0% found this document useful (0 votes)
183 views34 pages

Rate Analysis RHD

The document provides specifications for several construction items including: 1) Provision, maintenance and removal of sign boards with a unit price of 8,849 Taka. 2) Progress photographs for 1 month at a unit price of 1,000 Taka. 3) Roadway excavation in existing pavement per cubic metre at a unit price of 265 Taka, requiring labor and small tools.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
183 views34 pages

Rate Analysis RHD

The document provides specifications for several construction items including: 1) Provision, maintenance and removal of sign boards with a unit price of 8,849 Taka. 2) Progress photographs for 1 month at a unit price of 1,000 Taka. 3) Roadway excavation in existing pavement per cubic metre at a unit price of 265 Taka, requiring labor and small tools.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 34

Specification Item Buildup

Item Code 01/02/04


Item Name Provision, Maintenance and Removal of Sign
Boards
Unit of Measurement Lump Sum
Quantity for
1.00
Estimation (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Material
Provision, maintain & remove Signs Lump Sum 7,199.956 1.00 7,199.956 7,199.956
Basic Unit Price of Specification Item : 7,199.956
Plus Profit at (L/S) : 719.996
Sub-Total : 7,919.952
Plus Tax & VAT at 11.7318% : 929.153
Total Unit Price of Specification Item : 8,849.104
Item Code 01/02/07
Item Name Progress Photographs
Unit of Measurement Month
Quantity for
1.00
Estimation (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Progress Photographs month 814.00 1.00 814.00 814.000
Basic Unit Price of Specification Item : 814.000
Plus Profit at (L/S) : 81.001
Sub-Total : 895.001
Plus Tax & VAT at 11.7318% : 105.000
Total Unit Price of Specification Item : 1,000.001
Item Code 01/03/03
Item Name Special or Additional Tests
Unit of Measurement Provisional Sum
Quantity for
1.00
Estimation (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category :
Item Type :
814.00 1.00 814.000 814.000
Basic Unit Price of Specification Item : 814.000
Plus Profit at 10.00% : 81.001
Sub-Total : 895.001
Plus Tax & VAT at 11.7318% : 105.000
Total Unit Price of Specification Item : 1,000.001
Item Code 02/02/03
Item Name Roadway Excavation in Existing Pavement ( not
reinforced concrete)
Unit of Measurement cu metre
Quantity for Estimatio 30.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Small hand tools (2) day 20.00 16.00 320.00 10.667
Item Type Labour 0.00
Semi-skilled labourer day 450.00 7.00 3,150.00 105.000
Unskilled labourer day 350.00 7.50 2,625.00 87.500
Basic Unit Price of Specification Item : 203.167
Plus Profit at 10.00% : 34.009
Sub-Total : 237.176
Plus Tax & VAT at 11.7318% : 27.825
Total Unit Price of Specification Item : 265.001

Item Code 02/10/01


Item Name Construction of Soil Earthen Shoulders
Unit of Measurement cu metre
Quantity for Estimatio 10.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Small hand tools (1) day 20.00 4.33 86.60 8.660
Vibratory roller (1-3 tonne) day 3,500.00 0.04 140.00 14.000
Item Type Labour 0.00
Semi-skilled labourer day 450.00 0.33 148.50 14.850
Unskilled labourer day 350.00 2.56 894.25 89.425
Item Type Material 0.00
Imported suitable bulk fill (off site) cu. metre 85.00 9.25 786.25 78.625
Water cu. metre 10.00 5.00 50.00 5.00
Basic Unit Price of Specification Item : 210.560
Plus Profit at (L/S)% : 21.246
Sub-Total : 231.806
Plus Tax & VAT at 11.7318% : 27.195
Total Unit Price of Specification Item : 259.001

Item Code 03/01/01


Item Name Scarify, Mix and Recompact Existing Pavement and/or Shoulder
Unit of Measurement sq. metre
Quantity for Estimatio 100.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Small hand tools (1) day 20.00 7.00 140.00 1.40
Vibratory roller ( 7-10tonne) day 3,500.00 0.06 218.75 2.19
Water tanker day 2,000.00 0.06 125.00 1.25
Item Type Labour 0.00 0.00
Masons day 450.00 1.00 450.00 4.50
Unskilled labourer day 350.00 6.00 2,100.00 21.00
Item Type Material 0.00 0.00
Water cu. metre 10.00 15.00 150.00 1.50
Basic Unit Price of Specification Item : 31.838
Plus Profit at (L/S)% : 1.497
Sub-Total : 33.334
Plus Tax & VAT at 11.7318% : 1.667
Total Unit Price of Specification Item : 35.001

Item Code 03/01/02


Item Name Repair of Potholes on the Existing Pavement
Unit of Measurement cu metre
Quantity for Estimatio 1.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Bitumen Heater (Tar Boiler) day 400.00 0.50 200.00 200.00
Richshaw Van day 250.00 0.50 125.00 125.00
Small hand tools (2) day 20.00 6.50 130.00 130.00
Item Type Labour 0.00 0.00
Asphalt Mistry day 500.00 0.50 250.00 250.00
Semi-skilled labourer day 450.00 1.00 450.00 450.00
Unskilled labourer day 350.00 4.00 1,400.00 1,400.00
Item Type Material 0.00 0.00
Bitumen tonne 60,000.00 0.09 5,100.00 5,100.00
Coarse Sand FM>2.5 cu. metre 1,500.00 0.44 660.00 660.00
Crushed boulder/gravel aggregate <25mm cu. metre 3,000.00 0.56 1,680.00 1,680.00
Crusher (stone) dust cu. metre 600.00 0.21 127.20 127.20
Firewood tonne 3,000.00 0.09 270.00 270.00
Basic Unit Price of Specification Item : 10,392.200
Plus Profit at 10.00% : 1,003.840
Sub-Total : 11,396.040
Plus Tax & VAT at 11.7318% : 1,336.961
Total Unit Price of Specification Item : 12,733.001

Item Code 03/02/01


Item Name Sub-Base
Unit of Measurement cu metre
Quantity for Estimatio 10.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Flat Bed truck (5tons) day 3,500.00 0.30 1,050.00 105.000
Small hand tools (1) day 20.00 12.50 250.00 25.000
Vibratory roller ( 7-10tonne) day 3,500.00 0.06 210.00 21.000
Item Type Labour 0.00 0.00
Masons day 500.00 2.00 1,000.00 100.000
Unskilled labourer day 350.00 10.50 3,675.00 367.500
Item Type Material 0.00 0.000
Sand FM>1.0 cu. metre 500.00 4.55 2,275.00 227.500
Brick Khoa < 40mm cu. metre 2,500.00 8.45 21,125.00 2,112.500
Water cu. metre 10.00 10.00 100.00 10.000
Basic Unit Price of Specification Item : 2,968.500
Plus Profit at 10.00% : 218.597
Sub-Total : 3,187.097
Plus Tax & VAT at 11.7318% : 373.904
Total Unit Price of Specification Item : 3,561.001

Item Code 03/03/01


Item Name Aggregate Base Type I
Unit of Measurement cu metre
Quantity for Estimatio 10.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Flat Bed truck (5tons) day 3,500.00 0.30 1,050.00 105.000
Small hand tools (1) day 20.00 12.50 250.00 25.000
Vibratory roller ( 7-10tonne) day 3,500.00 0.06 210.00 21.000
Item Type Labour 0.00 0.00
Masons day 500.00 2.00 1,000.00 100.000
Unskilled labourer day 350.00 10.50 3,675.00 367.500
Item Type Material 0.00 0.000
Crushed boulder/gravel aggregate <40mm cu. metre 4,500.00 9.10 40,950.00 4,095.000
Sand FM>1.0 cu. metre 500.00 3.90 1,950.00 195.000
Water cu. metre 10.00 10.00 100.00 10.000
Basic Unit Price of Specification Item : 4,918.500
Plus Profit at 10.00% : 666.590
Sub-Total : 5,585.090
Plus Tax & VAT at 11.7318% : 655.232
Total Unit Price of Specification Item : 6,240.321

