BSNL Tendernotice 1
BSNL Tendernotice 1
BSNL Tendernotice 1
From: To:
AGM (TX-PLG),
O/o CGMT, BSNL
Telangana Circle
Sub: Tender document for Outsourcing of comprehensive maintenance of OFC Network routes in
Peddapalli zone under Warangal Business Area.
Please find enclosed herewith the tender document in respect of above-mentioned tender which
contains the following.
Section No. Item Page No.
If interested, kindly submit your bid offers online on or before date & time specified in Clause 8 of
detailed NIT.
1. On behalf of CGMT, BSNL, Telangana Telecom Circle Digitally Sealed Tenders are invited
for Outsourcing of comprehensive maintenance of OFC (Optical Fiber Cable) Network routes under
Peddapalli zone in Warangal Business Area.
Note :
1) Each bidder can participate in any number of zones by paying the tender document cost and
EMD separately for each zone, but maximum 2 (Two) zones will be allotted to the bidder in BA.
However, the competent authority reserves the right to allocate more than two zones in BA as
per the field requirement in the event of single bidder or in the exigencies of service.
2) The total quantity stated above is estimated and BSNL reserves the right to vary the above
mentioned quantity to the extent up to ±50% of specified quantity / amount during the contract
period without any change in unit price of respective routes and other terms & conditions.
2. A separate bid form along with the price bid (as per Section 9 Part A & B) should be filled for
each zone separately if the bidder wishes to participate for more than one zone and each zone shall
be treated as a separate tender.
4. The bidders downloading the tender document shall pay an amount of Rs.1,180/- (including
18% GST) through NEFT / RTGS / or any other online payment facility towards cost of the Bid
Document / Tender Fee for each zone separately in the following Bank Account :
If the Cost of the Bid Document / Tender Fee is not paid, then the bid shall be left archived /
unopened / rejected. However, the tender fee / cost of the bid document is exempted to the MSE
bidders subject to -
4.1. The MSE bidders registered with the designated MSME bodies like National Small Scale
5. Availability of Tender Document on the e-tender portal for bid submission: The tender
document shall be available for downloading from BSNL website www.telangana.bsnl.co.in from
18:00 Hrs of 17.10.2022 onwards. The same tender document uploaded on BSNL website shall be
made available on e-tender portal (https://etenders.gov.in/eprocure/app) from 18:00 Hrs of
17.10.2022 onwards for start on online bid submission.
i. Physical copy of the tender document would not be available for sale.
ii. The Tender document shall not be available for download from e-tender portal on its
submission / closing date.
7. Bid Security / EMD: The bidder shall furnish the bid EMD equivalent to 2% of the tender
estimated cost in one of the following ways:
7.1. Demand Draft/ Banker’s cheque drawn in favour of “AO Cash BSNL, TSCO Collection
8. Date & Time of Submission of Tender bids: on or before 18.00 Hrs of 07.11.2022 (tender
closing date).
8.1. In case the date of submission (opening) of bid is declared to be a holiday, the date of
submission (opening) of bid will get shifted automatically to next working day at the same
scheduled time.
8.2. Any change in bid opening date due to any other unavoidable reason will be published in E-
tender portal.
10. Place of opening of Tender bids: The tenders shall be opened through ‘Online Tender
Opening Event’. BSNL’s Tender Opening Officers as well as authorized representatives of bidders
can attend the online Tender Opening Event (TOE) from the comfort of their offices. Kindly refer
Section-4 Part C of Tender document for further instructions.
12. CGMT, BSNL, Telangana Circle reserves the right to accept or reject any or all the tender
bids without assigning any reason. He is not bound to accept the lowest bid.
13. The bidder shall furnish a declaration, as per Section-6 Part A, in his tender bid that no
addition / deletion / corrections have been made in the terms & conditions of the downloaded tender
document for which their bid is being submitted and these are identical to the tender document
appearing on the website.
13.1. In case of any addition / alteration / omission in the tender document, the tender bid shall be
treated as non-responsive and shall be rejected summarily.
13.2. All documents submitted in the bid offer should be preferably in English / Hindi / State’s
official language. In case the certificate viz. experience, registration etc. is issued in any
other language other than English / Hindi / State’s official language, the bidder shall attach a
translation of the same in English / Hindi / State’s official language, duly attested by the
bidder & the translator to be true copy in addition to the relevant certificate.
13.3. All the computer generated documents should be duly signed/ attested by the bidder/ bidder
organization.
14. The queries in respect of this bid document, if any, can be submitted through Email latest
upto 24/10/2022 (7 days from issue of NIT).
BSNL Contact -1
Name RAJANIKAR. A
Telephone Number 94400 00411
Email [email protected]
AGM (TX-PLG)
For and on behalf of Chief General Manager Telecom
BSNL, Telangana Telecom Circle, Hyderabad.
I, hereby, further certify that our Company is not from such a country which shares a land border
with India and in light of conditions & restrictions imposed vide cited OMs, we fulfil all the
requirements in this regard to become eligible to be considered in the subject Tender Enquiry by
BSNL.
Signature
Designation in Company
1. Type of tender – Single stage submission & two stage opening : Digitally signed online
bids are to be submitted in Single Stage Bidding and two stage opening e-tendering process using
two electronic envelopes from the eligible bidders by the time and date specified in the Bid
Document.
Note: The bids will be evaluated techno-commercially first and thereafter financial bids of
techno-commercially compliant bidders only, shall be opened.
2. Bid validity period - The bid remains valid for 120 days from the tender opening date
3. The electronic envelopes shall contain documents satisfying the eligibility / Technical &
commercial conditions in first envelope called Techno-commercial envelope and second envelope
called as Financial Envelope containing financial bid / quote.
