Teegaleru
Name of work :
Canal including Construction of CM & CD works and distributory system for 62,000 Acres on EPC Turnkey System
Page 27 of 67
RA BILL Work done value in Rs. R - value after
Deduction 2.8%
Bill Wise Earth VAT and
S.No Month of Earth work and work and Deduct Seignorage
M BOOK Reference
. Month- No. Recording concrete works concrete works
Deduct VAT
Seignorage Charges-Earth
Year (2.80%) work and
(R) Amount Charges
concrete works
(R)
3,833,125 P 13 of 3F
6,000,576 168,016 289,165 5,543,395
2,167,451 P 21 of 188 MRK(H)
2 Jun'17 94 Jun-17
214,715 P 30 of 10F
1,928,609 54,001 43,756 1,830,852
1,713,894 P 11 of 156 MRK(H)
94 Bill Total 7,929,185 7,929,185 222,017 332,920 7,374,248
Grand Total: 39,428,842 39,428,842 1,104,008 1,738,691 36,586,143
Page 28 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Labour Component
Name of The Agency : M/s Jai Prakash- gayatri (JV)
Name of work :
Pula Subbaiah Veligonda Project – Package II - “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal including
Construction of CM & CD works and distributory system for 62000 Acres on EPC Turnkey System
Percentage of Factor 1) Labour = 19.96%, 2) Machinery = 33.07% & 3) Other Materials = 21.06%
Work done value in Rs.
RA Bill Date of Earth work and Bill Wise Earth work and Deduct
S.No. Month-Year Deduct VAT M BOOK Reference
No. Recording concrete works concrete works Amount Seignorage
(2.80%)
(R) Charges
1 2 3 4 5 6 13
5 Sep-15 0 0
Page 29 of 67
Work done value in Rs.
RA Bill Date of Earth work and Bill Wise Earth work and Deduct
S.No. Month-Year Deduct VAT M BOOK Reference
No. Recording concrete works concrete works Amount Seignorage
(2.80%)
(R) Charges
Dec-15 8151901 P 19 of 4F
8 Dec-15 83 10526687 294747 46279 10185661
Dec-15 2374786 P 77 of 3JV140MRK
Feb'16 11374365 P 20 of 4F
9 Feb'16 84 15339041 429493 756426 14153122
Feb'16 3964676 P 28 of 3JV 138 MRK
Mar'16 5373070 P 21 of 4F
10 Mar'16 85 9464659 265010 219028 8980621
Mar'16 4091589 P 14 of 3JV 137 MRK
May'16 7142708 P 81 of 8F
12 May'16 87 7439610 208309 7231301
May'16 296902 P 39 of 3JV 139 MRK
Jun'16 7712553 P 32 of 5F
13 Jun'16 88 12008362 336234 760816 10911312
Jun'16 4295809 P 10 of 158 MRK(H)
Page 30 of 67
Work done value in Rs.
RA Bill Date of Earth work and Bill Wise Earth work and Deduct
S.No. Month-Year Deduct VAT M BOOK Reference
No. Recording concrete works concrete works Amount Seignorage
(2.80%)
(R) Charges
Page 31 of 67
Work done value in Rs.
RA Bill Date of Earth work and Bill Wise Earth work and Deduct
S.No. Month-Year Deduct VAT M BOOK Reference
No. Recording concrete works concrete works Amount Seignorage
(2.80%)
(R) Charges
Page 32 of 67
Work done value in Rs.
3 Mar'17 92 11442846 320400 181845 10940602
RA Bill Date of Earth work and Bill Wise Earth work and Deduct
S.No. Month-Year Deduct VAT M BOOK Reference
No. Recording concrete works concrete works Amount Seignorage
(2.80%)
(R) Charges
2758989
May'17 4789441 P 35 of 6F
May'17 306383 P 62 of 1F
Page 33 of 67
Work done value in Rs.
RA Bill Date of Earth work and Bill Wise Earth work and Deduct
S.No. Month-Year Deduct VAT M BOOK Reference
No. Recording concrete works concrete works Amount Seignorage
(2.80%)
(R) Charges
31499659 31499659
7929185 7929185
Aug'17 95
Page 34 of 67
Work done value in Rs.
