Water & Sanitation Agency Multan

MULTAN DEVELOPMENT AUTHORITY

Contents
General informations Immediate priorities Water supply system (Problems & Solutions) Sewerage system (Problems & Solutions) Revenue recovery Problems Summary of Initiatives

FUNCTIONS OF WASA
TO DEVELOP PLANS, POLICIES AND PROJECTS FOR THE IMPROVEMENT AND EXPANSION OF WATER SUPPLY, SEWERAGE AND DRAINAGE SERVICES TO OPERATE AND MAINTAIN WATER SUPPLY, SEWERAGE AND DRAINAGE SYSTEMS TO GENERATE FUNDS FOR OPERATION & MAINTENANCE OF THESE SERVICES BY RECOVERY OF WATER AND SEWER TAX, FOR MAKING THE SYSTEM SELF SUSTAINABLE

GENERAL INFORMATION
Total Area Population 2005 Population Growth Population Density Male to Female Ratio 304 Km2 1.90 Million

City
Cantt.

2.97 % 7.34 % 5855 Person/ Km2


113:100

Litracy Rate
Average (Both Sex) Male Female 61 % 68 % 53 %

1. Population as per Census 1998 2. Present population in year 2005 3. Annual growth rates

= 1.50 Million = 1.90 Million = 2.97 %

4. Projected population in year 2010 = 2.105 Million. 5. Projected population in year 2025 = 3.060 Million.

2500000
Y e ar

2000000

1500000

1000000

500000

0
1901 1911 1921 1931 1941 1951 1961 1971 1981 1985 1990 1995 2000 2004 2010 2006

1900000

ORGANOGRAM OF WASA
MANAGING DIRECTOR BS-20
DY MANAGING DIRECTOR BS-19 DIRECTOR ADMN & FINANCE BS-19 Dy Dir Adm BS-18
Ast Dir Adm BS-17

DIRECTOR WORKS
BS-19 Dy Dir Sew (N) BS-18
Ast Dir Const BS-17 Ast Dir Maint BS-17 Ast Dir Maint BS-17

DIRECTOR RECOVERY (Vacant) BS-19 Dy Dir Rec H/Q BS-18


Ast Dir Comp BS-17

DY DIRECTOR P&D
BS-18

Dy Dir Fin BS-18


Ast Dir Fin BS-17

C H Draftsman BS-17 Asstt Dir P&D BS-17

Dy Dir Rev BS-18


Ast Dir Accounts BS-17 (Vacant) Ast Dir Rec (N) BS-17 Ast Dir Rec (S) BS-17 Tehsildar BS-16

Dy Dir Sew (S) BS-18


Ast Dir Const BS-17 Ast Dir Maint BS-17 Ast Dir Maint BS-17

Dy Dir WS BS-18
Ast Dir Const BS-17 Ast Dir Maint BS-17

Dy Dir DS
BS-18

BS-18

SSM

Ast Dir Mech BS-17 Ast Dir Elect BS-17

Police Staff

Provide efficient water & sanitation services to the entire population of Multan City in a minimum possible time

Mission of the WASA Multan is to be a Customer Oriented Organization, providing Excellent Water and Sewerage Services in a cost effective, environmentally & socially responsible manners.

Removal of outstanding problems of sewage overflow and elimination of sore points. Rehabilitation/up-gradation of existing sewage Disposal Stations and Water Works. Rehabilitation/up-gradation of existing water distribution network. Improve recoveries sustainability for financial

Multan City is fortunately situated on the left bank of river Chenab and its acquifers are recharged by the fresh water. Shujababd Canal is located at west whereas Nau Bahar distributory is located at East side of the city, both recharging the acquifers. Hence fresh water is abundantly available in the underground with TDS ranging from 500 to 900 mg/l at a depth of 35 to 45 ft. However shallow water is contaminated in most of the areas of this city. About 60% area is covered with piped water supply system whereas 40% area is still unserved.

