Foreword
Thank you for choosing our CNC machines.
This operation manual is delivered together with the machine for safe
Go through the operation manual carefully for the safety of operator and
machine and better performance. Follow the manual for wiring and operation.
S
MA
2 / 30
S
MA
3 / 30
S
MA
4 / 30
Chapter 1 Inspection on arrival
Strict inspection and packing are done before delivery. Open the carton for
inspection for the following items as damage may occur during transportation.
Make sure there is no damage for the machine and cable connection.
S
MA
1.Follow the safety precautions below to avoid electric shock, physical injury,
fire and other accidents. For the safety of you and others, please go through
environments. The workshop should meet the fire safety requirements and
S
equipped with dry-chemical fire extinguisher and carbon dioxide fire
Cleanliness: keep the work place and machine clean. No piled up stuff on the
Beware of electric shock: avoid direct contact with spindle, power output,
grounded and all the parts are normal before starting the machine.
for operation of the machine. Wear protective glasses when machining metal or
materials with lots of saw dust. Non-operators are not allowed to operate the
6 / 30
machine, modify the system parameters or stay around the machining area. Do
not touch the spindle during machining. Shut down the system and cut off the
Operation rules: follow the procedure and fix the work-piece accordingly. Do
not hold the work-piece with hands. Reasonable use of tools can enhance the
4.Maintenance: keep the machine clean and fill with oil periodically; change the
water for pump frequently and clean it at regular intervals; Do not run the water
pump with no water or not enough water; water-cooled spindles are not allowed
S
to be used with no water or water flow is not smooth.
5.Safe operation: change of tool or work-piece shall be done after the spindle
MA
comes to complete stop. Keep a certain distance while machining. Push the
machine.
Do not remove the signs for safety warning, attention or indication. Place
7 / 30
the manual around the machine for the operator and maintenance people.
Please read carefully and pay attention to the signs for danger, warning and
S
MA
8 / 30
Installation and commissioning
Installation illustration:
Installation
1. Place the machine on flat and firm ground. Level it with gradienter.
S
Use the screws to keep the machine level.
② Install the dust collecting hood on the spindle and fix it on the base.
9 / 30
③ Fix the dust collecting tube to the bracket and connect the dust collecting
hood and dust collector. (move the spindle to the rightmost end of the beam for
S
3. Water tank should be provided for water-cooled spindle.
MA
4. Connect the four-core power line with suitable power rating to the main
switch and connect the other end to the main power switch. One of them should
10 / 30
Installation of vacuum pump
S
1. Put the vacuum pump on flat ground and fix with screws.
2. Connect the vacuum pipe to the vacuum suction hole and tighten the clasp
MA
screw.
11 / 30
indicated, if not, exchange of any two output lines of water pump power supply
2. Input three-phase power, start the dust collector to see if the motor rotation
direction is same as indicated, if not, exchange of any two lines will fix the
problem.
3. Connect the suction holes of the machine and dust connector with the tube.
S
MA
12 / 30
53C System operation illustration
Open the computer and find out Ncstudio on desktop; double-click to start the
software.
Switch on emergency stop and power switch to see if the light for drive unit and
S
frequency inverter and indication on panel are normal.
MA
Back to mechanical origin
All axes back to mechanical origin as show below; it is a must to go back to the
S
MA
After choosing all axes, then it is shown as below that all axes are back to zero.
Tool adjustment
Switch on the cylinder and the positioning cylinders raise. Confirm the
coordinate origin of work-piece, normally it is at the lower left quarter. Put the
work-piece on the table, turn on vacuum switch to see if the work-piece can be
sucked tightly. Then switch off the cylinder for the next step.
S
Switch on cylinder1 in the system and move spindle T1 to the working area.
MA
Move X, Y and Z axes so that the tool center points to the lower left quarter of
the work-piece and the tip of the tool touches the surface of the work-piece.
Right-click "CNC status" then "offset setup" pops up. Press the button "set
X, Y axes" to complete the Tool1 coordinates setting. And fill the displayed data
into the "tool length offset"; complete the coordinates settings of Z axis.
S
MA
There is no need to set the coordinate offset of X and Y axes for T2. T2 needs
to touch the surface of the work-piece only. Adjust the tools once then the
system can keep the data automatically. Re-check the tool length offset after
changing tools or work-pieces. (T3 repeats the steps for T2 tool adjustment. )
Press F7 or left click on the icon "back to coordinate origin of work-piece " then
X and Y axes will move to the coordinate origin while Z axis will stop at the set
Simulation processing
S
Open system operation "document"→"open and load"→look for the document to
imported.
MA
S
Press F8 or left-click "simulation" icon to double-check the file then press F8 or
MA
click again to exit "simulation". Check if the processing path is same as the
Pause: press F10 or left-click "pause" icon; press F9 or click "start" to continue
the machining.
