0% found this document useful (0 votes)
40 views

Transhipment Example

The document summarizes the results of using Excel's Solver tool to solve a transhipment optimization problem. The Solver found a solution that satisfied all constraints and minimized total cost to $12,400. It provides details on the optimal values assigned to the decision variables, which represent amounts of wheat transported between suppliers, transfer points, and customers. Constraints ensured supply and demand were balanced across locations.

Uploaded by

RIZLE SOGRADIEL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Transhipment Example

The document summarizes the results of using Excel's Solver tool to solve a transhipment optimization problem. The Solver found a solution that satisfied all constraints and minimized total cost to $12,400. It provides details on the optimal values assigned to the decision variables, which represent amounts of wheat transported between suppliers, transfer points, and customers. Constraints ensured supply and demand were balanced across locations.

Uploaded by

RIZLE SOGRADIEL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Microsoft Excel 16.

0 Answer Report
Worksheet: [Transhipment Example.xlsx]Sheet1
Report Created: 7/1/2020 10:52:57 AM
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 0.016 Seconds.
Iterations: 11 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0.000001, Use Automatic Scaling
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative

Objective Cell (Min)


Cell Name Original Value Final Value
$I$16 TOTAL COST Chicago - 12,400.00

Variable Cells
Cell Name Original Value Final Value Integer
$B$6 Nebraska Kansas City 0 0 Contin
$C$6 Nebraska Omaha 0 0 Contin
$D$6 Nebraska Des Moines 0 300 Contin
$B$7 Colorado Kansas City 0 0 Contin
$C$7 Colorado Omaha 0 300 Contin
$D$7 Colorado Des Moines 0 0 Contin
$B$12 Kansas Chicago 0 0 Contin
$C$12 Kansas St. Loius 0 0 Contin
$D$12 Kansas Cicinnati 0 0 Contin
$B$13 Omaha Chicago 0 0 Contin
$C$13 Omaha St. Loius 0 0 Contin
$D$13 Omaha Cicinnati 0 300 Contin
$B$14 Des Moines Chicago 0 200 Contin
$C$14 Des Moines St. Loius 0 100 Contin
$D$14 Des Moines Cicinnati 0 0 Contin

Constraints
Cell Name Cell Value Formula Status Slack
$B$15 Shipped In Chicago 200 $B$15=$B$16 Binding 0
$C$15 Shipped In St. Loius 100 $C$15=$C$16 Binding 0
$D$15 Shipped In Cicinnati 300 $D$15=$D$16 Binding 0
$B$19 Kansas Chicago 0 $B$19=0 Binding 0
$B$20 Omaha Chicago 0 $B$20=0 Binding 0
$B$21 Des Moines Chicago 0 $B$21=0 Binding 0
$E$6 Nebraska Shipped Out 300 $E$6=$F$6 Binding 0
$E$7 Colorado Shipped Out 300 $E$7=$F$7 Binding 0
Microsoft Excel 16.0 Sensitivity Report
Worksheet: [Transhipment Example.xlsx]Sheet1
Report Created: 7/1/2020 10:52:57 AM

Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$B$6 Nebraska Kansas City 0 5 16 1E+030 5
$C$6 Nebraska Omaha 0 0 10 3 1
$D$6 Nebraska Des Moines 300 0 12 1 3
$B$7 Colorado Kansas City 0 0 15 5 0
$C$7 Colorado Omaha 300 0 14 0 5
$D$7 Colorado Des Moines 0 1 17 1E+030 1
$B$12 Kansas Chicago 0 1 6 1E+030 1
$C$12 Kansas St. Loius 0 2 8 1E+030 2
$D$12 Kansas Cicinnati 0 0 10 1E+030 0
$B$13 Omaha Chicago 0 1 7 1E+030 1
$C$13 Omaha St. Loius 0 4 11 1E+030 4
$D$13 Omaha Cicinnati 300 0 11 0 1E+030
$B$14 Des Moines Chicago 200 0 4 1 1E+030
$C$14 Des Moines St. Loius 100 0 5 2 1E+030
$D$14 Des Moines Cicinnati 0 3 12 1E+030 3

Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$B$15 Shipped In Chicago 200 0 200 0 1E+030
$C$15 Shipped In St. Loius 100 1 100 200 0
$D$15 Shipped In Cicinnati 300 5 300 200 0
$B$19 Kansas Chicago 0 -5 0 200 0
$B$20 Omaha Chicago 0 -6 0 200 0
$B$21 Des Moines Chicago 0 -4 0 200 0
$E$6 Nebraska Shipped Out 300 16 300 0 200
$E$7 Colorado Shipped Out 300 20 300 0 200
TRANSSHIPMENT EXAMPLE

Grain Elevators
Farms Kansas City Omaha Des Moines Shipped Out Supply
Nebraska 0 0 300 300 300
Colorado 0 300 0 300 300
Shipped In 0 300 300

Mills
Grain Elevators Chicago St. Loius Cicinnati Shipped out
Kansas 0 0 0 0
Omaha 0 0 300 300
Des Moines 200 100 0 300
Shipped In 200 100 300
Demand 200 100 300

Transshipment Flow
Kansas 0
Omaha 0
Des Moines 0
COST Grain Elevators
Farms Kansas City Omaha Des Moines
Nebraska 16 10 12
Colorado 15 14 17