3.1. Techno-commercial envelope shall contain
1 Scanned copy of EMD.
2 Scanned copy of payment of tender document i.e. tender fee.
3 Certificate(s) showing fulfilment of the eligibility criteria(s) stated in Clause 6 of the
detailed NIT.
4 Power of Attorney (PoA) & authorization for executing the power of Attorney in
accordance with Clause 13.3 of Section 4 Part A (not required in case of proprietary /
partnership firm if the proprietor / partnership himself signs the documents) and board
resolution in favor of authorized signatory.
5 Copy of Articles and Memorandum of Association or Partnership deed or
proprietorship deed as the case may be.
6 Details of the firm along with List of Directors on the Board of the Company, list of
partners, as applicable.
7 Attestation of the signature of the authorized signatory, issuing PoA ,by Bank.
8 Bidder’s Profile duly filled & signed as per Section-8.
9 Indemnity bond declaration for indemnifying BSNL against any non-compliance by
bidder towards all applicable statutory requirements, if work is awarded, as per
Annexure-1.
10 Letter of authorization for attending bid opening event as per Section -7 Part (C).
11 No Near-Relationship Certificate duly filled & signed as per Section-6 Part B.
12 Undertaking & declaration duly filled & signed as per Section-6 Part A
13 Tender / Bid form-Section 9 Part A.
14 Certified copy of the lease deed along with the attested copy of ownership documents,
in case the bidder is not owner of JCB machine
15 Checklist of the documents submitted as per Annexure-2.
Sir,
I, M/s________________________________________________ submitted the bid for the
following Zones of BSNL, TELANGANA Circle Tender No. ……………………………………………..
Dated at Hyderabad the 17-10-2022 above tender.
Yours Sincerely,
(Signature of Bidder)
1. E-Tenders are invited from reputed, qualified, experienced and financially strong Firms /
Agencies for comprehensive maintenance of OFC network of 2F / 4F / 6F / 12F / 24F / 48F / 96F /
288F routes & other Works as defined in the Scope of Work in the tender at appropriate places. The
OF cable is generally laid along the side of the Road (National Highways, State Highways, Municipal
Corporation, Rural roads) to connect Telecom Installations and various network elements in BSNL
and the Overhead cables are erected using the electrical poles, BSNL poles etc.
2. The Route Index Drawings (RID) will be provided to the contractor by BSNL, wherever
available, within 1 week of signing the agreement. No claim of the contractor will be entertained
on account of the inaccuracy of the RID. The locations of the cable as reflected in the drawings /
details are indicative only. In view of road widening, some portion of OFC has come under tar
surface of the road and at some places OF cable has been drawn on overhead temporarily
3. At certain sections multiple OFC cables have been laid on the same trench / other side of
the road. The bidder is required to visit the sites and ascertain the geographical conditions and its
latest status.
3.1. Multiple cables in the same trench in the same route shall be treated as “Single Route”. For
example, in a route of 10 RKM, if multiple OF cables are laid, then the route length shall be
10 RKM only.
3.2. Cables available in both sides of the road will be treated as 1.5 times of the Route Length.
For example, in a route of 10 RKM, if multiple OF cables are laid on both sides of the road,
then the route length shall be 15 RKM.
4. Route Length shall be in physical road length and not OFC length. The exact route
length shall be ascertained by the Contractor after conducting a Joint inspection / Survey along with
the designated officer of BSNL. The zone wise survey report shall be duly signed and submitted by
the designated authorities from both the parties within 10 days from the date of LOI.
6.6. Documentation.
6.6.1. The contractor shall prepare As-Built Drawings for each OFC route (both digital and
paper) and updated drawing shall be submitted on monthly basis. The updation of
ABD has to be done on regular basis (list is indicative and not exhaustive) –
6.6.1.1. After attending the fault, the joint particulars with offset along with route and
joint indicators
6.6.1.2. Change in the OF cable route due to any of the activity carried out by the
contractor
6.6.1.3. Addition of new routes / deletion of routes
6.6.1.4. Conversion from OH OFC to UG OFC and vice versa
6.6.2. Monthly detailed report on activities carried out by the contractor duly indicating the
faults occurred, cause of fault, restoration details, etc.,
6.6.3. Weekly Spare Fiber Testing report (with OTDR) including splice loss details
6.6.4. Weekly Optical Power Level Reports measured using Power Meter
6.6.5. Weekly stock position report of the inventory issued by BSNL along with utilisation
particulars and request for replenishing the stock
6.6.6. Quarterly live fiber testing reports with OTDR and Optical Power Meter
6.6.7. Daily route patrolling report
7. ROLE OF BSNL
7.1. BSNL shall be represented by the following officers for day-to-day interaction with the
contractor.
7.1.1. JTO / SDE / DE: Person responsible for a portion of the route / routes.
8. ROLE OF CONTRACTOR
8.1. CONTRACTOR’S OFFICE :
8.1.1. The Contractor’s office shall be equipped with the following facilities within 7 days
from the issue of LoI:
8.1.1.1. Landline, Computer with net connectivity, Smart Mobile
8.1.1.2. GPS co-ordinates of all offices and locations of the teams
8.1.2. The contractor’s office should be located at BA headquarters as directed by PGM /
GMTD / DGM / DE of Concerned BA. However for operational convenience it is
preferable that the contractor may have multiple offices in routes as per the area
defined in tender.
8.1.3. After award of the contract, the Contractor has to furnish within 7 days full
information about their staff at various locations.
b) Overhead OFC :
Sl. 2nd and
Parameter 1st year
No. subsequent years
Number of OFC cuts per 100
1 5 2
RKM per month
0.01 to 0.02 db. In no case more than
2 Splice Loss per fiber
0.05 db
< 2 Hours from the time of reporting.
