Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
161 views
9 pages
Settle
Uploaded by
Abdullah Al Shanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Settle For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
161 views
9 pages
Settle
Uploaded by
Abdullah Al Shanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Settle For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Settle For Later
You are on page 1
/ 9
Search
Fullscreen
248 SOIL MECHANICS AND FOUNDATION ENowegg. __ Hence, the settlement (AH) can be easily determined by the above equation, afte = ing C, from the consolidation test data. Compression index (C,) can also be roqa¢ ut. mated more quickly and easily without a consolidation test, and on the knowledge .,
ano co 249 5510" pnt 0.45x5 oo" = p16 S014 m=1.522m—- 15.22 em eee =15.22em Ans, “ Ca 2 9.22 A ie aioe 2 ap ta dept [ he present eit ly ‘8% and the specific gravity of eo" surface, The natural water oil of! rh gt nd clay, tM met omer table is located at 4.4. m below the ground surface. The average submerged unit ye we is 10.6 KN/m? and the unit weigh; of sand k : fH ee rolagloal evidence if le ‘ocated above the water-table is 17.2 3, Fro! 1 is normally consoli- tt terete Building that will we} on sand above the clay, is ject ase the effective over-burden yon the clay by 42 kN/m?. Esti- pene iement ofthe building. Fine sand elt s, We will first estimate the yressure (Jp’ OF Pg) coming on aie yer before the building is con- oscil "ie will consider the centre of “iy layer depth (A-A), to estimate on ditions, as shown in Fig, 9.8, wipe effective vertical pressure caused gaAis due to sand and clay both. It is egal to 12m Fig. 9.8 Py Now You for sand Yor sand = ths lor day is given as : G-1 Yous = | Fae | ho where G = 2.75, w = 0.38 But e = w . G for saturated soils = 0.38 x 2.75 = 1.045 eub for clay * 3-9 + Yous for sang % 6.8 ™ + Yor sang * 4.4m Ai) 0.6 kN/m! (given) — 7.2 kN/m3 (given) 141.045 2.045 Substituting the values in (i), we get i. Po = 8.39 x 3.9 + 10.6 x 6.8 +17.2 x 4.4 = 180.48 kN/m? "ng settlement Hq. (9.16), we have 2.75-1 15 i (73) x981= 23 «39 kim? Ay = CeHo log, Pot? 1teg Po where p, = 180.48 kN/m?, Ap = 42 kN/m? (given) Hy = clay depth = 7.8 mee ee EAI G of clay in natural condition = e, = void ratio of, ga 10d talent areas he s Also, C, is given y ee — sg) = 0.009 16-101 = ae 032478 jog, BOMEES 21.129 m = 11.23 em Hence, OH = 341.045 10 180.48 =11.23em Ans. Hence, settlement expected = 1 De Example 9.3. The following observation are recor’ on lest ona fay saturated specimen an Initial height of specimen =20m Diameter of specimen. = 75mm Specific gravity of soil grains =2.77 Water content (final) = 39% Applied pressure 0 50 100 200 400 800 ; in kN Final dial gauge 100 359 499 632 768 39 oa reading mm x 1 (a) Calculate the void ratio corresponding to each pressure increment, () Plot e-log p curve and find the compression index. ute the values of coefficient of compressibility and coefficient of volume change, for () Compt 200 kN/m? ; and 200 to 400 kN/m?. the increment of pressure from 100 to Solution. Final m.c. 0.29 Final void ratio 4p = WG = 0.89 x 2.77 = 1.08 Since consolidometer gives AH, and we have to work out ¢ (or Ae first), we use Eq. (9.10), as ‘ete AH ay ee or de= (1 +09) Initial height of specimen = 20 mm : Final height of specimen = 20 ~ 6.66* *[i.e. (766 - 100 1041 = 13.34 mm. a Usi . cued Speen nu and (i.e. at the end of the test), we can find a general relation : , which will hold good for all incremental pressure intervals. H,=13.34mm and e,= 1.08 AH = i334 (1 + 1.08) mm = 0.156 AH (where AH is in mm) as shown in column (7) of Table 9.2. Ans. e values are then coniputedoo Table 9.2 251 ee Dial gauge, wt) Wena reading mm * 10" inmm HWin'rmm!! |" becoasean Ta | $0186 xc01.