Item Code 03/06/01a


Item Name Bituminous Prime Coat (Plant Placed)
Unit of Measurement sq. metre
Quantity for Estimatio 1500.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Bitumen Distributor day 3,000.00 0.75 2,250.00 1.50
Bitumen Heater day 1,200.00 2.00 2,400.00 1.60
Small hand tools (1) day 20.00 13.00 260.00 0.17
Tyre roller PTR day 3,500.00 0.13 455.00 0.30
Water tanker day 2,000.00 0.13 260.00 0.17
Air Blower day 3,500.00 0.13 455.00 0.30
Item Type Labour 0.00 0.00
Asphalt Mistry day 500.00 2.00 1,000.00 0.67
Semi-skilled labourer day 450.00 1.00 450.00 0.30
Unskilled labourer day 350.00 10.00 3,500.00 2.33
Item Type Material 0.00 0.00
Bitumen tonne 60,000.00 1.30 78,000.00 52.00
Firewood tonne 3,000.00 0.60 1,800.00 1.20
Kerosene ltr 64.00 650.00 41,600.00 27.73
Basic Unit Price of Specification Item : 88.287
Plus Profit at 10.00% : 3.900
Sub-Total : 92.186
Plus Tax & VAT at 11.7318% : 10.815
Total Unit Price of Specification Item : 103.001

Item Code 03/07/01a


Item Name Bituminous Tack Coat (Plant Work)
Unit of Measurement sq. metre
Quantity for Estimatio 1000.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Bitumen Distributor day 3,000.00 0.75 2,250.00 2.25
Bitumen Heater day 1,200.00 1.00 1,200.00 1.20
Small hand tools (2) day 20.00 7.00 140.00 0.14
Item Type Labour 0.00 0.00
Asphalt Mistry day 500.00 1.00 500.00 0.50
Semi-skilled labourer day 450.00 1.00 450.00 0.45
Unskilled labourer day 350.00 2.00 700.00 0.70
Item Type Material 0.00 0.00
Bitumen tonne 60,000.00 0.45 27,000.00 27.00
Firewood tonne 3,000.00 0.09 270.00 0.27
Kerosene ltr 64.00 0.00 0.00 0.00
Basic Unit Price of Specification Item : 32.510
Plus Profit at 10.00% : 7.584
Sub-Total : 40.094
Plus Tax & VAT at 11.7318% : 5.907
Total Unit Price of Specification Item : 46.001

Item Code 03/10/02(b)


Item Name DBS - Wearing Course (Bitumen Grade 60/70)
Unit of Measurement cu metre
Quantity for Estimatio 25.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
AC Paver day 6,500.00 1.00 6,500.00 260.000
Asphalt Plant day 10,500.00 0.50 5,250.00 210.000
Bitumen Distributor day 3,000.00 0.50 1,500.00 60.000
Dump Truck day 4,000.00 5.00 20,000.00 800.000
Tyre roller PTR day 3,500.00 1.00 3,500.00 140.000
Vibratory Roller ( 6-7.5 tonne) day 3,500.00 0.50 1,750.00 70.000
Item Type Labour 0.00 0.000
Asphalt Mistry day 500.00 2.00 1,000.00 40.000
Foreman day 800.00 1.00 800.00 32.000
Semi-skilled labourer day 450.00 4.00 1,800.00 72.000
Unskilled labourer day 350.00 8.00 2,800.00 112.000
Item Type Material 0.00 0.000
Angle Iron (62.5x62.5x6mm) using 20 times lin. metre 350.00 20.00 7,000.00 280.000
Bitumen tonne 60,000.00 3.07 184,200.00 7,368.000
Coarse Sand FM>2.5 cu. metre 1,500.00 6.25 9,375.00 375.000
Crushed boulder/gravel aggregate <25mm cu. metre 3,000.00 21.88 65,640.00 2,625.600
Crusher (stone) dust cu. metre 600.00 3.12 1,872.00 74.880
Diesel ltr 64.00 137.50 8,800.00 352.000
Basic Unit Price of Specification Item : 12,871.480
Plus Profit at 10.00% : 1,554.137
Sub-Total : 14,425.617
Plus Tax & VAT at 11.7318% : 1,692.384
Total Unit Price of Specification Item : 16,118.001

Item Code 03/11/01


Item Name Premix Bituminous Carpeting (Bitumen Grade 80/100)
Unit of Measurement cu metre
Quantity for Estimatio 25.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Bitumen Heater (Tar Boiler) day 400.00 1.00 400.00 16.00
Richshaw Van day 250.00 3.00 750.00 30.00
Small hand tools (2) day 20.00 83.00 1,660.00 66.40
Tyre roller PTR day 3,500.00 1.00 3,500.00 140.00
Vibratory roller (1-3 tonne) day 3,500.00 1.00 3,500.00 140.00
Item Type Labour 0.00 0.00
Asphalt Mistry day 500.00 14.00 7,000.00 280.00
Masons day 450.00 4.00 1,800.00 72.00
Semi-skilled labourer day 450.00 18.00 8,100.00 324.00
Unskilled labourer day 350.00 47.00 16,450.00 658.00
Item Type Material 0.00 0.00
Angle Iron (62.5x62.5x6mm) using 20 times lin. metre 350.00 20.00 7,000.00 280.00
Bitumen tonne 60,000.00 2.43 145,800.00 5,832.00
Coarse Sand FM>2.5 cu. metre 1,500.00 13.13 19,695.00 787.80
Crushed boulder/gravel aggregate <25mm cu. metre 3,000.00 16.25 48,750.00 1,950.00
Crusher (stone) dust cu. metre 600.00 3.12 1,872.00 74.88
Firewood tonne 3,000.00 1.36 4,080.00 163.20
Basic Unit Price of Specification Item : 10,814.280
Plus Profit at 10.00% : 1,021.205
Sub-Total : 11,835.485
Plus Tax & VAT at 11.7318% : 1,388.515
Total Unit Price of Specification Item : 13,224.001

Item Code 03/13/01


Item Name Brick on End Edging
Unit of Measurement Lin. Metre
Quantity for Estimatio 100.00 (All Prices Are in Taka)
Specification Item Components
Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Small hand tools (2) day 20.00 4.00 80.00 0.80
Item Type Labour 0.00 0.00
Masons day 450.00 1.00 450.00 4.50
Unskilled labourer day 350.00 3.00 1,050.00 10.50
Item Type Material 0.00 0.00
Brick P.J. no. 8.50 800.00 6,800.00 68.00
Sand FM>0.5 cu. metre 400.00 0.20 80.00 0.80
Basic Unit Price of Specification Item : 84.600
Plus Profit at 10.00% : 7.586
Sub-Total : 92.186
Plus Tax & VAT at 11.7318% : 10.815
Total Unit Price of Specification Item : 103.001

Item Code 05/01/02a


Item Name Concrete Class as Detailed on Drawings
( Class10)
Unit of Measurement cu metre
Quantity for Estimation 2.83 (All Prices Are in Taka)
Specification Item Components
Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Concrete Mixer (7/5) day 800.00 0.17 132.80 46.89
Small hand tools (2) day 20.00 7.00 140.00 49.44
Water Pump day 950.00 0.13 118.75 41.93
Item Type Labour 0.00
Labour cost for fixing and Removing shutter for foundation sq. metre 84.00 4.02 337.68 119.24
Masons day 450.00 0.67 301.50 106.46
Semi-skilled labourer day 450.00 1.00 450.00 158.90
Unskilled labourer day 350.00 5.60 1,960.00 692.09
Item Type Material 0.00
Cement tonne 12,800.00 0.60 7,680.00 2,711.86
Cost of wooden shutter for concrete using 6 times sq. metre 200.00 0.12 24.60 8.69
Nail kg 150.00 0.50 75.00 26.48
Sand FM >1.5 cu. metre 1,500.00 1.27 1,905.00 672.67
Brick Khoa < 40mm cu. metre 2,500.00 2.55 6,375.00 2,251.06
Basic Unit Price of Specification Item : 6,885.710
Plus Profit at 10.00% : 691.365
Sub-Total : 7,577.074
Plus Tax & VAT at 11.7318% : 888.927
Total Unit Price of Specification Item : 8,466.001