Oct-17 96
RA Bill Date of Earth work and Bill Wise Earth work and Deduct
S.No. Month-Year Deduct VAT M BOOK Reference
No. Recording concrete works concrete works Amount Seignorage
(2.80%)
(R) Charges
7635902
14128381 14128381
53557225 49576865
For Jai Prakash - Gayatri (JV)
Page 35 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Labour Component
Name of The
M/s Jai Prakash- gayatri (JV)
Agency :
Name of work :
Pula Subbaiah Veligonda Project – Package II - “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru
Canal including Construction of CM & CD works and distributory system for 62000 Acres on EPC Turnkey System
Percentage of Factor 1) Labour = 19.96%, 2) Machinery = 33.07% & 3) Other Materials = 21.06%
1 2 3 4 5 7 8 9 10 11 12
5 Sep-15
Page 36 of 67
1 2 3 4 5 7 8 9 10 11 12
20 Aug'17 95
R - value after
Deduction 2.8% Machinery & Price Adjustment
VAT and Price index of 1.05X Price Index Machine Machinery & of Machinery
Date of Machinery for Machinery Price index
Month- RA Bill Seignorage Tools Tolls with LF percentage &Machinery
S.No. Recordin &Machinery &Machinery of Machinery &Machinery Tools of Tools
Year No. Charges-Earth With LF of (1.251)
g Tools during at Tools as on the during the month Machinery component( In
work and 1.402
concrete works the time of bid month of last (M1) component Rs.)
(R) tender opening date for Filling of (PM)=33.07% (VM=0.85 x
on Oct-2004 Bids (M0) (PM/100) x R x
((M1-M0)/M0)
2004-05 to 2011-12 to
2004-05 Series 2011-12 Series
1993-94 2004-05
1 2 3 4 5 7 8 9 10 11 12
5 Sep-15
Page 38 of 67
1 2 3 4 5 7 8 9 10 11 12
May'17 8103272 141.100 148.155 135.23 108.10 189.597 135.233 33.07% 637142
Jun-17 5543395 141.100 148.155 135.73 108.50 190.298 135.734 33.07% 443243
19 Jun'17 94
Jun-17 1830852 141.100 148.155 135.73 108.50 190.298 135.734 33.07% 146393
20 Aug'17 95
Jun-17 669636 141.100 148.155 135.73 108.50 190.298 135.734 33.07% 53543
21 Oct'17 96 Jul-17 253613 141.100 148.155 134.98 107.90 189.246 134.983 33.07% 19772
Sep'16 7250938 141.100 148.155 135.36 108.20 189.772 135.358 33.07% 572537
Jul-17 4805667 141.100 148.155 134.98 107.90 189.246 134.983 33.07% 374660
Page 39 of 67
1 2 3 4 5 7 8 9 10 11 12
Asst. Executive Engineer Dy. Executive Engineer EXECUTIVE ENGINEER
General Manager VGP Sub-Divison - 1 VGP Sub-Divison - 1 VGP DIVISION
Dornala @ Markapur. Dornala @ Markapur. MARKAPUR
Page 40 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Other Materials Component
Name of The Agency
M/s Jai Prakash- gayatri (JV)
:
Pula Subbaiah Veligonda Project – Package II - “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal
Name of work :
including Construction of CM & CD works and distributory system for 62000 Acres on EPC Turnkey System
Areement No : 3VGP/2004-05, dt: 09.11.2004.
R - value Other Materials component for earth work & concrete works
after
Deduction Price
2.8% VAT index of 1.05X Price All
All Price Adjustment
and Other Index for Price index Commoditie percentage
Date of Commoditi of Other Materials
Seignorage Materials Other of Other Materials s With LF of
S.N Month- RA Bill
Record es with LF of other component( In
o. Year No. Charges- during at Materials as during the month 1.873
(1.561) materials
ing (OM1) Rs.)