Mean Time To Repair
3 If fault occurs between 22:00 Hrs to
(MTTR)
06:00 Hrs, then < 4 Hours
4 Fiber Loss* 0.3 db per KM
Within 15 minutes from the time of
5 Response Time
reporting the fault
* If 2 or more fibres are working in a route, highest loss among these fibres is the
route loss.
8.6.2. Other Routes : These are the OF routes other than Most Critical routes and the SLA
parameters are –
8.6.2.1. Underground OFC
Sl. 2nd and
Parameter 1st year
No. subsequent years
Number of OFC cuts per 100
1 3 2
RKM per month
0.01 to 0.02 db. In no case more than
2 Splice Loss per fiber
0.05 db
< 6 Hours from the time of reporting
Mean Time To Repair
3 If fault occurs between 22:00 Hrs to
(MTTR)
06:00 Hrs, then < 8 Hours
4 Fiber Loss* 0.3 db per KM
Within 15 minutes from the time of
5 Response Time
reporting the fault
* If 2 or more fibres are working in a route, highest loss among these fibres is the
route loss.
9. PENALTIES :
9.1. The main objective of calling the tender is for maintenance of the OF Cable with desired SLA
parameters. However, to act as a deterrent, the following penalties shall be levied on
Contractor for not maintaining the SLA parameters:
9.1.1. Most Critical Routes :
4 Fiber Loss Rs.600/- per route for exceeding the permitted levels
Rs.1,000/- per day per route in the absence of route
5 Route Patrolling
patrol
A penalty equivalent to 2% of monthly invoice value
6 FRT
for each occasion or day that FRT is not reported.
1. DEFINITIONS
1.1. “The Purchaser” means the Bharat Sanchar Nigam Ltd. (BSNL), Telangana Telecom Circle,
and Concerned BA / OA.
1.2. "The Bidder" means the Company or individual or firm who participates in this tender and
submits its bid.
1.3. "The Contractor" means the individual or firm awarded the contract.
1.4. "The Services" means providing maintenance services for OF Cable Routes which the
Contractor is required to supply to the Purchaser under the contract
1.5. "The Advance Work Order" or “Letter of Intent” means the intention of Purchaser to place
the Work Order on the bidder.
1.6. "The Work Order" means the order placed by the Purchaser on the Contractor signed by
the Purchaser including all attachments and appendices thereto and all documents
incorporated by reference therein. The Work order shall be deemed as "Contract" appearing
in the document.
1.7. "The Contract Price" means the price payable to the Contractor under the Work order for
the full and proper performance of its contractual obligations.
1.8. "Telecom Service Provider" means any Telecom operator in India, who is licensed by the
Department of Telecommunications (DOT), Government of India to provide telecom
services to the general public or to the other DOT licensed Telecom operators. "Telecom
Service Provider" also refers to any Telecom operator in other countries providing telecom
services to general public of that country or to other telecom operators of the same country.
1.9. “Successful Bidder(s)” means the bidder(s) to whom work in this tender is awarded.
1.10. “SSA” means Secondary Switching Areas defined by BSNL (generally comprising of one or
more revenue districts).
1.11. “OA” means Operational Area comprising of one SSA
1.12. “BA” means Business Area comprising of one or more OAs
2. ELIGIBILITY CONDITIONS:
2.1. Kindly refer to Clause 6 of Section-1 i.e. detailed NIT.
2.2. Bidder is expected to obtain clearance from Reserve Bank of India, wherever applicable.
2.3. The Bidder must furnish the documentary evidence to meet the eligibility conditions laid
down in general, technical, and financial qualification criteria.
3. COST OF BIDDING
3.1. The bidder shall bear all costs associated with the preparation and submission of the bid.
3.2. BSNL will, in no case, be responsible or liable for these costs, regardless of the conduct or
outcome of the bidding process.
4. DOCUMENTS REQUIRED
4.1. The detailed list of services required to be provided by the bidder, bidding procedures and
contract terms and conditions are prescribed in the Bid Documents. The contents of the Bid
documents are specified in the covering letter.
4.2. The Bidder is expected to examine all instructions, forms, terms and specifications in the Bid
Documents and clarifications/ amendments/ addenda, if any. Failure to furnish all
information required as per the Bid Documents or submission of the bids not substantially
responsive to the Bid Documents in every respect will be at the bidder's risk and may result
in rejection of the bid.
14.5. If both the envelopes are not submitted as required at clause 14.3 and 14.4 of this
section, the bid shall be rejected.
25. BSNL’s RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
25.1. The Purchaser reserves the right to accept or reject any bid, and to annul the bidding
process and reject all bids, at any time prior to award of contract without assigning any
reason whatsoever and without thereby incurring any liability to the affected bidder or
bidders on the grounds of purchaser’s action.
S.
Defaults of the bidder / contractor Action to be taken
No.
A B C
Submitting fake / forged
a) Bank Instruments with the bid to i). Rejection of tender bid of respective
meet terms & condition of tender in Vendor.
respect of tender fee and/ or EMD. ii). Banning of business for 3 years which
implies barring further dealing with the
b) Certificate for claiming exemption in bidder for procurement of Goods &
respect of tender fee and/ or EMD; Services including participation in future
tenders invited by BSNL for 3 years from
1(a) date of issue of banning order.
and detection of default at any stage iii). Termination/ Short Closure of WO, if
from receipt of bids till award of AWO / issued. This implies non-acceptance of
issue of WO. further work & services except to make
the already received complete work in
hand.
Note 1:- However, in this case the performance guarantee if alright will not be forfeited
Note 2:- Payment for already received completed work shall be made as per terms & conditions
of WO.
Submitting fake / forged documents towards meeting eligibility criteria such as
experience capability, supply proof, registration with GST, Income Tax departments etc
and as supporting documents towards other terms & conditions with the bid to meet
terms & condition of tender :
i). If detection of default is prior to i). Rejection of Bid &
award of AWO ii). Forfeiture of EMD.