Item Code 05/01/02l


Item Name Concrete Class - 35
Unit of Measurement cu metre
Quantity for Estimation 2.83 (All Prices Are in Taka)
Specification Item Components
Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Concrete Mixer (7/5) day 800.00 0.166 132.80 46.89
Concrete Poker Vibrator day 450.00 0.166 74.70 26.38
Small hand tools (1) day 20.00 9.00 180.00 63.56
Staging with M. S. pipe (pc girder bridge) sq. metre 1,785.00 7.00 12,495.00 4,412.08
Item Type Labour 0.00
Labour cost for Staging (p.c girder bridge) sq. metre 685.00 7.00 4,795.00 1,693.15
Labour for fixing and removing steel form (pc girder) sq. metre 190.00 24.50 4,655.00 1,643.71
Masons day 450.00 0.83 373.50 131.89
Semi-skilled labourer day 450.00 1.33 598.50 211.33
Unskilled labourer day 350.00 7.50 2,625.00 926.91
Item Type Material 0.00
Cement tonne 12,800.00 1.25 16,000.00 5,649.72
Coarse Sand FM>2.5 cu. metre 1,500.00 1.12 1,680.00 593.22
Crushed boulder/gravel aggregate <25mm cu. metre 3,000.00 2.24 6,720.00 2,372.88
Sica lump sum 220.00 1.00 220.00 77.68
Steel form work (pc girder bridge) sq. metre 200.00 24.50 4,900.00 1,730.23
Basic Unit Price of Specification Item : 19,579.626
Plus Profit at 10.00% : 1,960.348
Sub-Total : 21,539.974
Plus Tax & VAT at 11.7318% : 2,527.027
Total Unit Price of Specification Item : 24,067.001
Item Code 05/02/02
Item Name High Yield Reinforcement Bars
Unit of Measurement Tonne
Quantity for Estimation 1.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Small hand tools (2) day 20.00 17.00 340.00 340.00
Item Type Labour 0.00
Semi-skilled labourer day 450.00 6.00 2,700.00 2,700.00
Steel fixers day 600.00 4.00 2,400.00 2,400.00
Unskilled labourer day 350.00 6.09 2,133.25 2,133.25
Item Type Material 0.00
G.I wire, nails etc kg 115.00 20.00 2,300.00 2,300.00
M. S. bar 60 grade tonne 65,645.00 1.03 67,614.35 67,614.35
Basic Unit Price of Specification Item : 77,487.598
Plus Profit at 10.00% : 7,748.656
Sub-Total : 85,236.254
Plus Tax & VAT at 11.7318% : 9,999.747
Total Unit Price of Specification Item : 95,236.001
Item Code 05/05/01
Item Name New and Extended Brickwork
Unit of Measurement cu metre
Quantity for Estimation 1.00 (All Prices Are in Taka)

Specification Item Components


Quantity Price for
Unit of
Item Name Unit Rate Require Estimation Unit Price
Measurement
d Quantity
Item Category Primary Item
Item Type Equipment
Scaffolding for Brickwork sq. metre 30.00 2.00 60.00 60.00
Small hand tools (2) day 20.00 2.80 56.00 56.00
Item Type Labour 0.00
Masons day 450.00 0.50 225.00 225.00
Semi-skilled labourer day 450.00 0.33 148.50 148.50
Unskilled labourer day 350.00 2.00 700.00 700.00
Item Type Material 0.00
1st Class Brick no. 7.50 390.00 2,925.00 2,925.00
Cement tonne 12,800.00 0.11 1,440.00 1,440.00
Sand FM >1.5 cu. metre 1,500.00 0.40 600.00 600.00
Basic Unit Price of Specification Item : 6,154.500
Plus Profit at 10.00% : 475.663
Sub-Total : 6,630.163
Plus Tax & VAT at 11.7318% : 777.838
Total Unit Price of Specification Item : 7,408.001

Item No.- 15.4


Min 1/2" thick cement plaster (1:6) to walls (average of 1/2" on one side and 3/4" on other side).
Considering 100 sft. of work
A. For 1/2" thick cement plaster (1:6) to walls
(a) Sand (F.M. 1.2) 6 cft. @ Tk.1,700.00 Per % cft. = Tk. 102.00
(b) Cement 0.75 bag @ Tk. 440.00 Per bag = Tk. 330.00
(c) Labour
(i) Head mason 0.25 No. @ Tk. 493.00 each = Tk. 123.25
(ii) Mason 1.00 No. @ Tk. 389.00 each = Tk. 389.00
(iii) Ordinary labour 1.00 No. @ Tk. 245.00 each = Tk. 245.00
(d) Washing of sand, local carriage, scaffolding, curing, & sundries etc. L.S. = Tk. 245.00
Total = Tk. 1,434.25
Profit 10.00% = Tk. 143.43
Overhead 3.50% = Tk. 50.20
Tk. 1,627.88
VAT 5.50% = Tk. 89.53
Grand total = Tk. 1,717.41
B. For 3/4" thick cement plaster (1:6) to walls
(a) Sand (F.M. 1.2) 8.25 cft. @ Tk.1,700.00 Per % cft. = Tk. 140.25
(b) Cement 1.1 bag @ Tk. 440.00 Per bag = Tk. 484.00
(c) Labour =
(i) Head mason 0.25 No. @ Tk. 493.00 each = Tk. 123.25
(ii) Mason 1.00 No. @ Tk. 389.00 each = Tk. 389.00
(iii) Ordinary labour 1.00 No. @ Tk. 245.00 each = Tk. 245.00
(d) Washing of sand, local carriage, scaffolding, curing, & sundries etc. L.S. = Tk. 245.00
Total = Tk. 1,626.50
Profit 10.00% = Tk. 162.65
Overhead 3.50% = Tk. 56.93
= Tk. 1,846.08
Add VAT with adjustment factor 1.0582 5.50% = Tk. 107.44
Grand total = Tk. 1,953.52
Average of A & B = Tk. 1,835.47
(i) Ground floor Rate per sft = Tk. 18.35
Rate per sqm. = Tk. 197.52

Say, Tk. 198 .00 Per sqm.

Assumption :
ITEM TYPE : EQUIPMENT

Item Name Unit of Meas. Unit Rate


Batching Plant with Generator day 36,000.00
1-3KVA Mobile Generator no. 15,250.00
Flashing Light Units (mains power) no. 650.00
Flood Light (Pole mounted) no. 1,750.00
Traffic Signs with pole & support for Traffic Man no. 5000.00
Small hand tools (1) day 20.00
Small hand tools (2) day 20.00
Plate Compactor day 900.00
Vibratory roller (1-3 tonne) day 2,700.00
Steel Wheel Roller (5-6 Tonne) day 3,200.00
Vibratory roller ( 7-10tonne) day 5,000.00
Concrete Poker Vibrator day 450.00
Water Pump day 950.00
Water tanker day 4,500.00
Water bowser for curing day 4,300.00
Water pump with accessories day 2,000.00
Saw cutter day 2,000.00
Concrete Mixer (7/5) day 750.00
Concrete Mixer (14/10) day 1,250.00
Bitumen Heater day 1,500.00
Bitumen Heater (Tar Boiler) day 600.00
Flat Bed truck (5tons) day 4,500.00
Truck (5 Tonne) day 4,500.00
Aggregate Spreader day 4,000.00
Bitumen Distributor day 3,750.00
Hand operated bitumen distributor day 500.00
Tyre roller PTR day 4,000.00
AC Paver day 6,000.00
Asphalt Plant day 10,000.00
Dump Truck day 5,000.00
Air Blower/Power Brush/Drag Brush* day 4,500.00
Pay Loader* day 10,000.00
2/3 wheel static roller 8-12 tonnes day 4,200.00
Bored Pile Equipment (400mm) day 4,500.00
Bored Pile Equipment (600mm) day 4,500.00
Bored Pile Equipment (750mm) day 4,700.00
Bored Pile Equipment (900mm) day 4,800.00
Bored Pile Equipment (1000mm) day 4,800.00
Pile Integrity Test No. 700.00
Richshaw Van day 350.00
Winch Machine with Grab day 1,800.00
Staging with M. S. pipe (pc girder bridge) sq. metre 1,760.00
Agitator Truck/ Transit mixure truck day 10,000.00
Concrete Paver day 30,000.00
Mobilization/Demobilization for pre cast pile driv L.S. 1,000.00
ITEM TYPE : EQUIPMENT