Earth work the time of on the month component
(VOM=0.85 x
and bid tender of last date for (POM)=21.06
(POM/100) x R x
concrete opening Filling of Bids %
2004-05 2011-12 2004-05 to 2011-12 to ((OM1-OM0)/OM0)
works on Oct- (OM0)
(R) 2004 Series Series 1993-94 2004-05
1 2 3 4 5 7 8 9 10 11 12 13 14
1 Mar-15 76 Mar-15 3270550 188.900 198.345 176.100 329.835 21.06% 388123
19 Jun'17 94 Jun-17 5543395 188.900 198.345 175.925 112.700 329.507 175.9247 21.06% 656206
Jun-17 1830852 188.900 198.345 175.925 112.700 329.507 175.9247 21.06% 216729
20 Aug'17 95
96 Mar-17 10865 188.900 198.345 185.500 113.200 347.442 176.7052 21.06% 1462
Jun-17 669636 188.900 198.345 175.925 112.700 329.507 175.9247 21.06% 79269
21 Oct'17 Jul-17 253613 188.900 198.345 177.798 113.900 333.015 177.7979 21.06% 30825
Sep'16 7250938 188.900 198.345 178.422 114.300 334.185 178.4223 21.06% 888951
Jul-17 4805667 188.900 198.345 177.798 113.900 333.015 177.7979 21.06% 584091
TOTAL: 273032250 34114742
28494731
5620011
For Jai Prakash - Gayatri (JV)
Page 42 of 67
Statement showing Seignorage charges From LS76 to LS 94 & Part Bill
Item of executed
quantitty of Material
actually course charges as per Amount in RA BILL wise
S.No. Month MB Ref Meterials
and fine Agreement Rs. amount in Rs.
aggregates used rates
on work in Cum
1 2 3 4 4 5 6 = (4 * 5) 7
EMBANKMENT
76 Mar-15 P.No. 18 of 132MRK(H) Embankment (Feeder Canal) 20757.150 13 269843 269843
78 Jul-15 P.No. 55 of 132MRK(H) Embankment (Feeder Canal) 27869.660 13 362306 362306
82 Nov-15 P.No. 88 of 133MRK(H) Embankment (Teegaleru Canal) 376.840 13 4899 4899
83 Dec-15 P.No. 15 of 162MRK(H) Embankment (Teegaleru Canal) 3559.900 13 46279 46279
P.No. 37 of 161MRK(H) Embankment (Feeder Canal) 57761.238 13 750896
84 Feb-16 756426
P.No. 37 of 161MRK(H) Embankment (Teegaleru Canal) 425.388 13 5530
85 Mar-16 P.No. 34 of 162MRK(H) Embankment (Teegaleru Canal) 16848.300 13 219028 219028
88 Jun-16 P.No. 57 of 161MRK(H) Embankment (Feeder Canal) 51744.340 13 672676 672676
89 Sep-16 P.No. 15 of 165MRK(H) Embankment (Feeder Canal) 107243.965 13 1394172 1394172
93 May-17 P.No. 90 of 162MRK(H) Embankment (Feeder Canal) 95064.290 13 1235836 1235836
94 Jun-17 P.No. 35 of 163MRK(H) Embankment (Feeder Canal) 22243.440 13 289165 289165
SE/CC(P)/OGL/DB/TO/TA/W-30/Es/19MRK
P.No.15 of 160
5 Dt: 23-01-2017 ( Revised Percetage of 76 89 03/15 09/16 20870933 -482465 9101826 29490294 91 28.01.17
MRK(H)
Factor and Linking Factor)
Percentage of Factor 1) Labour = 19.96%, 2) Machinery = 33.07% & 3) Other Materials = 21.06%
Page 46 of 67
RA BILL Work done value in Rs. R - value after
Deduction 2.8% VAT
Bill Wise Earth and Seignorage
S.No Month of Earth work and work and Deduct Charges-Earth work M BOOK Reference
. Month- No. Recording concrete works concrete works
Deduct VAT
Seignorage
Year (2.80%) and
(R) Amount Charges concrete works
(R)
8151901 P 19 of 4F
8 Dec-15 83 Dec-15 10526687 294747 46279 10185661
2374786 P 77 of 3JV140MRK
11374365 P 20 of 4F
9 Feb'16 84 Feb'16 15339041 429493 756426 14153122
3964676 P 28 of 3JV 138 MRK
Mar'16 5373070 P 21 of 4F
10 Mar'16 85 9464659 265010 219028 8980621
