Rate Analysis RHD
Rate Analysis RHD
Assumption :
ITEM TYPE : EQUIPMENT
Recommended Rate
Sl. No. Basic Item Category Unit
2015 (Taka)
FM = 0.5 Cum 450.00
FM = 0.8 Cum 500.00
1 Sand FM = 1.0 Cum 600.00
FM = 1.8 Cum 1200.00
FM = 2.5 Cum 1700.00
2 Cement OPC Ton 10764.00
3 Reinforcement 60 grade Ton 65640.00
80/100 Penetration grade Ton 68500.00
4 Bitumen
60/70 Penetration grade Ton 73000.00
5 Brick 1st Class Per 1000 7477.00
7 Brick Chips 40mm cum 3000.00
Brick Chips <25mm cum 3000.00
Recommended Rate
Sl. No. Basic Item Category Unit
2015 (Taka)
39 Angle Iron (62.5x62.5x6mm) using 20 times lin. metre 335.00
40 Cost of wooden shutter for concrete using 6 times sq. metre 120.00
41 Nail kg 100.00
42 Admixture Liter 160.00
43 Cost of prefabricated steel shutter (using 50 times) sq. metre 827.00
44 Lifting anchorage No. 500.00
45 Sica LS 300.00
46 Hire cost of shuttering material sq. metre 121.00
Division 1 - General & Site Facilities
1 1/1/01 Maintenance and Protection of Traffic L.S. 72,575.00 Lump Sum #REF! #REF!
3 1/2/01 Supply, Erect and Remove Field Office for Engineer L.S. 225,000.00 Lump Sum #REF! #REF!
5 1/2/03 Provision of Office Equipment and Consumables Month 7,000.00 Month #REF! #REF!
6 1/2/04 Provision, Maintenance and Removal of Sign Boards L.S. 8,000.00 Lump Sum #REF! #REF!
7 1/2/05 Provision and Maintenance of Survey Equipment Month 800.00 month #REF! #REF!
9 1/3/01 Provide and Remove Site Laboratory & Equipment L.S. 300,000.00 Lump Sum #REF! #REF!
12 1/4/01 Saloon Car 1200cc Capacity Month 50,000.00 Month #REF! #REF!
14 1/4/03 Four Wheel Drive Vehicle Min. 6 seats Month 70,000.00 Month #REF! #REF!
16 1/4/05 Motor Boat min 5m length Month 15,000.00 Month #REF! #REF!
Division 2 – Earthwork