(4) | (Sraih Trebt beitomy (3) (4) se | a © 259 20.00 | 9 OW 955 Oia 41 ()0.404 499 oe 16.01, eee 2 0: . 136 14.68 ee 8 o21 76 ous. 13.32 i ce a 9 (-)0.204 89s (4) 1.33 12.91 766 13.34 (0.207 table 9.2 are plotted o fgg eee ofe and p from table 9. na Semi-log pay : (QyValues ore gp, 2s shown in Fig. 99, PaPer, So as to obtain a graph yeene an peo T 0 22 For, p= 100, e= 1.496 1 For. p= 200, e 289 24 + Ae = 1.496 — 1.289 | rm S109 p= & log 200— 10g 100 19) : =—0207 0207 logjo-200. tog,.2 18) MAU 0910 OD ho t 17] = 0.688 a g 16 245 B14 3 743 1.2) fiber ila 1 — 03] ts 08) N. 0 10 20 50, 100 200 400 800 1000 Pin kN/m? (log) Fig. 9.9, Plot of e and log p tor example 9.3 (Table 9.2). Compression index C,, from this plot is obtained, as the slope of the straight line portion of curve, : : 1496-1289 _ ee Choosing any two points on this straight line, we get this slope = sr apo" = 5: 10810 F500 100 Hence, co pression index = C, = 0.688 Ans. © Coe, Vm? : f compressibility (a,). a, for increment of pressure between 100 to 200 kN/m’ Gaede. a wy, = = 20741 AP Py ~ PoSOIL MECHANICS AND Fou ATION 252 1,496 -1.289 _ 0.207 _ 9 97x 10-9 mean, i =g00-100 ~ 100 s. or low ; _. 7 where é, is the first void ratio betwe increment stages i.e. void ratio gs” b¥o of 100 kN/m? = 1.496, Tes modulus of volume change for pressure increm 200 kN/m? Mt etree -3 ‘ = 207TX10™ _ 9,83 x 10-8 mY/KN = 0.88 x 10 as = 741496 AN. An, «a, for increment of pressure between 200 to 400 kN/m? Similarly, £9 — 41 “ Pi- Po where py = 200 kN/m? and p, = 400 kN/m2 07 200 Similarly, the modulus of volume change for pressure increment between 209 to 400 kgs 4%, _ 1.06x10% : % - Thep 141.289 (9 = void ratio corresponding to py of 200 kNin? = 1 1.46 x 10% mY/KN. Ans. Example 9.4.4 uniform load of 145 kN /m? is distributed over a large area ofthe sufae of the ground. The sub-soil consists of a bed of dense sand, containing two strata of day, xh 3 m thick. The top of the upper stratum is 6 m below ground and. of the lower 21 m bets ground. The compression index for both layers is 0.35, the water content is 34%, and spetie gravity of soil grains 2.75. The sand weighs 20 kN/m* and is completely submerged. Conpit the total settlement under the load. Solution. The given soil conditions are shown in Fig. 9.10. = 1.06 x 10% m%KN. Ans, m, 1.45 kglom? ttt Sand Y= Yoat = 20 KNim> Completely submerged 21m 4)270 Using Eqn: (9.32), we have ‘To determine typ above, we should first determine C, a or ‘SOIL MECHANICS AND FOUNDATION ENGINe ia y Cy or 0.196 = GG «too s follows : o AH=m,.dp Hy la. (9.1) 1.73 em = m, x 62.5 “Xx (6 x 100 em) i m’ 1B» 4 m2 2 28 yan = 2.47 104 mi ™,* §2.5x500 ™ Further using Eq. (9.30), K=C, .m, «jy we have or K=8.5 x 10% ems; giv, 2 kN 10 ML 4) By 9.81 > 3.5 x 1010 > = C, x (2.47 x 10 ) in” mn 10 £__8.6x10 msec = 1.44 x 10-7 m%see ¥" 2.47% 10"! x 9.81 Substituting this value of C, in (i) above, we get or 144x107? m*/sec , .196 = ons (6m)? ° gg = ES soe = 3.403 x 107 see 1.44 x10 _ 3.403 x 107 = Soxamny days = 398.84 days. Ans. mple 9.6. Find the time required for 50% consolidation in a soil stratum, 9 m thick with ious strata on top and bottom. Also determine the coefficient of consolidation given that K = 10 ml sec ;e9 = 1.5, a, = 0.003 m?