1(b) ii). If detection of default after issue of i). Cancellation of AWO,
AWO but before receipt of ii). Rejection of Bid &
Performance Guarantee / SD iii). Forfeiture of EMD.
(DD,BG etc.)
iii). If detection of default after receipt i). Cancellation of AWO
of PG/ SD (DD,BG etc.) . ii). Rejection of Bid &
iii). Forfeiture of PG/ SD.
However, on realization of PG/ SD amount,
EMD, if not already released, shall be
returned.
iv). If detection of default after issue of i). Termination / Short Closure of WO and
WO Cancellation of AWO
ii). Rejection of Bid &
iii). Forfeiture of PG/ SD.
However, on realization of PG/ SD amount,
EMD, if not released, shall be returned.
Note 3:- However, settle bills for the services received if pending items do not affect working or
use of supplied items.
Note 4:- No further supplies are to be accepted except that required to make the already
supplied items work.
The Special Instructions to Bidders shall supplement the 'Instructions to Bidders' and in case of any
conflict with those in Section-4 Part A i.e. GENERAL INSTRUCTIONS TO BIDDERS (GIB), the
provisions herein shall prevail.
1. Evaluation
1.1. The evaluation process comprises the following three (3) steps:
1.1.1. Step I: Fulfillment of requirements of Eligibility criteria, EMD and tender fee.
1.1.2. Step II: Evaluation of Bidder’s fulfilment of Qualification Requirements as per Clause
6 Section 1 DNIT
1.1.3. Step III: Selection of Successful Bidder
2. REGISTRATION
2.1. Bidders are required to enroll on the e-Procurement module of the Central Public
Procurement Portal (URL: https://etenders.gov.in/eprocure/app ) by clicking on the link
“Online bidder Enrollment” on the CPP Portal which is free of charge.
2.2. “Declaration of UAM (Udyog Adhar Memorandum Number) by MSE bidders on CPPP is
mandatory. If the MSME bidders who fail to submit UAM number on CPPP portal, shall not
be able to avail the benefits available to MSEs as contained in Public Procurement Policy
for MSEs order, 2012 issued by MSME”.
2.3. As part of the enrolment process, the bidders will be required to choose a unique username
and assign a password for their accounts.
2.4. Bidders are advised to register their valid email address and mobile numbers as part of the
registration process. These would be used for any communication from the CPP Portal.
2.5. Upon enrolment, the bidders will be required to register their valid Digital Signature
Certificate (Class III Certificates with signing key usage) issued by any Certifying Authority
recognized by CCA India (e.g. Sify / nCode / eMudhra etc.), with their profile.
2.6. Only one valid DSC should be registered by a bidder. Please note that the bidders are
responsible to ensure that they do not lend their DSC’s to others which may lead to misuse.
2.7. Bidder then logs in to the site through the secured log-in by entering their user ID / password
and the password of the DSC / e-Token.
4. PREPARATION OF BIDS
4.1. Bidder should take into account any corrigendum published on the tender document before
submitting their bids.
Signature of the bidder Page 42 of 71
4.2. Please go through the tender advertisement and the tender document carefully to
understand the documents required to be submitted as part of the bid. Please note the
number of covers in which the bid documents have to be submitted, the number of
documents - including the names and content of each of the document that need to be
submitted. Any deviations from these may lead to rejection of the bid.
4.3. Bidder, in advance, should get ready the bid documents to be submitted as indicated in the
tender document / schedule and generally, they can be in PDF / XLS / RAR / DWF/JPG
formats. Bid documents may be scanned with 100 dpi with black and white option which
helps in reducing size of the scanned document.
4.4. To avoid the time and effort required in uploading the same set of standard documents
which are required to be submitted as a part of every bid, a provision of uploading such
standard documents (e.g. PAN card copy, annual reports, auditor certificates etc.) has been
provided to the bidders. Bidders can use “My Space” or ‘’Other Important Documents’’ area
available to them to upload such documents. These documents may be directly submitted
from the “My Space” area while submitting a bid, and need not be uploaded again and
again. This will lead to a reduction in the time required for bid submission process.
Note: My Documents space is only a repository given to the Bidders to ease the
uploading process. If Bidder has uploaded his Documents in My Documents space,
this does not automatically ensure these Documents being part of Technical Bid.
5. SUBMISSION OF BIDS
5.1. Bidder should log into the site well in advance for bid submission so that they can upload the
bid in time i.e. on or before the bid submission time. Bidder will be responsible for any delay
due to other issues.
5.2. The bidder has upload the bid document either digitally signed bid documents or physically
signed on all pages of bid document one by one as indicated in the tender document.
5.3. Bidder has to select the payment option as “offline” to pay the tender fee / EMD as
applicable and enter details of the instrument.
5.4. Bidder should prepare the EMD as per the instructions specified in the tender document.
The original should be posted/couriered/given in person to the concerned official, latest by
the last date of bid submission or as specified in the tender documents. The details of the
DD/any other accepted instrument, physically sent, should tally with the details available in
the scanned copy and the data entered during bid submission time. Otherwise the uploaded
bid will be rejected.
5.5. Bidders are requested to note that they should necessarily submit their financial bids in the
format provided and no other format is acceptable. If the price bid has been given as a
standard BoQ format with the tender document, then the same is to be downloaded and to
be filled by all the bidders. Bidders are required to download the BoQ file, open it and
complete the white coloured (unprotected) cells with their respective financial quotes and
other details (such as name of the bidder). No other cells should be changed. Once the
details have been completed, the bidder should save it and submit it online, without
changing the filename. If the BoQ file is found to be modified by the bidder, the bid will be
rejected.