Mar'16 4091589 P 14 of 3JV 137 MRK
11 Apl'16 86 Apl'16 1725162 1725162 48305 1676857 P 29 of 3JV 138 MRK
7142708 P 81 of 8F
12 May'16 87 May'16 7439610 208309 7231301
296902 P 39 of 3JV 139 MRK
7712553 P 32 of 5F
13 Jun'16 88 Jun'16 12008362 336234 760816 10911312
4295809 P 10 of 158 MRK(H)
490156 P20/3JV118MRK
913750 P20/139MRK(H)
4791090 P42/3JV141MRK
14 Sep'16 89 Sep'16 11506418 49451783 1384650 1616170 46450963 P38/7F
1627082 P14/187MRK(H)
5812825 P18/158MRK(H)
24310462 P38/7F
1395906 P06/185MRK(H)
199497 P05/175MRK(H)
1724486 P09/180MRK(H)
13105166 P27/176MRK(H)
2320291 P34/ 06F
15 Dec'16 90 Dec'16 44422689 1243835 513437 42665417
4328607 P21/187MRK(H)
10312578 P23/158MRK(H)
243688 P06/189MRK(H)
9086995 P19/179MRK(H)
1705474 P34/ 06F
Page 47 of 67
RA BILL Work done value in Rs. R - value after
Deduction 2.8% VAT
Bill Wise Earth and Seignorage
S.No Month of Earth work and work and Deduct Charges-Earth work M BOOK Reference
. Month- No. Recording concrete works concrete works
Deduct VAT
Seignorage
Year (2.80%) and
(R) Amount Charges concrete works
(R)
818463 P16/185MRK(H)
1578940 P36/176MRK(H)
1247597 P10/191MRK(H)
537990 P08/191MRK(H)
16 Jan'17 91 Jan'17 10596034 296689 202783 10096562
2373830 P25/187MRK(H)
1360072 P28/158MRK(H)
853778 P09/189MRK(H)
1825364 P25/179MRK(H)
174650 P20/185MRK(H)
3371613 P11,12/183MRK(H)
1619178 P44/176MRK(H)
1583299 P26,27/139MRK(H)
674202 P16,17/191MRK(H)
261591 P31/158MRK(H)
182567 P14/189MRK(H)
183637 P33/179MRK(H)
1430296 P58/01F
Page 48 of 67
RA BILL Work done value in Rs. R - value after
Deduction 2.8% VAT
Bill Wise Earth and Seignorage
S.No Month of Earth work and work and Deduct Charges-Earth work M BOOK Reference
. Month- No. Recording concrete works concrete works
Deduct VAT
Seignorage
Year (2.80%) and
(R) Amount Charges concrete works
(R)
Feb'17 2354791 2354791 65934 2288857 P 22 of 4F
6214492 P 23 of 4F
May'17 9444520 20448453 572557 1235836 18640061 P 12 of 3F
4789441 P 35 of 6F
191225 P 10 of 175 MRK(H)
Mar-17 184885 5177 179708
-6340 P 18 of 180 MRK(H)
1100897 P 30 of 184 MRK(H)
18 Jun'17 93 375823 P 49 of 176 MRK(H)
1235474 P 36 of 139 MRK(H)
637165 P 25 of 191 MRK(H)
May'17 213305 8511530 238323 169935 8103272 P 15 of 188 MRK(H)
480447 P 18 of 189 MRK(H)
1921060 P 38 of 179 MRK(H)
306383 P 62 of 1F
2240976 P 08 of 156 MRK(H)
93 Bill Total 31499659
3833125 P 13 of 3F
6000576 168016 289165 5543395
2167451 P 21 of 188 MRK(H)
19 Jun'17 94 Jun-17
214715 P 30 of 10F
1928609 54001 43756 1830852
1713894 P 11 of 156 MRK(H)
94 Bill Total 7929185
20 Aug'17 95
Grand Total: 274397173 274397173 7683122 6672522 260041531
Percentage of Factor 1) Labour = 19.96%, 2) Machinery = 33.07% & 3) Other Materials = 21.06%
1 2 3 4 5 7 8 9 10 11 12
5 Sep-15
Page 50 of 67
1 2 3 4 5 7 8 9 10 11 12
20 Aug'17 95
Page 51 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Labour Component
Name of The
M/s Jai Prakash- gayatri (JV)
Agency :
Name of work :
Pula Subbaiah Veligonda Project – Package II - “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru
Canal including Construction of CM & CD works and distributory system for 62000 Acres on EPC Turnkey System