/kN, Time factor = 0.2. . H_9 Solution. d=5e aaa as it is draining at both ends = 4.5 m C,=?, T,=0.2, K= 10 m/sec. 5, a,=8 x 10% m”kN Using Eq. (9.32), wehave T,=—¢t 0.2 or t= too = G (4.5 my? oli) To determine C,, we have K=C,.m,.1,. (Bq. 9.30) ay +e where m, = (from Eq. 9.2) =3x193 ™ kN 1 ee 3 ie “3 1.2 x 10% m/kN 2 10 m/sec = C, x (22% 19-3 B kN a ay) ©9815GOMPRESSION AND CONSOLIDATION SETTLEMENTS 27 107° Hence, c, Taxi0-Pxogi MUsee = 8.49 x 10 msec ., 2 Now from(@, tsp = G45 mj? = 02 ___ 00" yoy a ‘0 m’ 8.49 x 10-5 — 0.2.x 4.5? x 108 = 49 Secs = 552 days. Ans. Example 9.7. A soil of specific gravity 2.65 has a moisture content of 18% when fully saturated. 1.9 cm thick sample of this soil tested in a consolidometer shows a compression of 0,050 em when the load is increased from 40 kN /sq m to 80 kN/sq m. Compute the compres- sion index of the soil. Solution. G=265, w=0.18 S = 1 (fully saturated) w.G n e= S = 0.18 x 2.65 bs e¢ = 0.477. Now, compression AH = 0.050 cm. Hy = Thickness of sample = 1.9 cm. . 4H be Now, using i a Tra’ we get 0.050 _ Ae 1.477 x 0.050 “To *Tsoai7 6 MRT 70.0389 Now, use Bq.: Ae = C, logy, 20*4? Po where p, = 40 kN/m? Ap = 80 — 40 = 40 kN/m? 40440 40 3 2.0389 _ 9 199 log 19 2 0.0389 = C, logy, C,logy2 or C, Henge, C, = 0.129. Ans. \ pam 9.8. The loading period for a building extended from July 1987 to July 1989. In uly 1992, the average measured settlement was found to be 113 mm. It is known that the ultimate settlement will be about 360 mm. Estimate the settlement in July 1997. Assume double drainage to occur. Solution. When loading is applied over a certain period of time, then all time calculations are done by assuming the middle of the construction period as datum. Thus, in this problem, the building was constructed between July 1987 to July 1989. Hence, the datum would be July 1988, All further timings would be calculated from this datum. Hence, 113 mm settlement observed in July 1992 would be after a period of 4 years from this datum (July 1988). Settlement S, after ¢, (4 yrs) = 113 mm = 0.113 m Total settlement (S i.e. AH) = 360 mm = 0.360 m Settlement in July 1997, i.e. after 9 yrs from datum = S, at t, (9 yrs) =? , O13 _ 9 arg Now, U, = degree of settlement after t, (4 yrs) time = 9 569m, = 927: or i ‘SOIL MECHANICS AND FOUNDATION ENGINEER 9 . S U, = degree of settlement after t, (9 yrs) time = 0360 = 2-778 8, Now, from Eq. (9.33), And r, =¢ U2 (for U < 0.60) T= Fos 14)? ff) x Ty, = G2.778 8.) i) (assuming U, to be $0.6; to be checked after computing 8.) _ 4, C, Cc, it . Ty = Geety Ta = ote k 2 Tt 7 gO _Ayrs yt Fert S,)? 9yts (0.314) _ f - 0814 01696 m 2.7788, \9 3 2.778 Let us check back that U, < 0.6 So Hence, the expected settlement after 9 yrs, ie. in July 1997 KY = 0.1696 m = 169.6 mm. Ans. ample 9.9.4 3 m thick clay and is underlain by an imp (which is less than 0.6, and hence our assumption at (A) is OK) layer beneath a building is overlain by @ permeable stratum ervious rock. The-coefficient of consolidation of the clay was found to be 0.025 cm?/ min. The final expected settlement for the layer is 8 cm. (© How much time will it take for 80% of total settlement to take place ? (i) Determine the time required for a settlement of 2.5 cm. (ii) What will be the settlement in 6 months ? Solution. 100% settlement = AH = 8 em 1, 0 0.008 0.031 0.071 0.126 0.196 0.287 0.403 0.567 0.848 (Engineering Services, 1984)Fr cowPRESSION AND CONSOLIDATION SETTLEMENTS, 278 80% settlement = 80% x 8 em = 6.4 em beon, = ? tise the general Bgn. (9.82) as : Cc, T= Geek where 7, for 80% settlement or consolidation = 0.567 (+ From the given values of U and T,, for U = 0.8 (80%)] max. length of drainage path full depth of clay, because it will drain only on one side, since impervious rock exists below the clay layer, and pervious soil exists above it =3m C, = 0.025 em*/min (given) Substituting the values, we got for 80% consolidation G, 0.025 em?