Section 9
Multiple-Stage Fracturing
Contents
Notes
Section 9
Multiple-Stage Fracturing
3. To fracture the second zone from the bottom, When performing a multiple-stage fracturing job,
drop a ball to seal in the baffle, forming a new use Multiple-Stage cementer shutoff or latchdown
bottom. After this step is completed, any frac- plugs and baffles.
turing fluid pumped into the hole will be
forced through the second set of perforations
into the formation.
Specifications Directory
Fracturing Baffles
801.03210
10-rd NU
3 1/2 (88.9) 801.03237 2.370 (60.2)
8-rd EUE 801.03269 2.180 (55.4)
801.03217 2.370 (60.2)
801.03013 2.700 (68.6)
4 1/2 (114.3) 8-rd 801.03205 3.000 (76.2)
801.03265 3.310 (84.1)
801.03266 3.560 (90.4)
5 (127.0) 8-rd 801.03245 3.000 (76.2)
Fracturing Balls
Diameter
Part Number Specific Gravity
in. (mm)
2.000 (50.8) 70.00356 3.4
5 1/2 (139.7) 3.500 (88.9) 3.750 (95.3) 4800 (33,096) 5500 (37,922)