WATER SUUPLY NET WRK


N

CANTONEMENT

98 23

INSTALLED TUBEWELLS

OVER HEAD RESERVOIR

EXISTING INFRASTRUCTURE
01 02 03 04 Length of water supply lines Diameter range Material of pipe lines No of Tube wells i ii iii iv v 05 Installed in year 1964-76 Installed in year 1980-90 Installed in year 1990-95 Installed in year 1995-2000 Total Abandoned In working condition (229 cusecs) Over-head reservoirs i ii useable Abandoned 17 06 38 29 16 15 98 38 60 847 Km 2 to 24 C.I, G.I, AC and PVC

COMPLAINT CENTERS
S# 01 02 Name of the center Divisional Sub-Divisional-A Location Shamsabad Water Works Lohari Gate In Charge Deputy Director
(WATER SUPPLY)

Contact # 9201087 9200151

Assistant Director-I

DETAIL OF COMPLAINTS WATER SUPPLY DIVISION


The average of complaints received during a month in the area of relevant Section is as under:NO OF S# AREA COMPLAINTS 01 Sub-Division-A, Section-1 413 02 Sub-Division-A, Section-2 03 04 05 06 07 08 Sub-Division-B, Section-1 Sub-Division-B, Section-2 Sub-Division-B, Section-3 Sub-Division-C, Section-1 Sub-Division-C, Section-2 Sub-Division-C, Section-3 Established Recently 28

The complaints received are rectified through the morning gangs. Emergency squad also exists in the Division to rectify the complaints received in the day time. The balance complaints are rectified through the other gang, which is also used for leakage and punctured lines

PROBLEMS
Lack of master planning of Water supply system. The old pipe lines 177 Km in length are more than 30 years old and has been rusted and damaged badly. Water quality problem due to out lived distribution lines. More than 38 tube wells are abundant after completing their design life, needs rehabilitation or replacement. Detection of illegal connections due to shortage of staff resulting in less revenue as compared with electricity charges. Poor maintenance due to less collection of revenue. Un-metered water supply resulting wastage of huge

quantity of water.

Preparation of Multan Master Plan to assess current and future needs of the expanding city is planned. 177 km outlived Water supply lines is being replaced under CM Gastroenteritis Program. All the legal water supply connections at the consumer end are being replaced under CM Programme to avoid contamination of water. OHRs are being rehabilitated under CM programme to maintain the pressure during peak hours. Water bouzers (4) are being procured for water supply in case of any emergency. All the connection are being metered to stop the wastage of drinking water. Almost 40% city area is un-served, planned to be covered under CM big cities package in next 3 years. According to lab test conducted by WASA, the Arsenic contents in Golden Pumps installed by the Public at their own at the depth of 80 ft are beyond the permissible limits set by WHO where as the TW installed by WASA 350-450 ft are with in permissible limits of WHO. However re testing is being carried out by using the arsenic kit. Water testing lab is being setup for quality assurance. Water supply from the TW is being chlorinated to make the drinking

PROPOSED SOLUTION

IN

MULTAN CITY

The Water Supply and Sewerage facilities have not been developed according to increase in population due to constraint of resources. As such the gap between supply and demand has been widened. As Sewerage System was not developed and renovated properly in the past, hence Sewerage problems went on intensifying day by day resulting in overflowing of sewers in covered area. Waste Water ponding was created in covered as well as uncovered area. In uncovered area people are using soakage pits. All these factors have contaminated the sub soil water lying at depth of 35 to 45 ft and hence all shallow water sources being used by people are contaminated, giving rise to water borne deceases. Present sewerage coverage is 55% of the city.

Shalimar Colony

Nawab Pur Road

Naqshband Colony

N
MDA NISHTAR MEDICAL CANTT.

Income Tax Colony Zakaryia Colony

TO

AL W NE A KH

Bosa n Ro ad

RASHIDABAD BAHAUDDIN ZAKRIA

PEOPLES COLONY

MULTAN
RAILWAY STATION

SHAH RUKNE ALAM

LEGEND
PHASE- I (1973-84) Trunk PHASE- II (1982-90) Lateral PHASE- III (1985-88) Trunk PHASE- IV (1990-94) Lateral PHASE- V (1999-01) Trunk Low Lying Area

OAD BAHAWALPUR R

AD RO R PU A NY DU CHAMPUR DISTI.

Others
Laid during 1926-56
R PU ID M A H

R O N I M

S AS P BY

ab Roa Pur d

Bosa n Roa d

Sullage Carrier
Na w

MODEL TOWN

WAPDA TOWN

BY PASS

Sha BOSAN ROAD limar Colony

Bosa n Roa d

WWTP

Suraj Miani
27

24

3 6

18

24

18

N IS H T A R M E D IC A L CANTT.