S
Breakpoint resume: do remember to mark the current line number if breakpoint
MA
resume is needed. Press Ctrl+F9 or click "operation"→"advanced start"→
in the manual control mode. Every axis cannot be moved because of the
MA
protection function. This is a normal situation. Click “I/O state” to check which
axis is limited alarming. The point which shows green means that axis is the
or Y axis, press “+”. If the alarm is from Z axis, press “-” to release the limit.
1 Maintenance
Each machine has a run-in period. Please use low speed to run the machine in
the first three months. The control cubicle should be well ventilated. And clean
2 Maintenance rules:
Clean the dust during daily work. Remember to lubricate the machine.
Especially the friction and rotating parts like bar screw, sliding block and
S
bearing. Otherwise it will affect the product quality and service life.
Way to maintain:
MA
The control case should be positioned at a well ventilated place. Do not put it in
Keep the control case dry and clean. It is easy for the electric parts to be short
out or lead to fire if the control case stay in wet or high temperature situation.
4.24 Maintenance of main motor: In air cooling spindle please check the
main spindle fan if it is heat dissipating normally. Clean the dust in the fan
regularly. Prevent the water getting into the motor. In water cooling spindle
2. Clean the machine every day. Remove the sundries which on the table,
limiting stop and guide rail. Put the lubricating oil on the guide rail. You can
3. Lubricating part: The guide rail, slider, gear, rack, lead screw and gear of X,
Y, Z axis.
4. Lubricating procedure: Clean the dust on rack, spindle, lead screw guide rail
S
clean it by gasoline. Please try running after lubricating to let every part get
lubricated.
MA
5. Lubrication period: It depends on working situation and usage condition.
Normally you should clean the machine and lubricate it after work every day.
6. Lubricating method: Put the lubricating oil into the slider by grease gun. And
1. Please select the clean water without impurity for the water pump and
2. If you choose hard water for working liquid, it should be melted. Or wash the
vacuum pump by solvent regularly.
3. In normal condition, the bearing and attached parts should be cleaned of the
waste oil and impurity after running 20,000 hours or at most 3 years in 50Hz
motor. Then input the new oil. The oil is better to be covered 50% in the
freedom room and 65% in the bearing cap room. If the working situation is
4. Open the water outlet of the tank to let the water flow out when you are
going to exhaust the air. Rotate the fan for running the vacuum pump till run
out of water. Tilt the pump 45 degrees helps evacuating the water. In this
S
way, the pump cannot be damaged although it stop running for a long time
6. If the vacuum pump has stopped using for about 4 weeks, first you should
evacuate the pump according to Item 3. Then input 0.5L preservative oil into
the pump from suction inlet or exhausting outlet and try to run it for a short
time.
7. If the impeller is locked by long time stop using pump with hard water, try to
1. Check the fan regularly; grease the bearing once per week; check if there is
anything attached to the fan; clean it from time to time to avoid damage due to
2. First close the front air hole of the tube and leave 2-3 air holes so that the
dust in the tube can be cleared. Then start closing the holes from the back till
3. Clean the dust bag regularly and check if the dust exit is blocked. Clear the
S
MA
Use of tools
1. All the tools provided by New Mas are designed for clockwise rotation
operation.
2. Choose the suitable chucks and do not use the ones with fracture surface,
deformation, severe wear or inner hole with taper to avoid vibration of knife
3. When the knife handle appears the uneven contact mark or dent, that
means the tools are not fixed properly or the chuck could not clamp the tools
S
properly. Need to fix the tools properly or replace the chuck. Replace the
tools in time and avoid blunt tools which may lead to accidents.
MA
4. Use the right cutting speed and stock removal according to different
materials and tools for longer service life of the tools. Use low working
speed for bigger tools and finish the cutting in several times instead of one.
Maintenance of tools
1. Keep the tools clean and clean with special solvent for the filth and rust.
2. Apply moderate mechanical oil to the tools to prevent rust on the surface.
Free maintenance for one year provided by New Mas if the user follows the
operation rules and use the machine as instructed despite man-made failure.
manufacturer.
engraving system within warranty period by New Mas. The proprietorship of the
S
replaced components belongs to New Mas.
2. Wear parts are not in the scope of warranty. One month warranty for
MA
accessories shipped with machine like tool apron, jigs, power and data line etc.
The following components are not in the scope of warranty like synchronized
belt, vacuum pipe, dust collecting tube. Warranty is available for machine
failure itself. Only telephone consultation service is available for other failures
compensation liability. New Mas is not responsible for any other loss due to
(3) Spindle motor failure caused by improper use of tools or bad quality
of tools.
S
and ill-use of the machine, modification without authorization or repair and
replace of components.
MA
(6) Can not present the warranty card and machine No.; record for
instruction.
after-sale service.
maintenance.
6. Other reasons:
1)No free maintenance even if it is in the warranty scope for the failures caused
problems can be solved. New Mas will not be responsible any problem due to
S
MA
MA
S