Mills
Grain Elevators Chicago St. Loius Cicinnati
Kansas 6 8 10
Omaha 7 11 11
Des Moines 4 5 12

TOTAL COST 12,400.00


Decision Variables
Tons of Wheat to be transported from Nebraska (1) to Kansas City (3) =
Tons of Wheat to be transported from Nebraska (1) to Omaha (4) =
Tons of Wheat to be transported from Nebraska (1) to Des Moines (5) =
Tons of Wheat to be transported from Colorado (2) to Kansas City (3) =
Tons of Wheat to be transported from Colorado (2) to Omaha (4) =
Tons of Wheat to be transported from Colorado (2) to Des Moines (5) =
Tons of Wheat to be transported from Kansas City (3) to Chicago (6) =
Tons of Wheat to be transported from Kansas City (3) to St. Louis (7) =
Tons of Wheat to be transported from Kansas City (3) to Cicinnati (8) =
Tons of Wheat to be transported from Omaha (4) to Chicago (6) =
Tons of Wheat to be transported from Omaha (4) to St. Louis (7) =
Tons of Wheat to be transported from Omaha (4) to Cicinnati (8) =
Tons of Wheat to be transported from Des Moines (5) to Chicago (6) =
Tons of Wheat to be transported from Des Moines (5) to St. Louis (7) =
Tons of Wheat to be transported from Des Moines (5) to Cicinnati (8) =

Objective Function

Min Z = $16 x13 + 10 x14 + 12 x15 + 15 x23 + 14 x24 + 17 x25 + 6x36 + 8x37 + 10x38 + 7x46 + 11x47 + 11x48 + 4x56 + 5x57 +

Constraints
Supply Constraint from Nebraska:
Supply Constraint from Colorado:
Demand Constraint from Chicago:
Demand Constraint from St. Louis:
Demand Constraint from Cicinnati:
Transshipment constraint from Kansas City:
Transshipment constraint from Omaha:
Transshipment constraint from Des Moines:
Non-negativity constraint:

Conversion of constraints at non-standard to standard form:

Transshipment constraint from Kansas City:


Transshipment constraint from Omaha:
Transshipment constraint from Des Moines:
x13
x14
x15
x23
x24
x25
x36
x37
x38
x46
x47
x48
x56
x57
x58

7x46 + 11x47 + 11x48 + 4x56 + 5x57 + 12x58

x13 + x14 + x15 = 300


x23 + x24 + x25 = 300
x36 + x46 + x56 = 200
x37 + x47 + x57 = 100
x38 + x48 + x58 = 300
x13 + x23 = x36 + x37 + x38
x14 + x24 = x46 + x47 + x48
x15 + x25 = x56 + x57 + x58
xij ≥ 0

x13 + x23 - x36 - x37 - x38 = 0


x14 + x24 - x46 - x47 - x48 = 0
x15 + x25 - x56 - x57 - x58 = 0
Microsoft Excel 16.0 Answer Report
Worksheet: [Transhipment Example.xlsx]Sheet5
Report Created: 7/1/2020 11:56:29 AM
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 0.016 Seconds.
Iterations: 14 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0.000001, Use Automatic Scaling
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative

Objective Cell (Min)


Cell Name Original Value Final Value
$B$20 TOTAL DISTANCE Raleigh 0 450

Variable Cells
Cell Name Original Value Final Value Integer
$B$5 A Raleigh 0 0 Binary
$C$5 A Atlanta 0 1 Binary
$D$5 A Durham 0 0 Binary
$E$5 A Clemson 0 0 Binary
$B$6 B Raleigh 0 1 Binary
$C$6 B Atlanta 0 0 Binary
$D$6 B Durham 0 0 Binary
$E$6 B Clemson 0 0 Binary
$B$7 C Raleigh 0 0 Binary
$C$7 C Atlanta 0 0 Binary
$D$7 C Durham 0 1 Binary
$E$7 C Clemson 0 0 Binary
$B$8 D Raleigh 0 0 Binary
$C$8 D Atlanta 0 0 Binary
$D$8 D Durham 0 0 Binary
$E$8 D Clemson 0 1 Binary

Constraints
Cell Name Cell Value Formula Status Slack
$B$9 Total Assigned Raleigh 1 $B$9=$B$10 Binding 0
$C$9 Total Assigned Atlanta 1 $C$9=$C$10 Binding 0
$D$9 Total Assigned Durham 1 $D$9=$D$10 Binding 0
$E$9 Total Assigned Clemson 1 $E$9=$E$10 Binding 0
$F$5 A Total Assigned 1 $F$5=$G$5 Binding 0
$F$6 B Total Assigned 1 $F$6=$G$6 Binding 0
$F$7 C Total Assigned 1 $F$7=$G$7 Binding 0
$F$8 D Total Assigned 1 $F$8=$G$8 Binding 0
$B$5:$E$8=Binary
ASSIGNMENT MODEL EXAMPLE

GAME SITES
OFFICIALS Raleigh Atlanta Durham Clemson Total Assigned Supply
A 0 1 0 0 1 1
B 1 0 0 0 1 1
C 0 0 1 0 1 1
D 0 0 0 1 1 1
Total Assigned 1 1 1 1
Demanded 1 1 1 1

GAME SITES
OFFICIALS Raleigh Atlanta Durham Clemson
A 210 90 180 160
B 100 70 130 200
C 175 105 140 170
D 85 65 105 120

TOTAL DISTANCE 450