Checklist For CSSD For NABH Preparation and Its Quality Indicators
Checklist For CSSD For NABH Preparation and Its Quality Indicators
Central Sterilization and Supplies Department (CSSD), has its importance in prevention of cross
infection in hospitals. An effective functioning of CSSD will reduce the HAI traceable to use of
instruments on patients’ care. For this CSSD must follow standard practices in its sterilization
and supplies operations. NABH recommends following standards to be implemented in CSSD.
Infrastructure
· The CSSD should be located in a delineated area where there is less or no external traffic
movement.
· Location of CSSD should be either close to OT or should be connected to OT with safe &
quick transfer mechanism, like dumbwaiters.
Processes:
· SOP should be documented for each activity done in CSSD. These activities include
o Procedure of cleaning
o Procedure of packing
o Procedure of disinfection
o Procedure of sterilization (separate SOP for each type of sterilization equipment)
o Procedure of storage and issue
o Safety precautions and guidelines
· A policy should be there on reusable devices/items which specifies following
o List of items that can be re-used (items not in list should automatically be considered, non-
reusable)
o Number of times it can be re-used
o On whom can it be re-used (like on same patient or on different patient)
o Processing required before reuse of the items
· Sterilization equipment must be calibrated at a regular interval. A preventive maintenance
checklist should also be available for each equipment
· Each sterilization equipment should have an identification number, which should be
displayed on the equipment
· Each pack, that is being sterilized must be labelled with following information
o Date of sterilization
o Date of expiry
o Equipment number in which it was sterilized
o Load number in which it was loaded for sterilization
· Record of each load sterilized in CSSD should be maintained. The record must contain
o Date
o Load number
o Description of contents that were included
o Temperature, pressure and time-record chart
· Validation tests must be done in CSSD. The validation tests must include
o Physical/Chemical test – should be done for each load
o Biological spore test – at-least weekly basis for each equipment
· The CSSD must maintain record of all validation test reports
· A procedure of recalling items should be there in case of sterilization breakdown.
· List of hazardous chemicals in CSSD should be available
· MSDS of each hazardous chemical should be available
Staff knowledge