Technical Proposal:
Sr no. Item Description Make Unit QTY Total
Price

1 5KW Inverter Infine/solarmax/ maxpower 140,000 1 140,000

Solar Panels, Mono Perc – 381,500


2 Jinko/Trina/Longi/Canadian 38,150
535Wp to 545Wp 10

Galvanized mounting frame L2 type 27,500


3 Structure for Solar Panels, GI 14 5500 5
Gauge
DC Cable, PVC 1
4 6 MM DC Cable, AC cable 27000 27,000
Pipe & other accessories

5 Distribution box with all breakers Hardware Protector breaker etc 28000 1 28,000

7 Battery (185AH) F.E 37000 0 0

8 Civil blocks F.E 500 20 10,000

9 Design, Installation & Commissioning F.E 25000 1 25,000

Financial Proposal:
Item Description Capacity Total Cost

PKR 639,000
Hybrid Solar System with net metering 5KW Solar Panels with 5KW Inverter

NOTE: Net metering, Civil and Earthing will cost additional 110,000 Rs.
Proposal Load Details – 5KW
Equipment Qty Wattage Total Wattage Surge Wattage
AC 1.5Ton Invertor base 2 1800 3600 6000
Fridges 1 450 450 1800
LED TV 1 150 150 600
Lighting Load 10 20 200 400
Fan, Exhausts 3 120 360 900
Frezeer/Water Motor 1 300 300 600
Total Load 5000 10000

Warranty:
• Solar Panel 25 Years
• Inverter: Hybrid 5 Years
• Battery: Tubular 1 Years

Terms & Conditions:


1. Payment Terms:
70% Advance, 25% on Delivery, 5% on project completion
2. Withholding tax and General Sales Tax
This offer is exclusive of all taxes including GST/PST and withholding tax.
3. Delivery Time
FAZAL ENGINEERING will ensure that the items are supplied within 2 Weeks.
4. Validity of quotation
This is open for acceptance within 5 days after the quotation is received.
In case extension of validity is required beyond this date, please contact us before the end of
validity period.
Beyond this date, the supplier is entitled to review/modify/cancel the prices and/or conditions of this
offer
5. Net Metering & Earthing
FAZAL ENGINEERING will complete their net metering paper work within one week after the
completion of the project but issuance of NEPRA license’s time depends upon their schedule.
Out of Scope
 Any Civil Work
 Any AC Cable beyond 10 ft. AC Cable will be charged as
per actual cable consumed
 NEPRA Net Metering and Meter demand notice Fees.

Pay back:
1 System cost Pak rupees 639,000
2 Monthly generation of Units (KWH) 650
3 Annual generation of Units (KWH) 7200
4 Life time generation of Units (KWH) 158,500
5 ROI (Saving over life / system cost ) 580%
6 Payback Period 2.5 years

Thanks for your Business!