METHOD OF STATEMENT
LOCATION OF WORK
SPAR-KHALIFA CITY
NAME OF SUPERVISOR
NUMBER OF PERSONS
IN-CHARGE
TOOLS USED
1) Electrical Tool Kit
2) Hand Tool Kit (Screw Drivers, Multimeter, Pipe Wrench, Wire Cutter, Brushes, Hammer)
4) Scaffolding / ladders
EQUIPMENT TO BE USED
CRANE
Page 1 of 4
EXCAVATION
CONFINED SPACE
RISER SHAFTS
DESCRIPTION OF WORK
Fire Alarm System
Before Testing Fire Alarm Simulation Test Inform to the Facilities Team. To avoid panic situation
inside the mall area
Visually inspect the Fire Alarm All Devices.
Conduct the fire alarm test with authorized / approved person.
Using proper smoke / heat kit for testing the fire alarm devices.
Pull the manual call point to check the alarm system.
Conform the interfacing third party connection from the fire alarm system.
Testing the Existing third-party connection with fire alarm system
After completion of testing clean properly testing devices to avoid false alarm system.
Make a report for the fire alarm testing and get the signature form the authorized person from the
facilities management