24

66

42

18
18

M ULTAN
R A IL W A Y S T A T IO N
27 18
36

B A H A U D D IN Z A K R IA 4
18
2
18
18

48

42

18

24

27

24

21

18

18

36

72

New Multan DS

TO

AN

EW

To

La

e or h

MDA

Chungi # 9 DS A S H ID A B A30 R D 60

18

PEOPLES COLONY
Sameejabad
Rai o yT lw a ore Lah

24

36

36

36

24

60

Wahid Abad Farooq Pura


18
60

Abbas pura

42

24

48

30

36

Old Shujabad Rd

ID

IN

r rrie Ca ge New Shah Shams lla Su


S PA S

60

48

42

To Budhla

Vehari Rd

To

AD BAHAWALPUR RO

AD RO R PU A NY DU CHAMPUR DISTI.

Ve

ha

ri

BY

WWTP

Existing Sewers Existing Disposal Works Proposed Disposal Works Proposed Sullage Carrier Proposed WWTP

LEGEND

WWTP

LENGTH OF SEWER LINES

SEWER MAINTENANCE

TRUNK SEWERS
18 TO 72 DIA

Km

MANPOWER
SEWERMEN

NOS

164 864 1028


2056 291 1765

291

LATERAL SEWERS
6 TO 15 DIA TOTAL
Sewermen Required as per yardstick Sanctioned posts. Shortfall.

SEWER CLEANING MACHINERY


FLUSHING MACHINES CESSPOOL EMPTIER DEWATRING SETS WATER LORRIES DIESEL DRIVEN 2 &4 CS DEWATERING SETS 05 05 37 02 04

NORTH ZONE
CANTT

SOUTH ZONE

Assistant Director

Complaint Centre
Gulgasht Colony W/W Ph # 9210157 Eid Ghah W/W Ph # 9200154

Area /UC No.


1,2,4,5,40, 41,43,44,53 3,6,15,17,18,43,44,55,54 & 56 7,8,9,10,11,12,13,14,15, 54 & 58

Sewer men

DEPUTY DIRECTOR SEWERAGE (NORTH ZONE)

AD-I AD-II AD-III AD-I AD-II AD-III

45 52 52 56 46 56

DEPUTY DIRECTOR SEWERAGE (SOUTH ZONE) Hassan Parwana 24,27,29,36,37,38,39,42, W/W Ph # 9200152 52, 127 & 129 Willayat Abad W/W 26,28,29,30,31,32,33,34, Ph #. 4231490 35 & 48 12 (SRA Block ,D,E,F,G & H), 13 (SRA Block A,B Mumtaz Abad W/W & L) , 14 (SRA Block J, I & K) 15 (Karam Pura & Ph #. 6529858 Sharif Pura) 16,19,20,21, 22,23,25 & 26

1080km / 307=3.5Km/sewerman

SORE POINTS/ PROBLEMS IN NORTH ZONE


Design period of laid trunk sewer of Bosan road was upto 1990. Presently it is surcharged and require rehabilitation and due to surcharged sewer following abadies are effected; New Gulghasht, extension Gulghast, Sadiqia Road, Kahkshan Street, Shalimar Colony, Sabza Zar Colony and Nasheman Colony etc. The Chungi No.9 Disposal is over charged and affects the following roads and adjoining areas.

Masoom shah road sewer is being trapped at Chungi #9 through Hamayun Road which is partially operated due to crown failure. Hafiz Jamal Road is also over charged due to partial flow of Humayun road Similarly Shah Shamas road, Hussain Agahi Road, Circular Road are also over charged along with adjoining areas i-e Ashraf Abad, Bawa Safra & Hathar Road etc.

SORE POINTS/ PROBLEMS IN NORTH ZONE


Sewer at Nawab Pur Road was laid in 1975-76 and it has completed its design life. Sewer at Jameel Abad road from Chungi No. 1 to pull Wasil is not properly functioning which cause over flow at Kotla Waris Shah and Bismillah Colony etc. Sewer at Suraj Miani Road from UBL Chowk to Pull Wasil has completed its design life and due to crown failure at Suraj Miani road near Shia Miani, affecting Basti Dhore Kot. In the eastern side, Khadim Abad and Mehria Colony at LMQ road near Pak Arab Factory are affected due to under size sewer (9 & 12 i/d) and require replacement. Sameejabad Abad sewerage system was laid by PHED 20 year back but due to improper functioning of D/Station, the system is chocked and require replacement of trunk sewer due to increase in population.