Percentage of Factor 1) Labour = 19.96%, 2) Machinery = 33.07% & 3) Other Materials = 21.06%
1 2 3 4 5 7 8 9 10 11 12
5 Sep-15
Page 52 of 67
1 2 3 4 5 7 8 9 10 11 12
20 Aug'17 95
Page 53 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Machinery Component
Name of The Agency : M/s Jai Prakash- gayatri (JV)
Name of work :
Pula Subbaiah Veligonda Project – “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal including Construction of CM &
CD works and distributory system for 62000 Acres on EPC Turnkey System
R - value after
Deduction 2.8% Machinery & Price Adjustment
VAT and Price index of 1.05X Price Index Machine Machinery & of Machinery
Date of Machinery for Machinery Price index
Month- RA Bill Seignorage Tools Tolls with LF percentage &Machinery
S.No. Recordin &Machinery &Machinery of Machinery &Machinery Tools of Tools
Year No. Charges-Earth With LF of (1.251)
g Tools during at Tools as on the during the month Machinery component( In
work and 1.402
concrete works the time of bid month of last (M1) component Rs.)
(R) tender opening date for Filling of (PM)=33.07% (VM=0.85 x
on Oct-2004 Bids (M0) (PM/100) x R x
((M1-M0)/M0)
2004-05 to 2011-12 to
2004-05 Series 2011-12 Series
1993-94 2004-05
1 2 3 4 5 7 8 9 10 11 12
5 Sep-15
Page 54 of 67
1 2 3 4 5 7 8 9 10 11 12
May'17 8103272 141.100 148.155 135.233 108.10 189.597 135.233 33.07% 637142
Jun-17 5543395 141.100 148.155 135.734 108.50 190.298 135.734 33.07% 443243
19 Jun'17 94
Jun-17 1830852 141.100 148.155 135.734 108.50 190.298 135.734 33.07% 146393
20 Aug'17 95
Page 55 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Machinery Component
Name of The Agency : M/s Jai Prakash- gayatri (JV)
Name of work :
Pula Subbaiah Veligonda Project – “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal including Construction of CM &
CD works and distributory system for 62000 Acres on EPC Turnkey System
R - value after
Deduction 2.8% Machinery & Price Adjustment
VAT and Price index of 1.05X Price Index Machine Machinery & of Machinery
Date of Machinery for Machinery Price index
Month- RA Bill Seignorage Tools Tolls with LF percentage &Machinery
S.No. Recordin &Machinery &Machinery of Machinery &Machinery Tools of Tools
Year No. Charges-Earth With LF of (1.251)
g Tools during at Tools as on the during the month Machinery component( In
work and 1.402
concrete works the time of bid month of last (M1) component Rs.)
(R) tender opening date for Filling of (PM)=33.07% (VM=0.85 x
on Oct-2004 Bids (M0) (PM/100) x R x
((M1-M0)/M0)
2004-05 to 2011-12 to
2004-05 Series 2011-12 Series
1993-94 2004-05
1 2 3 4 5 7 8 9 10 11 12
1 Mar-15 76 Mar-15 3270550 141.100 148.155 136.86 109.400 191.877 136.859 33.07% 271304
2 May-15 77 May-15 5318521 141.100 148.155 137.86 110.200 193.280 137.860 33.07% 455350
3 Jul-15 78 Jul-15 10608056 141.100 148.155 137.86 110.200 193.280 137.860 33.07% 908217
4 Aug-15 79 Aug-15 19272957 141.100 148.155 136.73 109.300 191.701 136.734 33.07% 1592349
5 Sep-15
Sep-15 8188929 141.100 148.155 135.48 108.300 189.948 135.483 33.07% 649327
6 Oct-15 81
Oct-15 3991216 141.100 148.155 136.86 109.400 191.877 136.859 33.07% 331086