Item Name Unit of Meas. Unit Rate


Pile Diving Equipment (concrete piles) day 3,500.00
Hire Charge for mobile Generator/welding machin day 2,000.00
Hire charge of monkey with driving arrangement. L.S. 3,200.00
Boiler/Heater (1) day 7,000.00
Spreader day 6,000.00
R.C.C Pipe dia 600mm (wall 50mm) lin. metre 850.00
Pump with pipe and accessories day 7,500.00
Water bowser for curing day 4,300.00
Batching Plant with Generator day 36,000.00
Pump with pipe and exessories day 7,500.00
Agitator Truck day 10,000.00
Hire Charge for mobile Generator/welding machin day 2,000.00
Hydraulic Jack day 325.00
Kato Crane 20tonnes (truck mounted) day 12,650.00
Agitator Truck/ Transit mixure truck day 10,000.00
Lifting Crane (Capacity-25 MT) day 30,000.00
Flat bed trailor (Capacity-30 MT) day 20,000.00
Tining machine day 3,000.00
Finisher roller day 2,000.00
Unit Rate of Labour
(Taka)
Sl. Category Unit Recommended
No. Rate 2015
1 Ganger Per day/person 800
2 Fore man Per day/person 800
3 Carpenter Per day/person 600
4 Asphalt Mistry Per day/person 600
5 Mason Per day/person 600
6 Steel fixers Per day/person 600
7 Welder Per day/person 600
8 Painter Per day/person 600
9 Painter Helper Per day/person 500
10 Skilled Per day/person 550
11 Semi-skilled Per day/person 450
12 Un-skilled Per day/person 400
13 Flag Man Per day/person 400
Labour cost for fixing and
14 Removing shutter for sq. metre 100
foundation
Unit Rate of Materials

Recommended Rate
Sl. No. Basic Item Category Unit
2015 (Taka)
FM = 0.5 Cum 450.00
FM = 0.8 Cum 500.00
1 Sand FM = 1.0 Cum 600.00
FM = 1.8 Cum 1200.00
FM = 2.5 Cum 1700.00
2 Cement OPC Ton 10764.00
3 Reinforcement 60 grade Ton 65640.00
80/100 Penetration grade Ton 68500.00
4 Bitumen
60/70 Penetration grade Ton 73000.00
5 Brick 1st Class Per 1000 7477.00
7 Brick Chips 40mm cum 3000.00
Brick Chips <25mm cum 3000.00

Brick P.J. Nos 8.00


25mm cum 4800.00
14mm cum 4600.00
8 Stone Chips/ Gravel
12mm cum 4400.00
9mm cum 3500.00
20mm cum 5970.00
9 Stone Chippings (Chattak/Pakur) 14mm cum 4800.00
10mm cum 4600.00
Crusher (stone) dust cum 650.00
Sylhet boulders 100-200mm cum 4000.00
10 Pea Gravels cum 2500.00

Gravels (as dug) cum 1700.00


11 Fire Wood Ton 5000.00
Wooden runner (using 6 times) cum 6000.00
Wooden Sleper LS 350.00
6m long (Dia 150 – 175mm) Lin. meter 500.00
12 Bullah Pile
6m long (Dia 150 – 200mm) Lin. meter 550.00
13 Petrol ltr 96.00
Diesel ltr 68.00
Kerosene ltr 68.00
14 Soil cu. metre 75.00
15 Imported suitable bulk fill cu. metre 75.00
16 Plastic Tape Pks Pks 240.00
17 Steel Box for Traffic Management Nos Nos 60.00
18 Water Cum 10.00
19 Geotextile sq. metre 100.00
20 G.I wire, nails etc kg 100.00
21 Polythene sheet sq. metre 15.00
22 Wooden form work using 4 times cu. metre 6250.00
23 Nuts, bolts, washers etc nos 65.00
24 Paint (Road Marking Berger brand) Lit. 610.00
25 Thiner (Jensolin T-4) Berger brand Lit. 165.00
26 Roadway Excavation in unsuitable Material cum 150.00
27 Sand Backfill for Structures cum 800.00
28 Single Layer Brick Flat Soling sqm 478.00
29 Bentonite (50kg) bag 850.00
30 6mm thick steel plate kg 75.00
31 Paint ltr 250.00
Angle Iron (b) 38x38x5mm for pre cast pile shutter using 16
32 times tonne 48000.00

33 Cost of platform (pre-cast pile) using 5 times sq. metre 48.00


34 F I bar (b) 38x5mm for pre cast pile shutter using 16 times tonne 45000.00
35 Nut bolt for pre cast pile shutter using 16 times kg 80.00
36 Pre-cast pile shoe (0.3x0.3m pile) No 285.00
37 Steel Plate 2mm for pre cast pile shutter using 16 time tonne 80000.00
38 Nut Bolts (12 mm Dia 125 mm L) tonne 90000.00
Unit Rate of Materials

Recommended Rate
Sl. No. Basic Item Category Unit
2015 (Taka)
39 Angle Iron (62.5x62.5x6mm) using 20 times lin. metre 335.00
40 Cost of wooden shutter for concrete using 6 times sq. metre 120.00
41 Nail kg 100.00
42 Admixture Liter 160.00
43 Cost of prefabricated steel shutter (using 50 times) sq. metre 827.00
44 Lifting anchorage No. 500.00
45 Sica LS 300.00
46 Hire cost of shuttering material sq. metre 121.00
Division 1 - General & Site Facilities

Change in Unit Rates


Sl. RHD Schedule of Rate Rate Analysed by the
Item Code Description. between May/2011 and
No. May/2011. Committee-June-2015
June/2015 (%)
1 2 3 4 5 6
Qnty Rate (Tk.) Qnty Rate (Tk.) %

1 1/1/01 Maintenance and Protection of Traffic L.S. 72,575.00 Lump Sum #REF! #REF!

Maintain Temp.Structures & Equipment for the


2 1/1/02 day 1,505.00 day #REF! #REF!
Maintenance and Protection of Traffic

3 1/2/01 Supply, Erect and Remove Field Office for Engineer L.S. 225,000.00 Lump Sum #REF! #REF!

Maintenance, Staffing, Security and Cleaning of the Field


4 1/2/02 Month 10,000.00 Month #REF! #REF!
Office for the Engineer

5 1/2/03 Provision of Office Equipment and Consumables Month 7,000.00 Month #REF! #REF!

6 1/2/04 Provision, Maintenance and Removal of Sign Boards L.S. 8,000.00 Lump Sum #REF! #REF!

7 1/2/05 Provision and Maintenance of Survey Equipment Month 800.00 month #REF! #REF!

8 1/2/07 Progress Photographs Month 1,000.00 Month #REF! #REF!

9 1/3/01 Provide and Remove Site Laboratory & Equipment L.S. 300,000.00 Lump Sum #REF! #REF!

10 1/3/02 Maintain Site Laboratory Month 7,000.00 Month #REF! #REF!

11 1/3/03 Special or Additional Tests Pro.Sum - Pro. Sum 1,000.00

12 1/4/01 Saloon Car 1200cc Capacity Month 50,000.00 Month #REF! #REF!

