0% found this document useful (0 votes)
85 views15 pages

LMSW

This document describes how to use the direct input method in LSMW to migrate legacy data into SAP. It involves manually inputting field values into LSMW rather than recording transactions. Key steps include selecting the object and program, mapping source and target fields, uploading a file with legacy data values, converting the data, running the input program, and verifying the results in transaction MM60. The direct input method allows manually maintaining more fields compared to batch recording and is quicker for loading material master data.

Uploaded by

Houda Boussetta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views15 pages

LMSW

This document describes how to use the direct input method in LSMW to migrate legacy data into SAP. It involves manually inputting field values into LSMW rather than recording transactions. Key steps include selecting the object and program, mapping source and target fields, uploading a file with legacy data values, converting the data, running the input program, and verifying the results in transaction MM60. The direct input method allows manually maintaining more fields compared to batch recording and is quicker for loading material master data.

Uploaded by

Houda Boussetta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

LEGACY SYSTEM MIGRATION WORKBENCH

(DIRECT INPUT METHOD)


LSMW

 In last document we have learned LSMW (BATCH RECORDING).

https://www.linkedin.com/posts/chaitanya-bhangale-176457150_lsmw-legacy-
system-migration-workbench-activity-6963093911124754433-
DvaQ?utm_source=share&utm_medium=member_desktop

 Now we are going to learn LSMW by using direct input method.

Direct input method

 In this method we input all the field manually and upload the file to enter the
data
 It is lot easier and quicker to load material master using the standard direct
input method
 When we do batch input recording sometime view is not selected properly
so many company prefer to use lsmw direct input method for maintaining
material master data
 Since direct input method process is lit bit time consuming but if customer
requires to maintain more field we can manually add
 To use this method we have to know object method and program name
 Examples for direct input programs are:
 RFBIBL00 - FI
 RMDATIND - MM
 RVAFSS00 - SD
 RAALTD11 - AM
 RKEVEXTO - CO-PA

[email protected]
STEP 1 : OPEN LSMW AND ENTER PROJECT SUBPROJECT

AND OBJECT

ENTER PROJECT NAME


SUBPROJECT NAME
OBJECT NAME

STEP 2 : MANITAIN OBJECT ATTRIBUTES

Now I will maintain object method and program name in import method

[email protected]
ENTER BELOW
DETAILS FOR
DIRECT INPUT

STEP 3 : CREATE SOURCE STRUCTURE NAME.

[email protected]
ENTER
STRUCTURE NAME

------------------------------------------------------------------------------------

Now before going to enter field in step 3 we have to manually note down field
name char and char length in excel

Material
Industry sector
Material type
Material description
Basic data Base unit measure
Material group
Purchase group
Purchasing view
Material group
Storage bin
storage view
Shelf life exp date
Valuation class
Price control
accounting view
Price unit
Moving price

[email protected]
Now first we will learn how to check field name char value

1 2

GOT FIELD NAME

to get char lengh we will go to SE11

ENTER FIELD NAME

We receive info –
base unit measure field name MEINS type unit char

[email protected]
same way I maintained all information in excel file

Now we have to copy this detail and maintain manually in step 3


STEP 4 : MAINTAIN SOURCE FIELD

CLICK TO MAINTAIN
FIELD

[email protected]
STEP 5 MAINTAIN STRUCTURE RELATION

DOUBLE CLICK ON
EACH

[email protected]
STEP 6 : MAINTAIN FIELD MAPPING AND TARGET VALUE

In this step system mapped target field and source field

SYSTEM WILL MAP


EACH SOURCE
FIELD AND TARGET
FIELD

[email protected]
Now I have to mapped plant stoage location and 4 unit transaction code manually

SELECT AND CLICK


CONSTANT

SAME STEPS FOR


PLANT AND
STORAGE
LOCATION

Same for plant and storage location


Now I have to mapped which views are required I shown for accounting same for
basic , purchasing, storage

SAME AS
ACCOUNTING VIEW
FIX THE CONSTANT
VALUE

[email protected]
to maintain job description we have to maintain language
STEP 7 : SPECIFY FILE
Now to upload file first i transpose all row into column in excel and i wil maintain
material data

Now I will copy all data into notepad

DOUBLE CLICK ON
LEGACY DATA

[email protected]
STEP 8 : ASSIGN FILE
In this step we have to allow file to use we assign the file

DOUBLE CLICK

[email protected]
STEP 9 : READ DATA
In this we allow system to read the data inside file

10 RECORD FOUND
IN FILE

STEP 10 : DISPLAY DATA


IN THIS STEP SYSTEM SHOW UPLOADED DATA

IF YOU DOUBLE
CLICK YOU CAN
CHECK EACH
MATERIAL DATA

[email protected]
STEP 11 : CONVERT DATA
In this step system convert non system data into sap data

10 MATERIAL
CONVERTED INTO
SAP SYSTEM

STEP 12 : DISPLAY CONVERTED DATA


In this step we check converted data

WE CAN CHECK BY
CLICK ON
STRUCTURE

[email protected]
STEP 13 : RUN INPUT PROGRAM
To enter this data into material master we have to run program

SELECT PHYSICAL
NAME OPTION

[email protected]
LOG ERROR ZERO
MEANS OUR DATA
TRASFER IS
SUCCESSFULL

Now we can check result in material master MM60

ALL MATERIAL IS IN
SAP SYSTEM

[email protected]

You might also like