PROJECT NAME: RAJIV GANDHI NATIONAL AVIATION UNIVERSITY HOSTEL BLOCK

Location : Fursatganj, Uttar Pradesh


Site Area : 7,422.9 m2
Built-up Area : 14,681 m2
Typology : Residential
Energy Consumption Reduction : 30.9% reduction in Energy Consumption compared to GRIHA
benchmark
EPI : 69.1 kWh/ m2/year
GRIHA Provisional Rating : 3 Star Rating (Version: 3.1)
Year of Completion : 2021

The following strategies were adopted to reduce building impact on the natural environment:
Þ Sustainable Site Planning:
• Air pollution control measures such as site barricading, covering of fine construction materials and other
appropriate measures were strictly adhered to during construction.
• 583.9 cu.m top soil was preserved at site and reused for landscaping.
• 28 trees were sacrificed for development. 113 new trees were planted on site.

Þ Water Management:
• Reduction of 52.44% from the GRIHA base case has been demonstrated in the building water demand by
installing efficient low-flow fixtures.
• Reduction of 57.25% from the GRIHA base case has been demonstrated in the landscape water demand
efficient irrigation systems.
• Gunny bags were used for curing of columns.

Þ Energy Optimization and Occupant Comfort:


• For achieving visual comfort:
» 81% of the regularly occupied spaces are day-lit and meet the daylight factor as prescribed by NBC 2005.
» Automatic timer based control has been provided for 100% of the outdoor lighting system.

• For achieving thermal comfort:


» EPI reduction of 30.9% from the GRIHA base case has been demonstrated through the integration of high
performance systems.

Þ Renewable-energy-based hot water system:


• Solar photovoltaic system of capacity 30 kWp has been installed.

Þ Sustainable Building Materials:


• Kota stone, vitrified tiles, ceramic tiles and granite have been used as flooring materials.
• Calcium silicate has used as false ceiling materials.

Þ Waste Management:
• Multi-colored bins have been provided for segregation of dry & wet waste.
• Central waste collection area has been provided for storage of segregated waste on site.
• Fluidized aerobic bio reactor (FAB) type STP of 200 kLd capacity has been installed.

Integrated Design Team:

Client : Rajeev Gandhi National Aviation University


Principal Architect : Axis Consultants
Landscape Architect : Axis Consultants
Electrical Consultant : Axis Consultants
Structural Consultant : Axis Consultants
Green Building Design and Certification : Passive Design Consultants