5.6. The server time (which is displayed on the bidders’ dashboard) will be considered as the
standard time for referencing the deadlines for submission of the bids by the bidders,
opening of bids etc. The bidders should follow this time during bid submission.
5.7. All the documents being submitted by the bidders would be encrypted using PKI encryption
techniques to ensure the secrecy of the data. The data entered cannot be viewed by
unauthorized persons until the time of bid opening. The confidentiality of the bids is
maintained using the secured Socket Layer 128 bit encryption technology. Data storage
encryption of sensitive fields is done. Any bid document that is uploaded to the server is
subjected to symmetric encryption using a system generated symmetric key. Further this
6. ASSISTANCE TO BIDDERS
6.1. Any queries relating to the tender document and the terms and conditions contained therein
should be addressed to the Tender Inviting Authority for a tender or the relevant contact
person indicated in the tender.
6.2. Any queries relating to the process of online bid submission or queries relating to CPP Portal
in general may be directed to the 24x7 CPP Portal Helpdesk.
6.3. For any technical related queries please call at 24 x 7 Help Desk Number
0120-4001 002
0120-4001 005
0120-6277 787
6.4. E-mail
6.4.1. Technical - [email protected]
6.4.2. Policy Related - [email protected]
1. APPLICATION
1.1. The general condition shall apply in contracts made by the purchaser for the procurement of
goods/ services.
2. STANDARDS
2.1. The services under this contract shall conform to the standards prescribed in section-3
3. PATENT RIGHTS
3.1. The supplier shall indemnify the purchaser against all third-party claims of infringement of
patent, trademark or industrial design rights arising from use of the goods or any part
thereof in Indian Telecom Network.
4. PERFORMANCE SECURITY
4.1. All suppliers (including MSEs who are registered with the designated MSME bodies, like
National Small Scale Industries Corporation etc.) shall furnish performance security to the
purchaser for an amount equal to 5% of the value of Advance Work Order / LoI within 14
days from the date of issue of Advance Purchase Order by the Purchaser.
4.2. The proceeds of the performance security shall be payable to the Purchaser as
compensation for any loss resulting from the supplier's failure to complete its obligations
under the contract.
4.3. The performance security Bond shall be in the form of either FD/DD in favour of “AO Cash
BSNL, TSCO Collection Account O/o CGMT, BSNL, TS Circle” or in form of Bank
Guarantee issued by a scheduled Bank in India with a validity period of minimum 18 months
and in the proforma provided in 'Section-7 Part B’ of this Bid Document. For extension of
contract beyond 1 year, PBG shall have to be renewed accordingly.
4.4. The performance security Bond will be discharged by the Purchaser after completion of the
supplier's performance obligations including any warranty obligations under the contract.
4.5. The performance security deposit with BSNL will be considered for adjustment against
penalties, any other statutory levies and any loss to BSNL properties, if any reported, at the
time of final conclusion of the contract and final settlement of account.
4.6. In case it is found that a bidder has submitted a fake/ forged bank instrument towards
performance security deposit (say PBG), then, actions as per clause 1 (a) of Appendix -1 to
Section 4 Part-A shall be applicable.
8. FORCE MAJEURE
8.1. If, at any time, during the continuance of this contract, the performance in whole or in part by
either party of any obligation under this contract is prevented or delayed by reasons of any
war or hostility, acts of the public enemy, civil commotion, sabotage, fires, floods,
explosions, epidemics, quarantine restrictions, strikes, lockouts or act of God (hereinafter
referred to as events) provided notice of happenings of any such eventuality is given by
either party to the other within 21 days from the date of occurrence thereof, neither party
shall by reason of such event be entitled to terminate this contract nor shall either party
have any claim for damages against other in respect of such non-performance or delay in
performance, and deliveries under the contract shall be resumed as soon as practicable
after such an event come to an end or cease to exist, and the decision of the Purchaser as
to whether the deliveries have been so resumed or not shall be final and conclusive.
8.2. Further that if the performance in whole or part of any obligation under this contract is
prevented or delayed by reasons of any such event for a period exceeding 60 days, either
party may, at its option, terminate the contract.
8.3. Provided, also that if the contract is terminated under this clause, the Purchaser shall be at
liberty to take over from the Supplier at a price to be fixed by the purchaser, which shall be
final, all unused, undamaged and acceptable materials, bought out components and stores
in course of manufacture which may be in possession of the Supplier at the time of such
termination or such portion thereof as the purchaser may deem fit, except such materials,
bought out components and stores as the Supplier may with the concurrence of the
purchaser elect to retain.
11. ARBITRATION
11.1. Except as otherwise provided elsewhere in the contract, if any dispute, difference, question
or disagreement arises between the parties hereto or their respective representatives or
assignees, in connection with construction, meaning, operation, effect, interpretation of the
Signature of the bidder Page 46 of 71
contract or breach there of which parties unable to settle mutually, the same shall be
referred to Arbitration as provided here under.
11.2. A part wishing to commence arbitration proceeding shall invoke Arbitration clause by giving
60 days notice to the designated officer of the other party.
11.3. The notice invoking arbitration shall specify all the points of disputes with details of the
amount claimed to be referred to arbitration at the time of invocation of arbitration and not
thereafter, If the claim is in foreign currency, the claimant shall indicate its value in Indian
Rupee for the purpose of constitution of the arbitral tribunal.
11.4. The number of the arbitrators and the appointing authority will be as under :
Claim amount
(excluding claim for
Number of arbitrator Appointing Authority
counter claim, if
any)
BSNL
Sole Arbitrator to be (Note: BSNL will forward a list containing
Above Rs. 5 Lakhs
appointed from a panel names of three empanelled arbitrators to the
to Rs.5 Crores
of arbitrators of BSNL other party for selecting one from the list who
will be appointed as sole arbitrator by BSNL)
One arbitrator by each party and the 3rd
Above Rs.5 Crores 3 Arbitrators arbitrator, who shall be the presiding
arbitrator, by the two arbitrators.