SORE POINTS/ PROBLEMS IN NORTH ZONE


Some streets of Katchi Abadies with in New Multan like Chah Kotwal Wala, Basti Faiz Abad and Ghaus Pura are not working properly causing overflow of sewer. Sewerage system laid by MCM, Local Govt in National Colony, Kazmi Colony and Chah Korey Wala has been silted up due to improper slopes & haphazard extension of sewer causing over flows. Areas like Tareen Colony, Al Noor Colony, Al-flah Colony in North West side are still unserved.

SORE POINTS/ PROBLEMS IN SOUTH ZONE


Sewerage system from Kalma Chowk to Aziz Hotel Chowk via Dera Adda including Hassan Perwana Road, Azmat Wasti Road, Abnad Road is over charged due to under size sewers. From Kirri Jamandan Disposal Station to Chowk Shaheedan including Shaheen Market, Sotri Wat road, Ganna Mandi, Tipu Sultan Colony, areas are surcharged due to excessive flow of sewage. Khatkana road, Ghulam Abad, Bhatta Jan Muhammad Road, Mehboob Colony, Bhuta Colony near Timber Market, Chah Ganja Wala, Abbas Pura, Hassan Pura, madina Colony, Nazim Abad, Chah Ghulam Muhammad Wala, Fiaza Abad, Pir Colony No.1, Boad Pur Road from Chungi No.22 to Bilal Chowk are also under surcharge condition Mumtazabad, Chah Chali Wala, Gulzeb Colony, Mehmood Abad, Al-Qayyum Town, Peer Bukhari colony are in surcharged condition. Rukne Alam Block E, H, L, K are also over loaded.

PROPOSED SOLUTION
Overcharging of Bosan road , New Gulgasht and adjoining area of Bosan Road will be solved by const: of New Disposal Station at Bosan / Nawab Pur Road under SPBUSP with in 2 years. Overcharging of Masoom Shah Road, Hafiz Jamal road, Shah Shams Road, Hussain Agahi will be solved by laying of sewer from Chungi #.9 to Manzoor Abad Chowk and Tareen Colony, which is in progress & will be completed by June 2008. Problems in Sameejabad, New Multan, Qaiser Abad, Hassan Abad, Mehria Colony etc will be solved by Construction of Disposal Station at Sameejabad & replacement of old sewers under SPBUSP. Work allotted recently and shall be completed by Dec. 2008. The sewer problem in National Colony, Kazmi Colony, Chah Korey Wala will be solved under CM Package for Large Cities Priority -II which has been principally approved.

The basic sewerage problem in Multan City is Intermediate pumping stations i.e., Kirri Jamandan & Chungi No.9, as the sewage is lifted from these stations re-pumped to Vehari Road and Suraj Miani Disposal Works causing ponding of sewage during rainy season as the catchment area of main disposal is drained out 1st and after that catchment areas of Intermediate pumping stations are drained out. This problem is being solved by making the Intermediate pumping stations independent under the Scheme Rehabilitation /Improvement /Up gradation of existing pumping stations. Following areas will be benefited Masoom Shah Road, Hafiz Jamal road , Bosan Road, Nwab Pur Road, Shaheen Abad, Bohar Gate, Haram Gate, Tipu Sultan Colony, Khuni Burj etc. About 0.4 million population shall be benefited after implementation of this scheme after June, 2008 provided funds for CM Big city package are released as per commitment. Problem of New Shadab Colony, Tareen Colony, Al Noor Colony, Al Falah colony is being solved by laying of sewer(18 to 54) from Chungi #.9 to Manzoor Abad Chowk and Tareen Colony by June 2008.

PROPOSED SOLUTION

WATER & SANITATION AGENCY MULTAN

27 Nos schemes are principally approved under Chief Ministers package for Large cities, in which Rs.3.5 Billions are provided for the improvement of Multan city. This will help in-improving the Environment conditions. Following are schemes: the main components of the

UP-GRADATION OF EXISTING DISPOSAL STATIONS. REHABILITATION OF EXISTING SEWERAGE & WATER SUPPLY SYSTEM. EXTENTION OF WATER SUPPLY & SEWERAGE SYSTEM TO THE UN-SERVED AREAS. PROCUREMENT OF SEWER CLEANING MACHINERY. REPLACEMENT OF 177 KM OF OUT LIVED WATER SUPPLY LINES. REHABILITATION OF EXISTING O.H.RS. PROCUREMENT OF 4 No WATER BOUZZERS. ESTABLISHMENT OF WATER TESTING LABORTARY.