13 1/4/02 Pick- up (Double Cab) Month 60,000.00 Month #REF! #REF!

14 1/4/03 Four Wheel Drive Vehicle Min. 6 seats Month 70,000.00 Month #REF! #REF!

15 1/4/04 Motor Cycle 125cc Month 4,000.00 Month #REF! #REF!

16 1/4/05 Motor Boat min 5m length Month 15,000.00 Month #REF! #REF!
Division 2 – Earthwork

Change in Unit Rates


Sl. RHD Schedule of Rate Rate Analysed by the
Item Code Description. between May/2011 and
No. May/2011. Committee-June-2015
June/2015 (%)
1 2 3 4 5 6

1.        Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty


          
           2/1/01 Clearing and Grubbing sq. metre 35.00 sq. metre #REF! #REF!
          
2.        
     
          
           2/2/01 Roadway Excavation in Unsuitable Soil cu metre 134.00 cu metre #REF! #REF!
          
3.        
     
          
           2/2/02 Roadway Excavation in Suitable Soil cu metre 134.00 cu metre #REF! #REF!
          
4.        
     
           Roadway Excavation in Existing Pavement ( not
           2/2/03 cu metre 220.00 cu metre - -100.00%
          
5.         reinforced concrete)
     
           Roadway Excavation in Existing Reinforced Concrete
           2/2/04 cu metre 959.00 cu metre #REF! #REF!
          
6.         Pavement
     
           Deduction of Value of Suitable Soil Recovered from
           2/2/05 cu metre 74.00 cu metre #REF! #REF!
          
7.        Existing Road
     
           Deduction of Value of Materials Recovered from
           2/2/06 cu metre 2,059.00 cu metre #REF! #REF!
          
8.        existing Road Pavement
     
          
           2/4/01 Channel Excavation in Unsuitable Materials cu metre 138.00 cu metre #REF! #REF!
          
9.       
     
          
           2/4/02 Channel Excavation in Suitable Material cu metre 138.00 cu metre #REF! #REF!
          
10.     
     
          
           2/5/01 Excavation and Backfill for Structures cu metre 287.00 cu metre #REF! #REF!
          
11.     
  
          
           2/5/02 Concrete Backfill for Structures cu metre 8,392.00 cu metre #REF! #REF!
          
12.      
  
          
           2/5/03 Sand Backfill for Structures cu metre 1,017.00 cu metre #REF! #REF!
          
13.      
  
          
           2/06/1(a) Embankment Fill from Excavation on site. cu metre 201.00 cu metre #REF! #REF!
          
14.      
  
           Embankment Fill from Excavation in Borrow pit within
           2/06/1(b) cu metre 192.00 cu metre #REF! #REF!
          
15.       the Right -of-way
  
           Embankment fill from borrow pit in contractor's
           2/6/02 cu metre 250.00 cu metre #REF! #REF!
          
16.       Arranged land
  
          
           2/6/03 Sand Backfill to Swamp cu metre 400.00 cu metre #REF! #REF!
          
17.      
  
          
           2/7/01 Preparation of Subgrade 300 mm Depth sq. metre 57.00 sq. metre #REF! #REF!
          
18.      
  
          
           2/7/02 Preparation of Subgrade 450 mm depth sq. metre 85.00 sq. metre #REF! #REF!
          
19.      
  
          
           2/8/01 Improved Subgrade cu metre 804.00 cu metre #REF! #REF!
          
20.     
  
           Dismantling Existing Structure including disposal of
           * 2/9/01 L.S. - Lump Sum
          
21.      spoil and backfilling.
  
           Dismanting Portions of Existing Structure including
           * 2/9/02 L.S. - Lump Sum
          
22.      stockpiling of materials.
  
           Deduction of the Value of Recovered Materials from
           * 2/09/3(a) L.S. - Lump Sum
          
23.      Structures
  
           Deduction of the Value of Recovered Materials from
           * 2/09/3(b) L.S. - Lump Sum
          
24.      Structures
  
          
           2/10/01 Construction of Soil Earthen Shoulders cu metre 208.00 cu metre #REF! #REF!
          
25.      
  
          
           2/11/01 Construction of Hard Shoulders cu metre 4,068.00 cu metre #REF! #REF!
          
26.      
  
          
           2/12/01 Subgrade Drains Lin. Metre 243.00 Lin. Metre #REF! #REF!
          