11.5. Neither party shall appoint its serving employee as arbitrator.
11.6. If any of the Arbitrators so appointed dies, resigns, becomes incapacitated or withdraws for
any reason from the proceedings, it shall be lawful for the concerned party / arbitrators to
appoint another person in his place in the same manner as aforesaid. Such person shall
proceed with the reference from the stage where his predecessor had left it both parties
consent for the same; otherwise he shall proceed de novo.
11.7. Parties agree that neither party shall be entitled for any pre-reference or pendente lite
interest on its claims. Parties agree that any claim for such interest made by any party shall
be avoided.
11.8. Unless otherwise decided by the parties, Fast Track procedure as prescribed in Section 29
B of the Arbitration Conciliation Act, 1996 for resolution of all disputes shall be followed,
where the claim amount is up to Rs. 5 Crores.
The Special (Commercial) Conditions of Contract (SCC) shall supplement General (Commercial)
Conditions of Contract (GCC)) as contained in Section 5 Part A and wherever there is a conflict, the
provisions herein shall prevail over those in Section 5 Part A i.e. General (Commercial) Conditions of
Contract (GCC).
1. The successful tenderer / contractor shall submit an Indemnity bond declaration, as per
Annexure-1, for indemnifying BSNL against any non-compliance by bidder to any of the applicable
statutory requirements, if the work is awarded to them.
2. Safety of Labour and BSNL property: The successful tenderer / contractor shall be
solely responsible for payment and compensation under WC Act 1923 as in force from time to time
applicable in the event of accident causing injury/death to his workers and BSNL shall not be
responsible in any manner.
2.1. The contractor shall obtain / purchase all required insurances and make all safety
arrangements required for the laborer engaged by him at his own cost. All consequences
due to negligence or due to lapse of security / safety or otherwise shall remain with the
contractor. BSNL shall not be responsible for any mishap, injury, accident or death of the
contractor’s staff directly or indirectly. All liabilities arising out of accident or death while on
duty shall be borne by the contractor. No claims in this regard shall be entertained /
accepted by the BSNL.
2.2. The contractor shall take all precautions to avoid all accidents by exhibiting necessary
caution boards / flags and providing barriers etc. He shall be responsible for all damages
and accidents caused due to negligence on his part. No hindrance shall be caused to traffic
during the execution of work. Nothing extra shall be paid on this account.
2.3. Contractor shall be fully responsible for any damages caused to BSNL / Government /
private /other operators property / Injuries public at large/ loss of life by him or his laborer
in carrying out the work and the same shall be rectified / compensated by the contractor at
his own cost.
2.4. It will be sole responsibility of the contractor that the men deployed for the purpose of
maintenance of the external plant with BSNL are to be trained to avoid any mishap, directly
or indirectly.
2.5. On account of security considerations or on account of convenience of office staff, there
could be some restrictions on the working hours or movement of vehicles for transportation
of materials. The contractor shall be bound of follow all such restrictions and just the
program for execution accordingly.
2.6. The contractor should carry out the work to the satisfaction of BSNL officer in charge and in
the event of his failure the tendering authority reserves the right to offer the contract to any
other tenderer or any other agency in case of unsatisfactory work at the cost of the
contractor and payment will be settled on prorate Basis.
2.7. The contractor should engage workers with proven integrity to carry out the contract work.
He/His worker should vacate premises after the completion of contract work.
2.8. The contractor shall be solely responsible for payment and compensation under WC act
1923 as in force from time to time applicable in the event of accident causing injury/death to
his workers and PGM OA/BA shall not involve in any manner.
2.9. No documents, towards compliance of aforesaid requirements, will be required to be
submitted by bidder to BSNL paying authority for settlement of their payment
SECTION-6 PART A
a) Certified that:
1. I/ We ……………………………………. have read, understood and agree with all the terms
and conditions included in the tender documents & offer to execute the work as per tender terms &
conditions (without any deviation) and at the rates quoted by us in the tender form.
2. If I/ We fail to enter into the agreement & commence the work in time, the EMD/ Performance
linked Security Deposit / PBG deposited by us will stand forfeited to the BSNL.
1. All the information, Documents, Photo copies of the Documents / Certificates enclosed along
with the Tender/Bid offer are correct.
2. In case of any correction / addition / alteration / omission of the terms & conditions in the
tender document, our tender / bid shall be treated as non-responsive and shall be rejected
summarily.
3. If anything is found false and/or incorrect and/or reveals any suppression of fact at any time,
BSNL reserves the right to debar our tender offer / cancel the LOI / Purchase / work order, if issued
and forfeit the EMD/ Performance linked Security Deposit / PBG / Bill amount pending with BSNL. In
addition, BSNL may debar the contractor from participation in its future tenders.
If the bidder has near relatives in the BSNL Unit where tender is being submitted, then they shall
submit following details of those officers:
Name of
Employed in Mobile
S.No the near Designation Address
office of No.
relative
I/We …………………….. declare and undertake for 100% clause by clause compliance and no-
deviation of all clauses of tender document.
PROFORMAS
2.1. We the Bank do hereby undertake to pay the amounts due and payable under this
guarantee without any demur, merely on a demand from the BSNL stating that the amount
claimed is due by way of loss or damage caused to or would be caused to or suffered by
the BSNL by reason of breach by the said bidder(s) of any of terms or conditions contained
in the said Agreement or by reason of the bidder (s) failure to perform the said Agreement.
Any such demand made on the bank shall be conclusive as regards the amount due and
payable by the Bank under this guarantee where the decision of the BSNL in these counts
shall be final and binding on the bank. However, our liability under this guarantee shall be
restricted to an amount not exceeding the “B. G. Amount”.
