1) LOADING
WEIGHT (KG) LIFT BIL SIZE TOTAL (KG)
1 FRAME 15.6 4 62.4
2 CROSS BRACE 4.2 4 2 33.6
3 JOINT PIN 0.5 16 1 8
4 JACK BASE 4.9 4 19.6
5 TIE BACK 2.2 8 17.6
6 BRACING TUBE 7 1.5 2 1.8 37.8
7 NETTING 1.2 9.6 11.52
8 LADDER 29.3 4 0.5 58.6
9 CATWALK BORD 15.8 4 0.5 31.6
10 GUARD RAIL 3.6 38.4 138.24
TOTAL 418.96
3) WALL TIE
Area length 9.2 m
*Refer to Front view scaffold drawing width 1.2 m
area 11.04 m²
Tension on Wall Tie due to wind load = Area x tension pressure coefficient x Dynamic wind pressure
*References 3.12984 kN
drop in 12-16 mm
M12 M16
30Mpa 20Mpa
4.9kN 5.6kN
Table 1
Mem Force Type 9772.96 N 9772.96 N F
AB 10347.17N compression E
BC 10347.17N tension 1.7
CD 10347.17N compression
BE 14232.87N tension A B C D
CF 14232.87N tension 1.8 1.8 1.8
a) Section properties of pipe
Section area A 292.8 mm²
Py 275 N/mm²
r 16.5 mm
b) check compression
Max compression = √(Total vertical force² - Total load per leg² ) 4512.969318 N
c) Check Tension
Max.Tension Force (Refer Table 1) 14232.87 N
Tension capacity of section (Py x Area) 80520 N > Maximum tension force OK
d) Check Shear
Max.Shear Force 4262.25
Shear Capacity Force = k² x section area x Py 31958.39 N > Maximum shear force OK
5) Soil Stress
Try 50 x 100 timber as sole plate and assuming soil bearing capacity of 7500 kg/m²
Appendix
Table of Soil Bearing Capacity (SBC) (in unit tones per square metre)
LOOSE 10 - 20
SAND
COMPACT 20 - 40
LOOSE 20 -40
COMPACT 40 -60
SANDY GRAVEL
HARD 30 -60
SOFT 15
VERY HARD 120
ROCK MODERATELY HARD 50 - 120
SOFT 20
VERY STIFF 30 - 60
STIFF 15 - 30
CLAY
FIRM 7.5 - 15
SOFT-LESS THAN 7.5
STIFF 15 - 30
SANDY CLAY FIRM 7.5 - 15
SOFT-LESS THAN 7.5
Prepared by:
1700
1700
1700
1700
1700
1700
1700
1700
1 PLAN NTS 2 SECTION