/min Tygo)= Se (tg) or = 0.567 = IID, 5 00) = ge «eo (800cmy>* = tao = Time for 80% settlement (300)? x 0.567 = mi "ae = 1417.5 days = 3.88 yrs. Ans. (ii) Time required for 2.5 cm settlement (¢,) =? 4H, _ fl _ fa | nw. AH = T,, is a T, is time factor ort, = 216.3 days ‘Time required for 2.5 cm settlement = 216.3 days. Ans. (iii) The settlement in 6 months (i.e. 365/2 days or 182.5 days (say) Using ft, _ AM, we have 1417.5 days _ 64cm Sey 182.5days — Settlement (AH,) Settlement in 6 months (182.5 days) = AH, = 2.3m. Ans. Example 9.10. A building was to be constructed on a clay stratum. Preliminary analysis indicated a settlement of 50 mm in 6 years and an ultimate settlement of 250 mm. The aver- {ge increase of pressure in the clay stratum was 24 kN/m?, The following variations occurred from the assumptions used in the preliminary analysis : ® The loading period was 3 years, which was not considered in the preliminary analysis. i Borings indicated 20% more thickness for the clay stratum than originally assumed. (G) During construction, the water-table got lowered permanently by 1 metre. Estimate (©) The ultimate settlement a The settlement at the end of the loading period The settlement 2 years after completion of building (Civil Services, 2001) |
You might also like
CEC 210 (Civil Engineering Drawing II)
PDF
No ratings yet
CEC 210 (Civil Engineering Drawing II)
74 pages
Simple Beam Design To BS 8110
PDF
No ratings yet
Simple Beam Design To BS 8110
41 pages
Linear Measurement & Chain Surveying
PDF
No ratings yet
Linear Measurement & Chain Surveying
68 pages
2024 Summer Question Paper
PDF
No ratings yet
2024 Summer Question Paper
2 pages
Homework Chapter10
PDF
No ratings yet
Homework Chapter10
11 pages
Mix Design and Strength Properties of GPC
PDF
No ratings yet
Mix Design and Strength Properties of GPC
19 pages
Chapter 5 - Bearing Capacity Analysis
PDF
No ratings yet
Chapter 5 - Bearing Capacity Analysis
11 pages
Isolated Footing Design (BS 8110-97) : Footing No. Group ID Foundation Geometry - Length Width Thickness
PDF
No ratings yet
Isolated Footing Design (BS 8110-97) : Footing No. Group ID Foundation Geometry - Length Width Thickness
10 pages
Chapter 5 - Drilled Shaft Foundations
PDF
No ratings yet
Chapter 5 - Drilled Shaft Foundations
12 pages
CVE 530 FE Slope - Stability 3
PDF
No ratings yet
CVE 530 FE Slope - Stability 3
44 pages
Pile Foundation Part IV
PDF
No ratings yet
Pile Foundation Part IV
50 pages
CM Qssss33
PDF
No ratings yet
CM Qssss33
11 pages
Chapter 7 Stair Case
PDF
No ratings yet
Chapter 7 Stair Case
15 pages
Consolidation PDF
PDF
No ratings yet
Consolidation PDF
45 pages
Pile Example
PDF
No ratings yet
Pile Example
9 pages
Soil Mechanics Diploma in Civil Engineering Chapter 2
PDF
No ratings yet
Soil Mechanics Diploma in Civil Engineering Chapter 2
13 pages
Revision Questions: Surface Water
PDF
100% (2)
Revision Questions: Surface Water
4 pages
Lecture6 Compression Members
PDF
No ratings yet
Lecture6 Compression Members
38 pages
Unit Hydrograph Method
PDF
No ratings yet
Unit Hydrograph Method
13 pages
CH4005 2013 Lectures I Given PDF
PDF
No ratings yet
CH4005 2013 Lectures I Given PDF
108 pages
Tutorial 2 Foundation
PDF
No ratings yet
Tutorial 2 Foundation
10 pages
Piles 2019 - Assignment - MAK
PDF
No ratings yet
Piles 2019 - Assignment - MAK
5 pages
Case Study On Diff Settlement
PDF
100% (1)
Case Study On Diff Settlement
22 pages
5 One Dimensional Flow of Water Through Soils
PDF
No ratings yet
5 One Dimensional Flow of Water Through Soils
28 pages
HW 3
PDF