2.2. We undertake to pay to the BSNL any money so demanded notwithstanding any dispute or
disputes raised by the bidder(s) in any suit or proceeding before any court or tribunal
relating thereto our liability under this present being absolute and unequivocal. The
Payment so made by us under this bond shall be valid discharge of our liability for payment
there under and the bidder(s) shall have no claim against us for making such payment.
2.3. We the Bank further agree that the guarantee herein contained shall remain in full force and
effect during the period that would be taken for the performance of the said agreement and
that it shall continue to be enforceable till all the dues of the BSNL under or by virtue of the
said Agreement have been fully paid and its claims satisfied or discharged or till BSNL
Certifies that the terms and conditions of the said Agreement have been fully and properly
carried out by the said bidder(s) and accordingly discharge this guarantee. Unless a
demand or claim under this guarantee is made on us in writing or before the expiry of
Validity date from the date hereof, we shall be discharged from all liability under this
guarantee thereafter.
2.4. We the Bank further agree with the BSNL that the BSNL shall have the fullest liberty without
our consent and without affecting in any manner our obligations hereunder to vary any of
the terms and conditions of the said Agreement or to extend time of performance by the
said bidder(s) from time to time or to postpone for any time or from time to time any of the
powers exercisable by the BSNL against the said bidder(s) and to forbear or enforce any of
the terms and conditions relating to the said agreement and we shall not be relieved from
our liability by reason of any such variation, or extension being granted to the said Bidder(s)
Place: ……………………………
I/ We Mr. /Ms. …………………………………….. have submitted our bid for the tender no.
………………………….……… in respect of ……………………
………………………………………………………….. (Item of work) which is due to open on
…………………. (date).
…………………………………….
Signature of the Representative
………………………………… Signature of Bidder/ Officer authorized to sign
on behalf of the Bidder
Name of the Representative
…………………………………….
Note:
6. Name of the person authorized to enter into and execute contract / agreement and the
capacity in which he is authorized (in case of partnership / private Ltd company):
……………………………………………………………………………………………………………………
……………..………………………………………………………….
7(A) Permanent Account No: ……………………………………………………
7(B) GST Registration No(s): ……………………………………………….
8. Details of the Bidder’s Bank for effecting e-payments:
(a) Beneficiary Bank Name:………………………………
(b) Beneficiary branch Name:…………………………….
(c) IFSC code of beneficiary Branch……………………..
(d) Beneficiary account No.:……………………………….
(e) Branch Serial No. (MICR No.):………………………...
BID FORM
From To
…………………………………. AGM (TX-PLG)
O/o CGMT, BSNL
Complete address of the Bidder Door Sanchar Bhawan
Hyderabad – 500 001
1. Having examined the above mentioned tender enquiry document including amendment/
clarification/corrigenda / addenda Nos. ...................... dated …………….. ……………the receipt of
which is hereby duly acknowledged, we, the undersigned, offer to supply and deliver
.............................................. in conformity with the said drawings, conditions of contract and
specifications for the sum shown in the schedule of prices attached herewith and made part of the
financial Bid.
2. Bid submitted by us is properly sealed and prepared so as to prevent any subsequent
alteration and replacement.
3. We agree to abide by this Bid for a period of 120 days from the date fixed for Bid opening or
for subsequently extended period, if any, agreed to by us. This bid shall remain binding upon us up
to the aforesaid period.
4. We understand that you are not bound to accept the lowest or any bid, you may receive.
5. If our Bid is accepted, we will provide you with a performance guarantee from a Scheduled
Bank for a sum @ 3% of the contract value for the due performance of the contract.
6. If our Bid is accepted, we undertake to complete delivery of all the items and perform all the
services specified in the contract in accordance with the delivery schedule specified in the Section-2
(Tender Information).
7. Until a formal Purchase/ Work Order of Contract is prepared and executed, this Bid together
with your written acceptance thereof in your notification of award shall constitute a binding contract
between us.
Unit Rate
for the Rate (In Rupees) for
S.No Description of work UoM
first year subsequent years
(in Rs)
Combined rate per Kilometer
per Month for Preventive and
Corrective maintenance of
Per KM per 105% of the 1st year
1 Underground OFC in Most 900
Month Successful bidder rate
Critical Routes for all types of
soil and strata as per Scope of
Work (excluding GST)
Combined rate per Kilometer
per Month for Preventive and
Corrective maintenance of
Per KM per 105% of the 1st year
2 Underground OFC in Critical 800
Month Successful bidder rate
& Other Routes for all types of
soil and strata as per Scope of
Work (excluding GST)
Combined rate per Kilometer
per Month for Preventive and
Per KM per 105% of the 1st year
3 Corrective maintenance of 150
Month Successful bidder rate
overhead OFC as per Scope of
Work (excluding GST)
Works to be carried out by the Contractor towards Preventive & Corrective Maintenance of OF
Cable Routes (both UG & OH)
1 Route Patrolling - Sub-link wise (30 to 40 kms in Metro or 50-60km in Non-Metro)
2 OTDR Test & Report (Weekly for dark fibers & Every Quarter for Live fiber)
3 Attenuation Test & Report (Weekly for dark fibers & Every Quarter for Live fiber)
4 RoW coordination and liasoning
5 Fixing the fault location
6 Digging the fault location (not applicable for OH)
7 Cable pulling for splicing up (as required)
8 Transportation of materials (like duct, cable etc) from BSNL’s store to Fault location
9 Arranging joint closure and accessories
10 Splicing
11 Checking with OTDR
12 Check for further cut using OTDR
13 Earth work excavation to install SC / PT Chamber
14 Installation of Splicing Chamber / Pull through Chamber
15 Sand Filling for Pull through / Splicing chamber
23 Activities pertaining to Testing such as re- splicing and reducing splice loss and cable losses
Submission of Incident Report, Photo, FIR, Demand Note to other agency and Insurance claim
24
for OFC damage
25 Link Restoration Confirmation with NOC
Coordination with other Telecom operators / NH /SH /Corporation/Panchayat / Electricity
26 department /Water boards / JCB operators to know their work in advance and safe guarding of
our BSNL’s OFC
Restoration of Cable ducts where ever the ducts are exposed due to natural wear and tear. In
27
case of OH OF cable, replacement of the damaged cables.