  
Division 3 – Pavement work

Change in Unit Rates


Sl. RHD Schedule of Rate Rate Analysed by the
Item Code Description. between May/2011 and
No. May/2011. Committee-June-2015
June/2015 (%)
1 2 3 4 5 6
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
Scarify, Mix and Recompact Existing Pavement
1 3/1/01 sq. metre 39.00 sq. metre - -100.00%
and/or Shoulder
2 3/1/02 Repair of Potholes on the Existing Pavement cu metre 12,715.00 cu metre - -100.00%
3 3/2/01 Sub-Base cu metre 3,953.00 cu metre - -100.00%
4 3/3/01 Aggregate Base Type I cu metre 5,475.00 cu metre - -100.00%
5 3/3/02 Aggregate Base Type II cu metre 4,275.00 cu metre #REF! #REF!
6 03/06/1a Bituminous Prime Coat (Plant Placed) sq. metre 90.00 sq. metre - -100.00%
7 03/06/1b Bituminous Prime Coat (hand placed) sq. metre 87.00 sq. metre #REF! #REF!
8 03/07/1a Bituminous Tack Coat (Plant Work) sq. metre 27.00 sq. metre - -100.00%
9 03/07/1b Bituminous Tack Coat (Labour intensive work) sq. metre 22.00 sq. metre #REF! #REF!
10 3/8/01 Primer seal sq. metre 86.00 sq. metre #REF! #REF!
Single Bituminous Surface Treatment 14mm
11 03/09/1(a) nominal size aggregate (Machine Method) Sq Meter 161.00 Sq Meter #REF! #REF!
(Bitumen Grade 80/100)
Single Bituminous Surface Treatment 14mm
12 03/09/1(b) nominal size aggregate (Machine Method) Sq Meter - Sq Meter #REF!
(Bitumen Grade 60/70)
Double Bituminous Surface Treatment-20mm
13 3/09/02(a) nominal size aggregate followed by 10mm Sq Meter 300.00 Sq Meter #REF! #REF!
(Machine Method) (Bitumen Grade 80/100)
Double Bituminous Surface Treatment-20mm
14 3/09/2(b) nominal size aggregate followed by 10mm Sq Meter - Sq Meter #REF!
(Machine Method) (Bitumen Grade 60/70)
Double Bituminous Surface Treatment-14mm
15 3/09/02(c) nominal size aggregate followed by 10mm Sq Meter 264.00 Sq Meter #REF! #REF!
(Machine Method) (Bitumen Grade 80/100)
Double Bituminous Surface Treatment-14mm
16 3/09/2(d) nominal size aggregate followed by 10mm Sq Meter - Sq Meter #REF!
(Machine Method) (Bitumen Grade 60/70)
Dense Bituminous Surfacing-Base Course (Plant
17 03/10/1(a) cu meter 13,591.00 cu meter #REF! #REF!
Method) (Bitumen Grade 80/100)
Dense Bituminous Surfacing-Base Course (Plant
18 03/10/1(b) cu meter - cu meter #REF!
Method) (Bitumen Grade 60/70)
Dense Bituminous Surfacing - Wearing Course
19 03/10/2(a) cu meter 14,267.00 cu meter #REF! #REF!
(Plant Method) (Bitumen Grade 80/100)
Dense Bituminous Surfacing - Wearing Course
20 03/10/2(b) cu meter - cu meter -
(Plant Method) (Bitumen Grade 60/70)
21 3/11/01 Premix Bituminous Carpeting cu metre 13,191.00 cu metre - -100.00%
22 3/12/02 12 mm Compacted Premix Bituminous Seal Coat sq. metre 126.00 sq. metre #REF! #REF!
23 3/12/03 15 mm Compacted Premix Bituminous Seal Coat sq. metre 162.00 sq. metre #REF! #REF!
24 3/13/01 Brick on End Edging Lin. Metre 88.00 Lin. Metre - -100.00%
Single Layer Brick Flat Soling i/c 75mm thick
25 3/13/02 sq. metre 411.00 sq. metre #REF! #REF!
compacted sand cushion
Herring Bond Brick Pavement i/c 12mm sand
26 3/13/03 sq. metre 546.00 sq. metre #REF! #REF!
cushion
27 03/14/01(a) Dry Lean Concrete Class-10 (Concrete Mixture). cu meter - #REF!
Dry Lean Concrete Class-10 (Batching Plant
28 03/14/1(b) cu meter - #REF!
without Concrete Paver).
Dry Lean Concrete Class-10 (Batching Plant with
29 03/14/1(c) cu meter - #REF!
Concrete Paver).
30 03/14/2(a) Dry Lean Concrete Class-20 (Concrete Mixture). cu meter #REF!
Dry Lean Concrete Class-20 (Batching Plant
31 03/14/2(b) cu meter - #REF!
without Concrete Paver).
Dry Lean Concrete Class-20 (Batching Plant with
32 03/14/2(c) cu meter - #REF!
Concrete Paver).
Cement Concrete Pavement (Concrete Class-25)
33 03/15/1(a) cu meter - #REF!
(Concrete Mixture).
Cement Concrete Pavement (Concrete Class-25)
34 03/15/1(b) cu meter - #REF!
(Batching Plant without Concrete Paver).
Cement Concrete Pavement (Concrete Class-25)
35 03/15/1(c) cu meter - #REF!
(Batching Plant with Concrete Paver).
Precast RCC Pavement slab (Concrete Class-25)
36 03/15/1(d) cu meter - #REF!
(Batching Plant)
Cement Concrete Pavement (Concrete Class-30)
37 03/15/2(a) cu meter - #REF!
(Concrete Mixture).
Cement Concrete Pavement (Concrete Class-30)
38 03/15/2(b) cu meter - #REF!
(Batching Plant without Concrete Paver).
Cement Concrete Pavement (Concrete Class-30)
39 03/15/2(c) cu meter - #REF!
(Batching Plant with Concrete Paver).
Precast RCC Pavement slab (Concrete Class-30)
40 03/15/2(d) cu meter - #REF!
(Batching Plant)
Cement Concrete Pavement (Concrete Class-35)
41 03/15/3(a) cu meter - #REF!
(Concrete Mixture).
Cement Concrete Pavement (Concrete Class-35)
42 03/15/3(b) cu meter - #REF!
(Batching Plant without Concrete Paver).
Cement Concrete Pavement (Concrete Class-35)
43 03/15/3(c) cu meter - #REF!
(Batching Plant with Concrete Paver).
Precast RCC Pavement slab (Concrete Class-35)
44 03/15/3(d) cu meter - #REF!
(Batching Plant)
Division 4 – Foundation work
Change in Unit Rates
Sl. RHD Schedule of Rate Rate Analysed by the
Item Code Description. between May/2011 and
No. May/2011. Committee-June-2015
June/2015 (%)
1 2 3 4 5 6
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
1 04/01/1a Bored Cast in Place Piles (dia. 400mm) Lin. Metre 1,695.00 Lin. Metre #REF! #REF!
2 04/01/1b Bored Cast in Place Piles [dia 600mm] Lin. Metre 3,852.00 Lin. Metre #REF! #REF!
3 04/01/1c Bored pile cast in place piles (dia 750 mm) Lin. Metre 6,035.00 Lin. Metre #REF! #REF!
4 04/01/1d Bored cast in place Piles (dia 900mm) Lin. Metre 8,921.00 Lin. Metre #REF! #REF!
5 04/01/1e Bored cast in Place Piles (dia 1000mm) Lin. Metre 10,491.00 Lin. Metre #REF! #REF!
6 04/01/1f Bored cast in Place Piles (dia 1200mm) - - Lin. Metre #REF!
7 04/01/1g Bored cast in Place Piles (dia 1500mm) - - Lin. Metre #REF!
8 4/1/04 High Yield Deformed Steel Reinforcing Bars Tonne 91,550.00 Tonne #REF! #REF!
9 04/01/5a Permanent steel Casing (6mm thick ,dia 400mm) Lin. Metre 6,959.00 Lin. Metre #REF! #REF!
10 04/01/5b Permanent steel casing (6mm thick,dia 600mm) Lin. Metre 10,130.00 Lin. Metre #REF! #REF!
11 04/01/5c Permanent steel casing (6mm thick, dia750mm) Lin. Metre 12,634.00 Lin. Metre #REF! #REF!
12 04/01/5d Permanent steel casing (10mm thick, 600mm dia) Lin. Metre 16,311.00 Lin. Metre #REF! #REF!
Permanent steel casing (10mm thick, 750mm
13 04/01/5e Lin. Metre 20,378.00 Lin. Metre #REF! #REF!
dia)
Permanent steel casing (10mm thick, 900mm
14 04/01/05f Lin. Metre 24,404.00 Lin. Metre #REF! #REF!
dia)
Permanent steel casing (10 mm thick, 1000mm
15 04/01/5g Lin. Metre 27,021.00 Lin. Metre #REF! #REF!
dia)
Permanent steel casing (10 mm thick, 1200mm
16 04/01/5h - - Lin. Metre #REF!
dia)
Permanent steel casing (10 mm thick, 1500mm
17 04/01/5i - - Lin. Metre #REF!
dia)
18 04/02/1a Driven Pre-cast Piles (a) 300x300mm Lin. Metre 1,656.00 Lin. Metre #REF! #REF!
19 04/02/1b Driven Precast Piles (b) 350x350mm Lin. Metre 2,163.00 Lin. Metre #REF! #REF!
20 04/02/1c Driven Pre-cast Pile (c) 400x400mm Lin. Metre 2,648.00 Lin. Metre #REF! #REF!
21 4/2/02 Driven Precast Pilot Piles Lin. Metre 536.00 Lin. Metre #REF! #REF!
22 4/2/04 High Yield Reinforcement Bars Tonne 91,550.00 Tonne #REF! #REF!
23 4/3/01 King Post Lin. Metre 500.00 Lin. Metre #REF! #REF!
24 4/3/02 Raker Piles (including Tie Bars) Lin. Metre 756.00 Lin. Metre #REF! #REF!
25 4/3/03 Precast Planks (including Reinforcement Steel) Sq Metre 2,752.00 Sq Metre #REF! #REF!
High Yield Deformed Steel Reinforcing Bars to
26 4/3/05 Tonne 91,550.00 Tonne #REF! #REF!
King Posts and Raker Piles
Load Test on Cast In Place Working Pile (Proof
27 04/04/1a Number 68,059.00 Number #REF! #REF!
Load to be specified in BoQ)50 Ton
28 04/04/1b Load test on cast in place piles (For 100 Ton) Number 115,906.00 Number #REF! #REF!
29 04/04/1c Load Test on cast in place piles (For 200 Ton) Number 195,142.00 Number #REF! #REF!
Load Test on Cast in Place Pilot Pile (Proof load
30 4/4/02 Number - Number -
to be specified in BoQ)
Load Test on Pilot Driven Pile (Proof load to be
31 4/4/03 Number - Number -
specified in the BoQ)
32 4/5/01 Bitumen Slip Layer to Concrete Piles Sq Metre 212.00 Sq Metre #REF! #REF!
Driven Bullah Piles ( Dimensions to be stated in
33 04/06/1a Lin. Metre 412.00 Lin. Metre #REF! #REF!
BoQ)(125-150mm)
34 04/06/1b Driven Bullah Pile (150-175mm dia) Lin. Metre 486.00 Lin. Metre #REF! #REF!
35 04/06/1c Driven Bullah Pile (175-200mm dia) Lin. Metre 599.00 Lin. Metre #REF! #REF!
36 04/06/1d Driven Bullah Pile (200-225mm dia) Lin. Metre 725.00 Lin. Metre #REF! #REF!
37 4/7/01 Cutting Edge (Well Shoe) Ton 110,190.00 Ton #REF! #REF!
38 4/7/02 Class-20 Concrete for RCC Well cum 11,973.00 cum #REF! #REF!
39 4/7/03 Concrete in Top/Bottom Plugging cum 10,404.00 cum #REF! #REF!
Labor for Well Sinking (Size
40 4/07/4(a) Metre 14,236.00 Metre #REF! #REF!
5000mmX10000mm) Depth 0m-6m
Labor for Well Sinking (Size
41 4/07/4(b) Metre 21,119.00 Metre #REF! #REF!
5000mmX10000mm) Depth 6m-12m
Labor for Well Sinking (Size
42 4/07/4(c) Metre 24,028.00 Metre #REF! #REF!
5000mmX10000mm) Depth 12m-18m
Labor for Well Sinking (Size
43 4/07/4(d) Metre 30,419.00 Metre #REF! #REF!
5000mmX10000mm) Depth 18m-24m
Labor for Well Sinking (Size
44 4/07/4(e) Metre 36,052.00 Metre #REF! #REF!
5000mmX10000mm) Depth Above 24m
Labor for Well Sinking (Size 4270mmX7940mm)
45 4/07/4(f) Metre 9,611.00 Metre #REF! #REF!
Depth 0m-6m
Labor for Well Sinking (Size 4270mm X
46 4/07/4(g) Metre 14,457.00 Metre #REF! #REF!
7940mm) Depth 6m-12m
Labor for Well Sinking (Size 4270mmX7940mm)
47 4/07/4(h) Metre 16,367.00 Metre #REF! #REF!
Depth 12m-18m
Labor for Well Sinking (Size 4270mm X
48 4/07/4(i) Metre 20,587.00 Metre #REF! #REF!
7940mm) Depth 18m-24m
Labor for Well Sinking (Size 4270mm X
49 4/07/4(j) Metre 24,427.00 Metre #REF! #REF!
7940mm) Depth Above 24m
50 4/7/05 Sand Filling cum 1,024.00 cum #REF! #REF!
51 4/7/06 High Steel Reinforcement Bars Ton 91,550.00 Ton #REF! #REF!
Division 5 -Structures