7 Nov-15 82 Nov-15 9512739 141.100 148.155 136.61 109.200 191.526 136.609 33.07% 782786
8 Dec-15 83 Dec-15 10185661 141.100 148.155 136.36 109.000 191.175 136.359 33.07% 831380
Page 56 of 67
1 2 3 4 5 7 8 9 10 11 12
9 Feb'16 84 Feb'16 14153122 141.100 148.155 135.23 108.100 189.597 135.233 33.07% 1112827
10 Mar'16 85 Mar'16 8980621 141.100 148.155 135.73 108.500 190.298 135.734 33.07% 718079
11 Apl'16 86 Apl'16 1676857 141.100 148.155 134.86 107.800 189.071 134.858 33.07% 130173
12 May'16 87 May'16 7231301 141.100 148.155 134.73 107.70 188.895 134.733 33.07% 558955
13 Jun'16 88 Jun'16 10911312 141.100 148.155 134.86 107.80 189.071 134.858 33.07% 847038
14 Sep'16 89 Sep'16 46450963 141.100 148.155 134.36 107.40 188.369 134.357 33.07% 3544130
1 Dec'16 90 Dec'16 42665417 141.100 148.155 135.48 108.30 189.948 135.483 33.07% 3383078
2 Jan'17 91 Jan'17 10096562 141.100 148.155 135.23 108.10 189.597 135.233 33.07% 793869
3 Mar'17 92 Feb'17 10940602 141.100 148.155 135.36 108.20 189.772 135.358 33.07% 863875
Feb'17 2288857 141.100 148.155 135.36 108.20 189.772 135.358 33.07% 180729
Mar-17 179708 141.100 148.155 135.48 108.30 189.948 135.483 33.07% 14250
18 Jun'17 93
May'17 18640061 141.100 148.155 135.23 108.10 189.597 135.233 33.07% 1465625
May'17 8103272 141.100 148.155 135.23 108.10 189.597 135.233 33.07% 637142
Jun-17 5543395 141.100 148.155 135.73 108.50 190.298 135.734 33.07% 443243
19 Jun'17 94
Jun-17 1830852 141.100 148.155 135.73 108.50 190.298 135.734 33.07% 146393
20 Aug'17 95
Page 57 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Other Materials Component
Name of The Agency
M/s Jai Prakash- gayatri (JV)
:
Pula Subbaiah Veligonda Project – Package II - “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal
Name of work :
including Construction of CM & CD works and distributory system for 62000 Acres on EPC Turnkey System
Areement No : 3VGP/2004-05, dt: 09.11.2004.
1 2 3 4 5 7 8 9 10 11 12 13 14
1 Mar-15 76 Mar-15 3270550 188.900 198.345 171.554 109.900 321.320 171.5539 21.06% 362989
2 May-15 77 May-15 5318521 188.900 198.345 173.895 111.400 325.706 173.8954 21.06% 611341
3 Jul-15 78 Jul-15 10608056 188.900 198.345 173.427 111.100 324.829 173.4271 21.06% 1210953
4 Aug-15 79 Aug-15 19272957 188.900 198.345 171.710 110.000 321.613 171.71 21.06% 2144148
5 Sep-15
Sep-15 8188929 188.900 198.345 171.554 109.900 321.320 171.5539 21.06% 908866
6 Oct-15 81
Oct-15 3991216 188.900 198.345 171.866 110.100 321.905 171.8661 21.06% 445081
7 Nov-15 82 Nov-15 9512739 188.900 198.345 171.554 109.900 321.320 171.5539 21.06% 1055792
8 Dec-15 83 Dec-15 10185661 188.900 198.345 170.773 109.400 319.859 170.7734 21.06% 1117047
9 Feb'16 84 Feb'16 14153122 188.900 198.345 167.183 107.100 313.134 167.1831 21.06% 1466252
10 Mar'16 85 Mar'16 8980621 188.900 198.345 168.120 107.700 314.888 168.1197 21.06% 944601
Page 58 of 67
1 2 3 4 5 7 8 9 10 11 12 13 14
11 Apl'16 86 Apl'16 1676857 188.900 198.345 170.149 109.000 318.689 170.149 21.06% 182128
Page 59 of 67
1 2 3 4 5 7 8 9 10 11 12 13 14
12 May'16 87 May'16 7231301 188.900 198.345 172.334 110.400 322.782 172.3344 21.06% 812123
13 Jun'16 88 Jun'16 10911312 188.900 198.345 174.364 111.700 326.583 174.3637 21.06% 1262844