ADP- YEAR 2006-07


S # A D P # Name of Scheme Estimate d Cost Expen d upto June 2006 Revise d Alloca tion 200607 Fund s relea se by FD

Utiliz ation

%age utiliz ation Oon Relea se

Total cummulati ve expenditu re till 254,07

Physical Progress (%age)

ON GOING SCHEMES

7 9 5

Improvement of Water Supply & Sewerage Scheme in Multan City Rehabilitation of existing Water Supply System in Multan. Rehabilitation / Improvement / Up-gradation of Existing Pumping Stations.

257.220

208.815

21.167

21.167

21.167

100

229.982

96

7 9 6

44.180

23.000

15.850

15.850

11.423

72

34.423

81

7 9 7

777.869

100.000

261.417

261.41 7

132.80 1

51

232.801

40

Total on Going Schemes

1079.27

331.815

298.434

298.434

165.39

55

497.206

ADP- YEAR 2006-07


S # A D P # Name of Scheme Estimat ed Cost Expend upto June 2006 Revised Allocati on 2006-07 Funds release by FD

Utiliz ation

NEW ADP's SCHEMES 4 7 9 8 Replacement of Sewer From D/S Chungi No.9 to Manzoor Abad Chowk Via Afshar Chowk, Jamal Pura Colony Multan. Laying of sewer 48 & 72 i/d from Chungi # 22 to Old Shujabad Disposal Station and sewer for Adjacent Area Laying of Sewer Lines from Sultan Colony to Disposal Station Vehari Road, Multan.

%ag e utiliz ation Oon Rele ase

Total cummulativ e expenditure till 25-4,07

Physi cal Progr ess (%ag e)

99.910

0.000

25.40

25.400

2.625

10

2.625

22

7 9 9

122.284

0.000

32.00

32.000

12.320

39

12.320

45

8 0 0

72.340

0.000

15.00

15.000

15.000

100

15.000

62

Total New Schemes Grand Total (On- Going + New Schemes)

294.53 1373.80

0.000 331.815

72.400 370.834

72.400 370.834

29.945 195.34

41 53

29.945 527.151

PROPOSED ADP SCHEMS YEAR 2007-08 (MTBF- MODE 2007-2010)


City Population % age Share of both MDA & WASA On-Going New In Million

Multan

1.119

10.36

310.747

217.523 93.224

ON GOING ADP SCHEMS YEAR 2007-08 (MTBF- MODE 2007-2010) In Million


GS# Name of Scheme
Cost 257.22 44.180 777.869 99.910

Provision for 2007-08 12.238 5.330 100.000 30.00

Improvement of Water Supply & 795 Sewerage System in Multan City. (250.00 Million). 796 797 798 Rehabilitation of existing Water Supply System Rehabilitation / Imp: -up-gradation of 4 Nos main pumping station Laying of Sewer line from Chungi # 9 D/S to Afshar Chowk

Laying Sewer 48 i/d & 72 i/d sewer from Chungi No.22 to old Shujabad 799 Disposal Station and sewer for adjacent area. 800 Laying Sewer line from Sultan Colony to Disposal Station Vehari Road Total

122.284

35.000

73.340 1374.803

34.955 217.523

PROPOSED NEW ADP SCHEMS YEAR 2007-08 (MTBF- MODE 2007-2010)


S#
1 2 3 4 5 6

Name of Scheme
Master Plan of water supply & Sewerage system -updating of consumers survey i/c uplift of computer cells (Billing & P&D) Rehabilitation /Replacement of life expired sewers. (North Zone) Rehabilitation/Replacement of life expired sewers. (South Zone) Additional pumping machinery for enhanced load at Disposal Stations Sewer laying machinery for Rehabilitation work Rehabilitation of existing tube well & allied works. Total WASA Total UD Wing Total Share

Cost 35.00 200 200 135.835 50 100 720.84 2094.67

Provision for 2007-08 3.224 5.00 15.00 7.00 4.00 4.00 38.224 255.75 55.00 310.75

In Million

RECOVERY
100 120 20 40 60 80 0 1996-97
3 14 .4 53 7. 28

1997-98
15 .3 31 23 .1 1 31

1998-99

1999-00

(RS. IN MILLION)

2000-01 YEAR 2001-02 2002-03 2003-04 2004-05 2005-06

.9

48 39 .7

07 46 .6

8 84

REVENUE RECOVERY OF WASA

.9 82

.7

2 96

.2

FINANCIAL CRISIS IN WASA (MDA) MULTAN.


