(1)
(i)
2m 0.3 m
1m
1m
7m
30
5m
6 10 /m` (U)
6 10 /m` (U)
6 10 /m` (L)
9 10 /m` (L)
x 5m x
5m
Plan
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
p= γ h = 1 * 17 = 17 kN/m2 wα 5
- Floor:
w = γ ts + γ wh
= 25 * 0.3 + 1 * 17 = 24.5 kN/m 2
5 * 0.76 4
r= = 1.25
4 * 0.76
r4
α= 4 = 0.7 → β = 1 - α = 0.3 (Grashoff ' s coefficients)
r +1
w α = 0.7 * 24.5 = 17.15 kN/m 2 , w β = 0.3 * 24.5 = 7.4 kN/m 2
Straining Actions
* Vertical strip
17.2 kN/m`
17 kN/m` 17 kN/m`
8.2 8.2
+ 0.82 0.82
14.45 14.45
26.2
N. F. D B. M. D
* Section in Floor
7.4 kN/m`
5m 5m
18.5 18.5 18.5
18.5 18.5
B. M. D
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
(3) (2)
(4)
Sec. (1)
water side section
M = 8.2 kN.m
t = 50 M = 50 8.2 = 143.1 mm
take t s = 300 mm
f ctr
f ct = f ct (M) >
η
6M 6 * 8.2 * 10 6
where, f ct ( M ) = 2 = 2
= 0.546 N/mm 2
bt 1000 * 300
f ctr = 0.6 f cu = 0.6 25 = 3 N/mm 2
f ct ( N )
t v = t [1 + ] = 300 → η = 1.45
f ct ( M )
f ctr 29.76
∴ = = 2.06 N/mm 2 > f ct (o.k)
η 1.45
Sec. (2)
M = 8.2 kN.m & T = 14.45 kN (water side section)
t = 50 M + 30 = 173 mm
take t s = 300 mm
f ctr
f ct = f ct ( N ) + f ct (M) >
η
T 14.45 * 1000
f ct ( N ) = = = 0.048 kN/mm 2
Ac 300 *1000
6M 6 * 8.2 *10 6
f ct (M) = 2 = 2
= 0.546 kN/mm 2
bt 1000 * 300
∴ f ct = 0.048 + 0.546 = 0.594 kN/mm 2 →
f ct ( N ) 0.048
t v = t[1 + ] = 300[1 + ] = 326.3 mm
f ct ( M ) 0.547
f ctr
∴η = 1.45 , f ctr = 3 kN/mm 2 ∴ = 2.06
η
f ctr
∴ f ct < o.k
η
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
Sec. (3)
M =26.2 kN.m & T = 14.45 kN (air side section)
t = 300 mm & d = 260 mm
Sec. (4)
2m
wl 2 53.7 * 5 2 wl 2 53.7 * 5 2
M + ve = = = 112 kN/m , M − ve = = = 134 kN/m`
12 12 10 10
For - ve moment
M u = 1.5 *134 = 201 kN.m , d = 1900 mm
Mu 201 *10 6
d = c1 ,1900 = c1 → c1 = 11.6
f cu b 25 * 300
J = 0.826
Mu 201 *10 6
As = = = 360 mm 2
f y dJ 360 * 1900 * 0.826
use 3 16 for - ve &+ ve moment /m`
* Shear capacity has to be checked according to code provisions for deep beams
β=0.5
Max. reaction of beam α= 1/3 2
R = 1.1 wl = 1.1 *44.4 *5 = 244 kN 2
a b c
For beam 2
Sec. of beam = 300 * 1000
o.w = 25 *0.3*1= 8 kN/m`
M = 41 * 2 2 / 2 = 82 kN.m
M u = 1.5 M = 123 kN.m
Mu 123 * 10 6
d = c1 ,95 = c1 → c1 = 7.4
f cu b 25 * 300
J = 0.826
Mu 123 * 10 6
As = = = 440 mm 2
f y dJ 360 * 950 * 0.826
use 3 16 , A`s = 2 12
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
1m
Design of sec.
N = 788 kN
Nu = 1.5 *788 = 1182 kN
H e 17.6
λ= = = 17.6 < λ max o.k
t 1
λ > 10 ∴ (long column)
2
λ2 t 17.6 *1000
δ= = = 155 mm
2000 2000
155
∴ M add = Pδ = 788 * = 12.2 m.t
1000
M design = M 2 + M add , where M 2 is due to wind load
= 100 + 122 = 222 kN.m
N u = 1182 kN , M u = 1.5 * 222 = 333 kN.m
Mu 333
e= = = 0.3 m
N u 1182 M N
+ 300
e 0.3 1000
= = 0.3 > 0.05 o.k
t 1
6 10/m` 6 10/m`
6 10/m` 6 10/m`
3 16/m` 3 16/m`
6 10/m` 6 10/m`
12
16
12
12
10/m`
10/m`
6
2
2
6
30
6 10/m`
6
6
6 10/m`
100
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
Prob. (2)
40
4m
2m
60o
4m
4m
x x
4m
Sec. Elevation x-x
Plan
Loads
The floor and wall will be considered as way slab in the plane of the paper.