Change in Unit Rates


Sl. RHD Schedule of Rate Rate Analysed by the
Item Code Description. between May/2011 and
No. May/2011. Committee-June-2015
June/2015 (%)
1 2 3 4 5 6
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
1 5/1/01 Single Layer Brick Flat Soling sq. metre 416.00 sq. metre #REF! #REF!
Concrete Class as Detailed on Drawings
2 05/01/2a cu metre 7,229.00 cu metre #REF! #REF!
(Class10) (Concrete Mixer)
3 05/01/2b Concrete class-20 (Foundation) (Concrete Mixer) cu metre 9,790.00 cu metre #REF! #REF!
Concrete class - 20 (Vertical member col. pier,
4 05/01/2c abutment / wing wall,culvert etc.) (Concrete cu metre 11,421.00 cu metre #REF! #REF!
Mixer)
Concrete class-20 (Girder, cross
5 05/01/2d cu metre 13,396.00 cu metre #REF! #REF!
girder,diaphram,beam etc) (Concrete Mixer)
Concrete class-20 (Deck slab,side walk,wheel
6 05/01/2e cu metre 11,777.00 cu metre #REF! #REF!
guard,curb etc (Concrete Mixer)
7 05/01/02f Concrete class -20 (rail & post) (Concrete Mixer) cu metre 14,496.00 cu metre #REF! #REF!
Concrete Class - 25 (Foundation) (Concrete
8 05/01/2g cu metre 10,123.00 cu metre #REF! #REF!
Mixer)
Concrete class -25 (Vertical member col,
9 05/01/2h pier,abutment/wing wall,culvert etc) (Concrete cu metre 11,720.00 cu metre #REF! #REF!
Mixer)
Concrete class - 25 (Girder, beam, cross
10 05/01/02i cu metre 13,725.00 cu metre #REF! #REF!
girder,and diaphram etc) (Concrete Mixer)
Concrete class - 25 (RCC/CC Pavement work)
11 05/01/02j cu metre 12,245.00 cu metre #REF! #REF!
(Concrete Mixer)
Concrete class-30 (Deck slab, side walk, wheel
12 05/01/2k cu metre 12,778.00 cu metre #REF! #REF!
guard,curb etc (Concrete Mixer)
13 05/01/02l Concrete Class – 35 (Concrete Mixer) cu metre 20,622.00 cu metre - -100.00%
Concrete Class – 40 (Pre-stressed Girder)
14 05/01/2m cu metre 21,008.00 cu metre #REF! #REF!
(Concrete Mixer)
Concrete Class as Detailed on Drawings
15 05/01/3a cu metre - - #REF! -
(Class10) (Batching Plant)
16 05/01/3b Concrete class-20 (Foundation) (Batching Plant) cu metre - - #REF! -
Concrete class - 20 (Vertical member col. pier,
17 05/01/3c abutment / wing wall,culvert etc.) (Batching cu metre - - #REF! -
Plant)
Concrete class-20 (Girder, cross
18 05/01/3d cu metre - - #REF! -
girder,diaphram,beam etc) (Batching Plant)
Concrete class-20 (Deck slab,side walk,wheel
19 05/01/3e cu metre - - #REF! -
guard,curb etc) (Batching Plant)
20 05/01/3f Concrete class -20 (rail & post) (Batching Plant) cu metre - - #REF! -
Concrete Class - 25 (Foundation) (Batching
21 05/01/3g cu metre - - #REF! -
Plant)
Concrete class -25 (Vertical member col,
22 05/01/3h pier,abutment/wing wall,culvert etc) (Batching cu metre - - #REF! -
Plant)
Concrete class - 25 (Girder, beam, cross
23 05/01/03i cu metre - - #REF! -
girder,and diaphram etc) (Batching Plant)
Concrete class - 25 (RCC/CC Pavement work)
24 05/01/03j cu metre - - #REF! -
(Batching Plant)
Concrete class-30 (Deck slab, side walk, wheel
25 05/01/03k cu metre - - #REF! -
guard,curb etc) (Batching Plant)
26 05/01/03l Concrete Class – 35 (Batching Plant) cu metre - - #REF! -
Concrete Class – 40 (Pre-stressed Girder)
27 05/01/3m cu metre - - #REF! -
(Batching Plant)
28 5/2/02 High Yield Reinforcement Bars Tonne 91,550.00 Tonne - -100.00%
29 5/2/03 Wire Mesh Reinforcement Tonne 80,503.00 Tonne #REF! #REF!
30 5/3/01 Prestressing Wire or Strand Tonne 253,652.00 Tonne #REF! #REF!
31 5/4/01 Modification to Existing Concrete cu metre 8,603.00 cu metre #REF! #REF!
32 5/4/02 Concrete Surface Repair Works (Superstructures) sq. metre 184.00 sq. metre #REF! #REF!
33 5/4/03 Concrete Surface Repair Works (Substructures) sq. metre 246.00 sq. metre #REF! #REF!
34 5/4/04 Resin Repair Mortars Kg - Kg
35 5/4/05 Cement Mortar in Cracks Lin. Metre 50.00 Lin. Metre #REF! #REF!
36 5/4/06 Anchor and Tie Bars Tonne 2,356.00 Tonne #REF! #REF!
37 5/5/01 New and Extended Brickwork cu metre 6,421.00 cu metre - -100.00%
38 5/5/02 Brick Drainage Layer cu metre 4,031.00 cu metre #REF! #REF!
39 5/5/03 Replacement of Defective Existing brick cu metre 9,974.00 cu metre #REF! #REF!
40 5/5/04 Repointing of Existing Brickwork Joints sq. metre 440.00 sq. metre #REF! #REF!
41 5/5/05 Steel Tie Bars and Pattress Plates Tonne - Tonne #REF! #REF!
42 5/6/01 Preparation and Painting of Existing Structures sq. metre 461.00 sq. metre #REF! #REF!
43 *5/7/01 Carriage of Bridge Steelwork from Port to Site Tonne - Tonne #REF! -
44 *5/7/02 Fixing of bearings for Unit Bridging Number - Number #REF! -
Supply and Fixing of Elastomeric Bearings for
45 *5/7/03 Number - Number #REF! -
Composite Bridge Construction
46 *5/7/04 Asssembly and Installation of Unit Bridging Lin. Metre - Lin. Metre #REF! -
Installation of Steelwork for Composite Bridge
47 *5/7/05 Tonne - Tonne #REF! -
Construction.
Installation of Steel Post and Barrier Parapet to
48 *5/7/06 Lin. Metre - Lin. Metre #REF! -
Reinforced Concrete Deck Slab