Number of consumers Water Supply Sewerage Drain Average monthly billing amount Average per month recovery 156297 35283 109518 46779 12.34M 09.00

Million Rs.

Target
2006-07

Target

Recovery

%age

Upto 30-04-07 91.218 89

123.595 102.995

REASONS FOR LOW RECOVERY.


Non establishment of proper recovery cell. Now the directorate has been established as per decision of Governing body dated 30-7-2005 but new recruitment is still to be made. Case is

pending with the Government for lifting of ban through summery for CM vide dated 29-9-2005. The only way to bring the defaulters in network is to touch the maximum defaulters through disconnection teams. For this

purpose four vehicles / disconnection teams were already working in the field. To improve the recovery and to touch maximum defaulters, eight more Disconnection Teams have been established. To mobiles the Disconnection Teams eight vehicles have been hired on daily basis. WASA is facing shortage of vehicles and staff.

REASONS FOR LOW RECOVERY.


Post of fulltime Tehsildar Recovery is vacant since 7-1-2004. All arrears of WASA dues are required to be recovered through Tehsildar recovery. Full time Tehsildar Recovery in WASA may be posted immediately. Post of Senior Special Magistrate is vacant since 1-7-2005. Full time Senior Special Magistrate may be posted immediately in the interest of recovery. NESPAK conducted survey of WASA consumers in 1998-99 which has become out dated. A lot of changes in the activities have taken place. To overcome this situation survey after every three years is required but due to shortage of staff and funds it could not be done by WASA. Indulgence / Interference of Nazimeens / Naib Nazimeens in the recovery process from the defaulters. Non co-operation by WASA consumers to pay user charges.

Shortage of Police force for Summons, Challans and Disconnection teams. WASA experienced privatization of recovery in the year 2004 on following terms: A B C D E F First month 2nd month 3rd month 4th month 5th month July to on ward 60-Lacs 65-Lacs 70-Lacs 75-Lacs 80-Lacs 92-Lacs (due to after increasing of new tariff)

Every year 10% increase was fixed in case contract is extended after on year. Service was fixed as the following rates: A) B) C) Below 60-Lacs From 60 Lacs to 80 Lacs Above 80-Lacs Nil 08% 09%

The contractor M/S S.T Associates tried its best to achieve the target but count not succeeds and his contract was cancelled due to pure performance and earnest money was forfeited. His performance during contract period remained as under: MONTHS NAME April-2004 May-2004 June-2004 July-2004 TARGET 60-Lacs 65-Lacs 70-Lacs 75-Lacs RECOVERY 55.20-Lacs 59.80-Lacs 64.40-Lacs 69.00-Lacs SHORT FALL 4.80-Lacs 5.20-Lacs 5.60-Lacs 6.00-Lacs

Performance of One Window Operation


N

2359 modifications from 1-3-2007 to 3004-2007

STATUS OF DETECTION OF ILLEGAL & NEW CONNECTIONS FROM 1-03-2007 to 30-04-2007


Illegal connections detected New connections 1245 80

Proposed Improved Customer Care Centres


Lohari Gate waterworks Shamasabad Mumtazabad Eid Gah Chowk Gulgashat colony New Multan Willatabad Hassan Parwana

Summary of Initiatives
Establishment of proper offices & complaint centers of WASA. Designs for complaint centres & offices of WASA are under preparation. Renovation of existing office of WASA. Purchase of vehicles for recovery cell to strength the cell. Identification/inventory of Assets/ property of WASA. Steps are taken to improve the recovery by efforts to recruit the staff against vacant post. Summaries moved for appointment of staff (Technical) against vacant posts.

Summary of Initiatives
Zoning of Water supply system to improve the services rendered by WASA. Acceleration of Development works. Purchase of safety equipments for sewer men. Establishment of quality control cell. Computerization of all the data regarding WASA. Detection of illegal connections. Public being motivated to use water service of WASA. Media campaign being finalized. Monsoon contingent plan prepared. .

Summary of Initiatives
Desilting of sewers in progress. Water quality monitoring system is being established. Recovery through PSP, necessary documentation under preparation. Installation of meters. Bulk meter- Installation is in progress. Domestic meter PC-I with District Government for funding. Staff being motivated (Incentives, streamlining promotions etc.).