Assume t = 40 cm
Floor
wf = γ ts + γw h
= 25 *0.4 + 10*2 = 30 kN/m2
Wall
ww = γ ts = 25 *0.4 = 10 kN/m2
P = γw h = 20 kN/m2
Straining Actions
L
p p 2m
wf ww
4m
2.3 m
2m
60o
1.16
31.2 31.2
31.2 31.2
_ _
+ 25.3 kN +
25.3 kN
20 20
28.8
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
N. F. D B. M. D
23.1 kN
60o 23.1 kN
water pressure
29.2 sin 60 o.w of wall + water weigh
25.3 kN = 1*23.1 +00.5*0.76*16
=29.2 kN
take t = 400 mm
f
f ct = f ct ( N) + f ct (M) > ctr
η
T 20 *1000
f ct (N) = = = 0.5 N/mm 2
Ac 100 * 40
6M 6 * 312 *10 6
f ct ( M ) = 2
= 2
= 1.17 N/mm 2
bt 1000 * 400
f ct = 0.5 + 1.17 = 1.67 N/mm 2
f ct ( N ) 0.5
t v = t[1 + ] = 400[1 + ] = 570 mm , η = 1.65
f ct ( M ) 1.17
f ctr
f ctr = 0.6 f cu = 3 N/mm 2 → = 1.82 N/mm 2
η
f ctr
∴ f ct > o.k
η
Mu 42 *10 6
d = c1 , 360 = c1 → c1 = 8.78
f cu b 25 *1000
J = 0.826
use φ max = 10 mm ∴ β cr = 0.85
M us Tu
As = +
β cr f y dJ β cr f y / γ s
42 * 10 6 30 *1000
= + = 5.74 mm 2
0.85 * 360 * 360 * 0.826 0.85 * 360 / 1.15
choose 8 10 /m`
A`s = 6 10 /m`
Sec. (2)
M us 38.4 *10 6
d = c1 , 360 = c1 → c1 = 9.19
f cu b 25 *1000
J = 0.826
use φ max = 10 mm ∴ β cr = 0.85
M us Tu
As = +
f y dJ f y / γ s
38.4 *10 6 30 *1000
= + = 455 mm 2
360 * 360 * 0.826 360 / 1.15
choose 6 10 /m`
A`s = 6 10 /m`
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
Sec. (3)
85 kN/m`
4m 4m
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
+ ve wl 2 85 * 4 2
M max = = = 113.3 kN/m
12 12
− ve wl 2 85 * 4 2
M max = = = 136 kN/m
10 10
concrete 6.32
5.52
1 6.32 + 4 5.52 + 3.6
* 4[( )*2 − ( ) * 1.6] * 25
2 2 2 1.6
2m
water 0.4
1 5.52 + 3.6 ≅3.6 m
+ * 4[( ) * 1.6] * 10 = 295.9 4m
2 2
due to o.w of column → Pcolumn = 1.1 * 295.9 = 325.2 kN
Wind load
P = 1 * 2 * 4 = 8 kN
p 2m
M = 8 * 8 = 64 kN
∴M/column = 64/2 = 32 kN.m
unbraced column
He
λ= , H e = k H o = 1.6 * 7 = 11.2m
t
11.2 * 100
λ= = 22.4 < (λ max = 23)
50
∴ take t = 70 → λ = 16 > 10 (long column)
λ2 t 16 2 * 700
∴δ = = = 89.6 mm
2000 2000
89.6
M add = P.δ = 325.5 * = 29 kN.m
1000
M design = 32 + 29 = 61 kN.m
∴ M u = 1.5 * 61 = 92 kN.m
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
16
12
16
5
2
5
700 mm
6 10/m` 8 10/m`
9 10
6 10 8 10/m`
40 cm 40 cm
3 16 3 16
6 10/m`
6 10/m`
Cross-section of tank
Instructor: eng \ just for help Subject: Water Tanks
:2000-2001 Solved Examples
40
4m
8 10/m` 8 10/m` (U)
7 10/m` 7 10/m` (L)
10/m`(U)
10/m`(L)
10/m`
10/m`
4m
5
5
6
6
4m
Plan