14 Sep'16 89 Sep'16 46450963 188.900 198.345 173.895 111.400 325.706 173.8954 21.06% 5339336
1 Dec'16 90 Dec'16 42665417 188.900 198.345 174.364 111.700 326.583 174.3637 21.06% 4937974
2 Jan'17 91 Jan'17 10096562 188.900 198.345 175.144 112.200 328.045 175.1442 21.06% 1181869
3 Mar'17 92 Feb'17 10940602 188.900 198.345 176.393 113.000 330.384 176.393 21.06% 1303765
Feb'17 2288857 188.900 198.345 176.393 113.000 330.384 176.393 21.06% 272758
Mar-17 179708 188.900 198.345 176.705 113.200 330.969 176.705 21.06% 21510
18 Jun'17 93
May'17 18640061 188.900 198.345 176.237 112.900 330.092 176.237 21.06% 2216379
May'17 8103272 188.900 198.345 176.237 112.900 330.092 176.237 21.06% 963512
19 Jun'17 94 Jun-17 5543395 188.900 198.345 175.925 112.700 329.507 175.925 21.06% 656206
Jun-17 1830852 188.900 198.345 175.925 112.700 329.507 175.925 21.06% 216729
20 Aug'17 95
TOTAL: 260041531 29634204
Page 60 of 67
Price Adjustment of Labour,Machinery and Other materials As Per G.O.M.S No.22
Other Materials Component
Name of The Agency
M/s Jai Prakash- gayatri (JV)
:
Pula Subbaiah Veligonda Project – Package II - “Closing of Sunkesula Gap – Excavation of Feeder and Teegaleru Canal
Name of work :
including Construction of CM & CD works and distributory system for 62000 Acres on EPC Turnkey System
Areement No : 3VGP/2004-05, dt: 09.11.2004.
1 2 3 4 5 7 8 9 10 11 12 13 14
1 Mar-15 76 Mar-15 3270550 188.900 198.345 176.100 329.835 21.06% 388123
5 Sep-15 0
Sep-15 8188929 188.900 198.345 176.500 330.585 21.06% 977341
6 Oct-15 81
Oct-15 3991216 188.900 198.345 176.900 331.334 21.06% 479046
7 Nov-15 82 Nov-15 9512739 188.900 198.345 177.500 332.458 21.06% 1151417
Page 61 of 67
1 2 3 4 5 7 8 9 10 11 12 13 14
11 Apl'16 86 Apl'16 1676857 188.900 198.345 177.800 333.019 21.06% 203815
Page 62 of 67
1 2 3 4 5 7 8 9 10 11 12 13 14
12 May'16 87 May'16 7231301 188.900 198.345 180.200 337.515 21.06% 908277
19 Jun'17 94 Jun-17 5543395 188.900 198.345 175.925 112.700 329.507 175.9247 21.06% 656206
Jun-17 1830852 188.900 198.345 175.925 112.700 329.507 175.9247 21.06% 216729
20 Aug'17 95
TOTAL: 260041531 32530235
Page 63 of 67
Reimbursement of difference in Seignorage charges as per Agreement clause 104 of GCC
Upto RA bill No. 10& Part
Name of work:-Pula Subbaiah Veligonda Project – Package II -Closing of Sunkesula Gap – Excavation of Feeder Canal and Teegaleru Canal including Construction of CM & CD works
and distributory system for 62,000 Acres on EPC Turnkey System
Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from Km. 3.400 (under tunnel). in all respects including roads, plantation &
Maintenance HPs & Drawings – As approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide SE’s Proced.No. SE/CC(P)/OGL/194 M, Dt.14.03.2017
from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt., No.03VGP/2004, Dt.09.11.2004.
Seignorage to be recovered as
RA Bill Details Seignorage as recovered per Agreement
Description of Quantity Difference to be
Sl.No. reimbursed as per Remarks
Month & Material Cum clause 104 of GCC
Bill No Year Rate Amount (RS.) MB Reference Rate Amount (RS.)