Expansion Joint complete as detailed on the


49 5/8/01 Drawings in the location described in the BoQ. Lin. Metre 2,417.00 Lin. Metre #REF! #REF!
(Updated with new drawing/2014)

Bridge Deck Joint Complete as detailed on the


50 *5/8/02 Lin. Metre - Lin. Metre #REF!
Drawings.
Provision and Fixing of drainage to structures as
51 *5/9/01 Lump sum - Lump sum #REF!
detailed on the Drawings.
52 *5/10/01 Embedment of Inserts and Fittings Lump Sum - Lump Sum #REF!
Supply and Installation of Pot bearings (Size-
53 *5/12/1(a) Number - Number #REF!
500X500X72)
Supply and Installation of Pot bearings (Size-
54 *5/12/1(b) Number - Number #REF!
500X450X72)
Supply and Installation of Pot bearings (Size-
55 *5/12/1(c) Number - Number #REF!
400X300X72)
Supply and Installation of Shock Transmission
56 *5/12/02 Number - Number #REF!
units
Neoprene rubber bearing or Elastomeric bearing
57 5/13/1(a) Number 14,344.00 Number #REF! #REF!
supplying & fitting fixing, etc.
Neoprene rubber bearing or Elastomeric bearing
58 5/13/1(b) Number 16,694.00 Number #REF! #REF!
supplying & fitting fixing, (b) , etc.
Double Single Bailey Bridge or Acrow panel
59 5/14/1(b) Lin. Metre 2,151.00 Lin. Metre #REF! #REF!
(Erecting and Assembling).
Calender Hamilton Truss Bridge (Erecting and
60 5/14/1(c) Lin. Metre 9,292.00 Lin. Metre #REF! #REF!
Assembling)
Double Single Bailey Bridge or Acrow panel
61 5/14/2(b) Lin. Metre 1,579.00 Lin. Metre #REF! #REF!
(Delaunching).
62 5/14/2(c) Calender Hamilton Truss Bridge (Delaunching). Lin. Metre 6,084.00 Lin. Metre #REF! #REF!
63 5/15/01 Mobilization for railing type work, etc. Lin. Metre 1,622.00 Lin. Metre #REF! #REF!
64 5/16/01 Dismantling of deck slab, thickness 175mm. Sq Metre 4,516.00 Sq Metre #REF! #REF!
65 5/16/02 Steel Beam (W 530 x 167) Lin. Metre 10,929.00 Lin. Metre #REF! #REF!
Division 6 - Incidental

Change in Unit Rates


Sl. RHD Schedule of Rate Rate Analysed by the
Item Code Description. between May/2011 and
No. May/2011. Committee-June-2015
June/2015 (%)
1 2 3 4 5 6
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
1 6/1/01 Grouted Riprap Pavement sq. metre 1,748.00 sq. metre #REF! #REF!
2 6/1/02 Concrete Slope Protection sq. metre 1,368.00 sq. metre #REF! #REF!
3 6/1/03 Loose stone Riprap Protection cu metre 4,605.00 cu metre #REF! #REF!
4 6/1/04 Concrete Cut-Off cu metre 15,694.00 cu metre #REF! #REF!
Reinforced Concrete Culvert Pipe - Class A
5 6/2/01 Lin. Metre 3,943.00 Lin. Metre #REF! #REF!
bedding
Reinforced Concrete Culvert Pipe - Class B
6 6/2/02 Lin. Metre 1,942.00 Lin. Metre #REF! #REF!
bedding
7 *6/3/01 Manhole (Diameter to be stated in the BoQ) Number - Number #REF!
8 * 6/3/02 Catch Basin (Diameter to be stated in the BoQ) Number - Number #REF!
9 *6/3/03 Concrete Side Ditch/ U-Drain Lin. Metre - Lin. Metre #REF!
Brick Headwall to Culvert Pipe ( Pipe diameter to
10 *6/3/04 Number - Number #REF!
be stated in the BoQ)
11 *6/4/01 Concrete Kerb (as detailed on the drawings) Lin. Metre - Lin. Metre #REF!
Combined Concrete Kerb and Gutter (as detailed
12 *6/4/02 Lin. Metre - Lin. Metre #REF!
on the drawings)
Road Marking-Thermoplastic Material (indicate
13 6/5/01 Sq Metre 1,051.00 Sq Metre #REF! #REF!
if screed or spray application)
14 6/5/02 Road Marking - Road marking Paint Sq Metre 283.00 Sq Metre #REF! #REF!
15 6/5/03 Reflecting Road Studs Number 700.00 Number #REF! #REF!
16 6/5/04 Application of Ballotini Sq Metre 308.00 Sq Metre #REF! #REF!
17 6/6/01 Topsoil cu metre 248.00 cu metre #REF! #REF!
18 6/7/01 Grass Sodding Sq Metre 28.00 Sq Metre #REF! #REF!
19 6/7/02 Grass Turfing Sq Metre 28.00 Sq Metre #REF! #REF!
20 *6/8/01 Guardrail Lin. Metre - Lin. Metre #REF!
21 *6/9/01 Concrete Monument Number - Number #REF!
22 *6/9/02 Concrete Post Number - Number #REF!
23 6/10/01 Traffic Signs Number 5,521.00 Number #REF! #REF!
24 6/10/02 Sign Post Number 2,458.00 Number #REF! #REF!
25 6/11/01 Rumble strips (Bituminous Concrete Volume) cum 15,035.00 cum #REF! #REF!
Road Marking Thermoplastic Material (by
26 6/11/02 1,051.00 #REF! #REF!
spray)
Geotextile Filter Fabric (as detailed on the
27 6/12/01 Sq Metre 173.00 Sq Metre #REF! #REF!
Drawings)
Furnishing and installing Matress (as detailed on
28 6/12/02 Sq Metre 1,333.00 Sq Metre #REF! #REF!
the drawings)
29 6/13/1(a) Bullah Palisiding (150mm – 175mm) Lin. Metre 6,601.00 Lin. Metre #REF! #REF!
Bullah Palisiding (Local Bullah : 150mm –
30 6/13/1(b) Lin. Metre 4,348.00 Lin. Metre #REF! #REF!
200mm)
31 6/14/01 Mobilization for deck slab repairing work, etc. Sq Metre 688.00 Sq Metre #REF! #REF!
32 6/15/01 Concrete Guide Post (1.6 m long, 200mm dia) No. 1,529.00 No. #REF! #REF!
33 6/16/01 Concrete Kilometer Post (As per drawing) No. 6,375.00 No. #REF! #REF!
34 6/17/1(a) RCC Palisiding (4m post, 200mm X 200mm) Lin. Metre 8,129.00 Lin. Metre #REF! #REF!
35 6/17/1(b) RCC Palisiding (3m post, 150mm X 150mm) Lin. Metre 5,277.00 Lin. Metre #REF! #REF!

* Rate for this Item shall be analysed as per actual requirement