28 Visual inspection of Joint Closure for water and moisture ingress.
29 Maintenance and updation of ABD after introduction of additional Joint Closures etc.
Visual inspection of Route Markers, prevent damages and repaint and renumber as and when
30
required. (not applicable for OH)
Periodic checking of FDMS and proper fixing /sealing/maintenance of the same including
31
preventing of rat bites.
32 Any other works required for maintenance of SLA parameters
8 OFC Blowing m 7
Combined rates per running Meter for laying O/H OF cable works
(cable erection & tieing , Splicing, termination wherever necessary
1 including transportation & supply of binding wire etc as per Scope m 15
of Work using standard practices of laying utilizing necessary
OF overhead laying accessories (excluding GST).
Combined rates per running Meter for laying O/H OF cable works
(cable erection & tieing , Splicing, termination wherever necessary
2 m 8
including transportation & supply of binding wire etc as per Scope
of Work utilizing street furniture (excluding GST).
Supply of Galvanized Steel tubular (round hollow tubes) pipes of 114.30mm outer diameter of
thickness 4.50mm (Medium) at work site including welding of bottom plate of size
2 0.25mX0.25m(Galvanization: Priming coat of approved steel primer and Galvanization of 100
micron for steel work).The cost includes the supply at work sites including the loading, unloading
and transportation for overhead alignment of OF Cable
4 (c ) 1 set 660
(b) Clevis Thimble- 1no.
Digging charges for tracing joint location of U/G cables whenever as per
5 required to tap existing BSNL PoP/Cable end(Jointing kits will be per meter trenching
supplied by BSNL)(Trench Specs. Refer to U/G SOR) charges
Item
In figures In words
I, II & III
NOTE
1. The rates should be inclusive of all levies but exclusive of GST.
2. Multiple cables in the same trench in the same route will be treated as single route.
3. Cables available in both the sides of the road will be treated as 1.5 times of the route length.
For example, in a route length of 10 Km if cables are available on both sides of the road, the
route length for these cables will be 15 Km.
4. Please refer to Instructions to Bidders for execution of Work & Billing (Section-III) for
responsibilities of BSNL and of contractor.
5. Please refer to Bidding process (Clause-20&21/Section-4 Part A) for tender evaluation
criteria.
NOTE: The Bidder has to quote his percentage (%) for financial bid in a separate sheet (BOQ)
provided in online portal, please refer e-tender instructions in SECTION-IV PART-C.
DEED OF INDEMNITY
TO AND IN FAVOUR OF
WHEREAS
(a) The Purchaser had invited bids vide their Tender Enquiry
No.……………………….(hereinafter referred to as ‘Tender’) for the purpose
of…………………………………………………………………………………………………..
(b) The Bidder had submitted its bid/ proposal dated ___ (hereinafter referred to as the ‘Bid’)
for the provision of such services in accordance with its proposal as set out in its Bid and in
accordance with the terms and conditions of the Tender.
(c) The Bidder has in order to comply with the terms of the Tender agreed to execute the
Deed of Indemnity on such terms and conditions more fully mentioned below.
3. The bidder also declares that in case bidder is blacklisted by GST Authorities in future &
which results in loss of Input Tax Credit (ITC) to BSNL, then BSNL shall have right to recover
any such loss of ITC arising on account of such black-listing.
4. This Deed of Indemnity shall stand terminated on expiry of or early termination of the contract
period as envisaged in the above said Tender requirement.
5. The Deed of Indemnity shall constitute the entire indemnity provided by the Bidder for the
indemnities asked in said Tender.
6. This Deed of Indemnity shall be governed by and construed in accordance with Indian law.
(Authorized Signatory)
Date:
Place:
Witness 1:
Witness 2:
Please ensure that all documents are fully authenticated by the Authorized Signatory with his
signature with official seal, as per the eligible bidder’s criteria. Offer is liable to be rejected, if
enclosed documents are not authenticated.
Documents forming part of the bid: -
Submitted /
Not Submitted
Sl. No. DOCUMENTS (If Not
Applicable,
reason in brief)
Cost of the tender document ( 2,360/- (including 18% GST)-)
or
A proof regarding valid registration with body specified by Ministry of
Micro, Small & Medium Enterprise for the tendered items will have to be
1
attached along with the bid.
The address mentioned in the Registration Certificate & MSME certificate
must be the same. The enlistment certificate issued by MSME should be
valid on the date of opening of tender.
Bid Security in the form of Bank Guarantee for _____/-(as mentioned
at Clause-1 of Section-I (DNIT)) valid up to 180 days from the date of
tender opening.
Or
A proof regarding valid registration with body specified by Ministry of
2
Micro, Small & Medium Enterprise for the tendered items will have to be
attached along with the bid.
The address mentioned in the Registration Certificate & MSME certificate
must be the same. The enlistment certificate issued by MSME should be
valid on the date of opening of tender.
Scanned copy of Bid Form in Section-9 Part A and Price Schedule in
3
Section-9 Part B duly filled up and signed.
Scanned copy of a list of all Board of Directors of the company (In case of
12
Limited Company).
………………………………………..
Place:…………
Date:………….