Harbor & Coastal Traffic Planning

Status of Division
• Manpower Resources Water Resources Div.

Hyoungjoon Kim

Professional Engineers/Ph.D 35 (23%)


Water Resources Dept. Hydropower Dept.
Top Class Engineers 61 (41%)
Yongju Moon Youngki Kim
Senior Engineers 29 (19%)

Junior Engineers 20 (13%) Water Resources Management The Others Watershed Management Dam Design & Planning

Admin. 6 (4%) 1st 2nd 3rd 4th 5th 6th 1st 2nd 3rd 4th 5th 6th
Design Design Design Design Design Design Design Design Design Design Design Design
Team Team Team Team Team Team Team Team Team Team Team Team

0 20 40 60

• Service Fields
Business Fields
Flood Control Water Regulation Environment Etc.

 Flood Control Plan of River  River Maintenance Plan in  Ecological river restoration  Flood Map Preparation /
Basin the Context of the - Feasibility study Feasibility Study of Water
 Master Plan for mitigation Hydrological - Master plan Damage
damage from storm and  Cycle / Plan for Securing - Detailed design  Facilities investigation
flood Stream Maintenance Water  Restoration / Storm Water
 River Maintenance Detailed  Water Quantity and Water Retention Pond
Design Balance Reviews Construction Plan
 Storm Water Pumping
Station Expansion and
Construction Plan
Major Projects

• Flood Control & Bank Protection Works • Flood Control & Bank Protection Works
- Embankment & Revetment Reinforcement : L=4.76 km - Embankment & Revetment Reinforcement : L=7.65 km
• Riverside Park • Riverside Park
- Nature Learning Park, River View Deck, Bike Lane, etc. - Nature Learning Park, River View Deck, Bike Lane, etc.
Major Projects

• Bank Protection Works • Flood Control & Bank Protection Works


- Revetment Reinforcement : L=7.3 km - Embankment & Revetment Reinforcement : L=19.3 km
• Riverside Park • Eco-friendly Waterfront Place
- Cultural Park (L=1 km), Cultural Center (A=1,675 m2), etc. - Recreation of Natural river, Landscape Improvement, etc.
Major Projects

• 3R (Restoration, Restart and Recreation) • Stream Restoration in Metropolitan City


- Restoration of History, Emotion and Environment - Creation of a waterfront area with flood safety
- Restart as Cultural and Tourism Center - Restoration of the existing urban stream as eco-friendly one
- Recreation of Land Mark and Water front
Comprehensive Plan for Storm and Flood Disaster Prevention and Mitigation

Comprehensive Analysis Establishment of Comprehensive Plan


 Regional Characteristics and Causes of Damage  Structural Measures
 Disaster RiskAssessment, etc.  Non-structural Measures
Improvement of Stormwater management systems

Flood Inundation Debris Flow Flooding Pumping Station Floodwater Retention Facilities Stormwater Pipeline

River Improvement

Stormwater Flooding Wind Damage River Channel – Case 1 River Channel – Case 2
Others

Costal Flooding Typhoon Damage Flood Forecasting System Inhabitant Briefing Session Public Relations
Comprehensive Plan for Storm and Flood Disaster Prevention and Mitigation
Comprehensive Plan for Storm and Flood Damage Reduction
In SEOUL
Comprehensive Plan for Flood Prevention Measure
Low Land and Flood prone Area in Seoul
 Embankment and Bank Protection : 42km
 Bridge Planning : 67EA
 Sewage Pipe Improvement : L=64km
 Rain Storage : 15EA,
 Grift Chamber : 6EA
 Drainage pump station Planning : 19EA
 Slope Failure Prevention Facility : 107EA

Location Elevation Analysis Flooding Record

30-year Maximum rainfall

Inundation simulation result Review of pumping capacity


Comprehensive Plan for Storm and Flood Disaster Prevention and Mitigation
In KOREA
Gyeonggi Province : 4 districts Gangwon Province : 1 district
Seoul Metropolitan City
Chungbuk Province : 5 districts
Chungnam Province : 5 districts

Gyeongbuk Province : 23 districts


Sejong City

Jeonbuk Province : 3 districts

Ulsan Metropolitan city : 5 districts

Gyeongnam Province : 18 districts

Jeonnam Province : 7 districts

Total : 75 districts
Jeju Province : 2 districts
Enhancement of Stormwater Pumping Station (82 Projects)

• Basic and Detailed Engineering Pumping Station • Basic and Detailed Engineering Pumping Station
- Capacity: 1,940 m3/min - Capacity: 1,720 m3/min
- Detention Pond: V=90,000 m3 - Detention Pond: V=2,900 m3, A=1,080 m2
Enhancement of Stormwater Pumping Station (continued)

• Basic and Detailed Engineering Pumping Station • Basic and Detailed Engineering Pumping Station
- Capacity: 600 m3/min - Capacity: 1,112 m3/min
- Detention Pond: V=91,100 m3
Domestic Projects (more than 70 Projects)

• MP, FS, DD and CS • MP, FS, DD and CS


- Installed Capacity: 400 MW (the Largest one in Korean HP dams) - Installed Capacity: 101 MW
- Flood Control Capacity: 616 million tons - Flood Control Capacity: 80 million tons
- Annual Water Supply: 3,380 million tons - Annual Water Supply: 599 million tons
Domestic Projects (continued)

• Feasibility Study and Detailed Engineering Design • Basic Engineering Design


- Improved the function of the existing irrigation reservoir to - Developed as a Land Mark of the Region (Tourist Spot)
the multi-purpose dam (the First attempt in Korea) (Constructed a beltway (14.3 km), Water park, Camp Site
Cultural Museum, etc.)
Overseas Projects (more than 20 Projects)

• Detailed Engineering Design and Construction Supervision • Basic and Detailed Engineering Design
- Installed Capacity: 6.6 MW - Installed Capacity: 150 MW
- Flood Control Capacity: 189.65 million tons - Annual Energy Output: 631.3 GWh
- Annual Water Supply: 31,840 ha