No ratings yet
HW 3
9 pages
Amendment No. 1 November 2014 TO Is 4326: 2013 Earthquake Resistant Design and Construction of Buildings - Code of Practice
PDF
No ratings yet
Amendment No. 1 November 2014 TO Is 4326: 2013 Earthquake Resistant Design and Construction of Buildings - Code of Practice
9 pages
Earthquake-Induced Settlement: The Following Notation Is Used in This Chapter
PDF
No ratings yet
Earthquake-Induced Settlement: The Following Notation Is Used in This Chapter
27 pages
CEC 409 EXAMi 2022
PDF
No ratings yet
CEC 409 EXAMi 2022
5 pages
Geo Tech
PDF
No ratings yet
Geo Tech
4 pages
BOQ-Single Storey House
PDF
No ratings yet
BOQ-Single Storey House
32 pages
Mass of Wet Soil and Mold (G) Mass of Can and Wet Soil (Grams) Mass of Can and Dry Soil (Grams) Mass of Can (Grams)
PDF
No ratings yet
Mass of Wet Soil and Mold (G) Mass of Can and Wet Soil (Grams) Mass of Can and Dry Soil (Grams) Mass of Can (Grams)
6 pages
Cse 314 Assignment One
PDF
No ratings yet
Cse 314 Assignment One
1 page
Field Identification of Soils
PDF
No ratings yet
Field Identification of Soils
3 pages
Foundation Engineering (Old QSN)
PDF
No ratings yet
Foundation Engineering (Old QSN)
41 pages
Stress Distribution in Soil Final Notes
PDF
No ratings yet
Stress Distribution in Soil Final Notes
22 pages
Footings 2
PDF
100% (1)
Footings 2
34 pages
TD1 Shallow Foundation
PDF
No ratings yet
TD1 Shallow Foundation
2 pages
Latest Addition To Gate Topics PDF
PDF
No ratings yet
Latest Addition To Gate Topics PDF
53 pages
Hihway Materilas Ch5 PP 137 To 166 PDF
PDF
No ratings yet
Hihway Materilas Ch5 PP 137 To 166 PDF
30 pages
Extrapolation of The 28
PDF
No ratings yet
Extrapolation of The 28
4 pages
Interaction Diagram by Dr-Ing Girma Z.
PDF
No ratings yet
Interaction Diagram by Dr-Ing Girma Z.
89 pages
Ecg353 Week 11
PDF
100% (1)
Ecg353 Week 11
83 pages
Design of Beam-Aci-11-01-05
PDF
100% (1)
Design of Beam-Aci-11-01-05
23 pages
Lecture 6 - Compaction & Consolidation
PDF
No ratings yet
Lecture 6 - Compaction & Consolidation
42 pages
Lecture 5 On Earthworks Cive 416 12.9..2022 Final
PDF
No ratings yet
Lecture 5 On Earthworks Cive 416 12.9..2022 Final
47 pages
Chapter 8 Exercises
PDF
No ratings yet
Chapter 8 Exercises
12 pages
CVE 221 Soil Mechanics
PDF
No ratings yet
CVE 221 Soil Mechanics
32 pages
Compiled Infrastructure Assignment Kaddu
PDF
No ratings yet
Compiled Infrastructure Assignment Kaddu
25 pages
ECG353 Week 10 - 11 Chapter 4
PDF
No ratings yet
ECG353 Week 10 - 11 Chapter 4
44 pages
Settlement Consolidation1
PDF
No ratings yet
Settlement Consolidation1
6 pages
40purl 1.SoilMechanics TYSExp. 2638
PDF
No ratings yet
40purl 1.SoilMechanics TYSExp. 2638
31 pages
CHAPTER 1 The Limit State Design Concepts
PDF
No ratings yet
CHAPTER 1 The Limit State Design Concepts
5 pages
Revision Questions
PDF
No ratings yet
Revision Questions
34 pages
CON4337A2TO131007BL Ch3 DynamicAnalysis
PDF
No ratings yet
CON4337A2TO131007BL Ch3 DynamicAnalysis
30 pages
Chapter 1
PDF
No ratings yet
Chapter 1
2 pages
OCW Chapter 5
PDF
No ratings yet
OCW Chapter 5
25 pages
2 - Types of Stone, Brick and Block Masonry-2000
PDF
No ratings yet
2 - Types of Stone, Brick and Block Masonry-2000
70 pages
Problems
PDF
No ratings yet
Problems
4 pages
Columns and Shear Walls Means Vertical Elements Form Work We Cane Remove After24 Hours But Slab Form Work Depend On Span Same Like This
PDF
No ratings yet
Columns and Shear Walls Means Vertical Elements Form Work We Cane Remove After24 Hours But Slab Form Work Depend On Span Same Like This
16 pages
Consolidation Last + Mohrs Circle
PDF
No ratings yet
Consolidation Last + Mohrs Circle
52 pages