1 2 3 4 5 6 7 8 9 10 11 12
1 Metal 1560.118 75.00 117,009 P-7 of MB 2 33.00 51484 65,525
1 Feb-18 MRK(P-IID)
2 Sand 780.059 50.00 39,003 30.00 23402 15,601
3 Metal 1695.459 75.00 127,159 P-8 of MB 7 33.00 55950 71,209
2 Mar-18
4 Sand 847.73 50.00 42,387 MRK(P-IID) 30.00 25432 16,955
5 Metal 2945.113 75.00 220,883 P-28 of MB 7 33.00 97189 123,694
6 Aug-18 MRK(P-IID)
6 Sand 1472.557 50.00 73,628 30.00 44177 29,451
7 Metal 1643.465 75.00 123,260 P-54 of MB 7 33.00 54234 69,026
8 Oct-18 MRK(P-IID)
8 Sand 821.733 50.00 41,087 30.00 24652 16,435
7 Metal 939.285 75.00 70,446 P-61 of MB 7 33.00 30996 39,450
9 Dec-18 MRK(P-IID)
8 Sand 459.433 50.00 22,972 30.00 13783 9,189
Total difference amount in Seignorage charges to be Reimbursed as per Agreement clause 104 of GCC (Rs.) 456,535
For RR Edifice
Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from
Km. 3.400 (under tunnel). in all respects including roads, plantation & Maintenance HPs & Drawings – As
approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide SE’s Proced.No.
SE/CC(P)/OGL/194 M, Dt.14.03.2017 from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt.,
No.03VGP/2004, Dt.09.11.2004.
RA Bill Details
1 2 3 4 5 6 7
P- 03 of MB-2MRK (P-
1 1 Feb-18 11,308,376 565,419
IID)
P- 06 of MB-7MRK (P-
2 2 Mar-18 5,820,298 IID) 291,015
P- 26 of MB-2MRK (P-
3 3 Jun-18 13,758,118 IID) 687,906
P- 18 of MB-7MRK (P-
4 4 Jul-18 5,825,330 IID) 291,267
P- 41 of MB-2MRK (P-
5 5 Aug-18 4,857,903 IID) 242,895
P- 26 of MB-7MRK (P-
6 6 Aug-18 17,732,548 IID) 886,627
P- 46 of MB-7MRK (P-
7 7 Oct-18 13,679,779 IID) 683,989
P- 52 of MB-7MRK (P-
8 8 Oct-18 8,447,922 IID) 422,396
For RR Edifice
Asst. Executive Engineer Dy.Executive Engineer
VGP Sub-Divison V.G.P.Sub Division
Authorised Signatory Markapur. Markapur
Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from
Km. 3.400 (under tunnel). in all respects including roads, plantation & Maintenance HPs & Drawings – As
approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide SE’s Proced.No.
SE/CC(P)/OGL/194 M, Dt.14.03.2017 from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt.,
No.03VGP/2004, Dt.09.11.2004.
RA Bill Details
1 2 3 4 5 6 7
P- 46 of MB-7MRK (P-
1 7 Oct-18 13,679,779 683,989
IID)
P- 52 of MB-7MRK (P-
2 8 Oct-18 8,447,922 IID) 422,396
P- 59 of MB-7MRK (P-
3 9 Dec-18 7,331,635 IID) 366,582
For RR Edifice
Asst. Executive Engineer Dy.Executive Engineer
VGP Sub-Divison V.G.P.Sub Division
Authorised Signatory Markapur. Markapur
Sub-Work:- Package No. IID-Earth work Excavation and construction of under tunnel of Feeder Canal from
Km. 3.400 (under tunnel). in all respects including roads, plantation & Maintenance HPs & Drawings – As
approved in Package No.II (Part of Balance work deleted) under 60(C) of P.S. to APDSS vide SE’s Proced.No.
SE/CC(P)/OGL/194 M, Dt.14.03.2017 from the scope of the M/s Jai-Prakash Gayatri(JV), Hyderabad vide Agt.,
No.03VGP/2004, Dt.09.11.2004.
RA Bill Details
GST @ 5% on Total
Sl No bill Amount (Rs.) Remarks
No Month & Year Amount (Rs.) MB Reference
1 2 3 4 5 6 7
For RR Edifice
Asst. Executive Engineer Dy.Executive Engineer
VGP Sub-Divison V.G.P.Sub Division
Authorised Signatory Markapur. Markapur