00.01 - Drawing List For Package-1

This document contains a drawing list for Package-1. It includes 43 drawings organized into 9 groups. The groups cover topics like floodway gates, intake gates, settling basins, flushing gates, and arrangements for check gates and intake gates on the main canal at locations BKH 1, BKH 2, and BKH 4. Each entry includes the drawing number, group, number, drawing title, and specific drawing number.

Uploaded by

Jones
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views2 pages

00.01 - Drawing List For Package-1

This document contains a drawing list for Package-1. It includes 43 drawings organized into 9 groups. The groups cover topics like floodway gates, intake gates, settling basins, flushing gates, and arrangements for check gates and intake gates on the main canal at locations BKH 1, BKH 2, and BKH 4. Each entry includes the drawing number, group, number, drawing title, and specific drawing number.

Uploaded by

Jones
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Doc. No.

: TDL-01 DRAWING LIST : 1 2

1 Package-1

No. Group No. Drawing Tittle Dwg. No.

1 Map of Hydromechanical Works - (Package-1) 1-05-00-01


I General
2 Mechanical & Electrical works - (Package-1) 1-05-00-02

3 Floodway gate - Gate leaf type-1 1-05-02-01-1/1

4 Floodway gate - Gate leaf type-2 1-05-02-01-1/2

5 Floodway gate - Gate leaf details 1-05-02-01-1/3

II Floodway gates 6 Floodway gate - Hoists system 1-05-01-02

7 Floodway gate - Stoplog 1-05-01-03

8 Floodway gate - Lifting Beam 1-05-01-04

9 Floodway gate - Monorail crane for stoplog 1-05-01-05

10 Under sluice Gate - Gate leaf 1-05-02-01-1/1

11 Under sluice Gate - Gate leaf details 1-05-02-01-1/2

12 Under sluice Gate - Hoists system 1-05-02-02

13 Under sluice Gate - Stoplog Leaf 1-05-02-03

III Scouring Gates 14 Under sluice Gate - Lifting beam 1-05-02-04

15 Under sluice Gate - Monorail crane for stoplog 1-05-02-05

16 Upper flap Gate - Gate leaf 1-05-02-06

17 Upper flap Gate - Gate leaf details 1-05-02-07

18 Upper flap Gate - Hoists system 1-05-02-08

19 Intake Gate - Gate leaf 1-05-03-01-1/1

20 Intake Gate - Gate leaf details 1-05-03-01-1/2

21 Intake Gate - Hoists system 1-05-03-02

22 Intake Gate - Stoplog Leaf 1-05-03-03

IV Intake Gates 23 Intake Gate - Lifting beam 1-05-03-04

24 Intake Gate - Monorail crane for stoplog 1-05-03-05

25 Intake Gate - Dogging device 1-05-03-06

26 Intake Gate - Maintenance ladder 1-05-03-07

27 Intake Gate - Maintenance Steel floating trash boom 1-05-03-08

28 Settling basin Gate - Replacement of Parts 1-05-04-01

29 Settling basin Gate - Layout for washing pipe system 1-05-04-02-1/1

V Settling Basin 30 Settling basin Gate - Details for washing pipe system 1-05-04-02-1/2

31 Trailer pump cap.50 l/s - electro motor 1-05-04-03

32 Flexible Hose - For sediment Flushing 1-05-04-04

Jo
Doc. No. : TDL-01 DRAWING LIST : 2 2

1 Package-1

No. Group No. Drawing Tittle Dwg. No.

33 Flushing Gate - Gate leaf 1-05-05-01

34 Flushing Gate - Hoists system 1-05-05-02

VI Flushing gates 35 Flushing Gate - Stoplog Leaf 1-05-05-03

36 Flushing Gate - Lifting beam 1-05-05-04

37 Flushing Gate - Monorail crane for stoplog 1-05-05-05

38 Check gate Arrangement - 2.5m x 2.6m 1-05-06-01

VII Main canal - BKH 1 39 Intake gate Arrangement - 1.0m x 1.3m (Left side) 1-05-06-02

40 Intake gate Arrangement - 1.0m x 1.3m (Right side) 1-05-06-03

41 Check gate Arrangement - 2.5m x 2.3m 1-05-07-01

VIII Main canal - BKH 2 42 Intake gate Arrangement - 1.0m x 1.3m (Left side) 1-05-07-02

43 Intake gate Arrangement - 1.0m x 1.3m (Right side) 1-05-07-03

44 Check gate Arrangement - 2.5m x 2.8m 1-05-08-01

IX Main canal - BKH 4 45 Check gate Arrangement - 2.5m x 2.8m 1-05-08-02