01-Primary Cementing Overview
01-Primary Cementing Overview
01-Primary Cementing Overview
Date
CONFIDENTIAL
OBJECTIVES
Purpose:
o Prevents washing out under the rig
o Provides elevation for flow nipple
oCommon sizes :
o 30” - 20” (welded) in 36” – 24” hole
o 20” - 16” (threaded) in 24” – 20” hole
o 10 to 150 m (< 30 m common)
Not always drilled and cemented to surface :
oHammering or jetting
CONDUCTOR PIPE
Other Remarks:
o Plugs not used
o Thru-drill pipe cementing common
o Careful pumping practices (losses)
o Large excess required (300%)
o BOP’s unusually connected
o Common cements
o Accelerated Lead & Neat or just accelerated Neat
THRU-DRILL PIPE CEMENTING
Technics and Tools :
oKey Points:
o Reduced cement contamination
o Channelling
o Reduced displacement
o Pump until cement to surface
o Less cement
o Reduced job time
o 2 Procedures /
THRU-DRILL PIPE CEMENTING
Purposes:
oProtects surface fresh water formations
oCases off unconsolidated or lost circulation areas
oSupports subsequent casing strings & wellhead
oProvides primary pressure control (BOP support)
oMust withstand eventual kicks
Common sizes and depths:
o20” – 16” threaded in 24” – 20” hole
o30 to 1000 m and even deeper
SURFACE CEMENTING
oCemented to surface
o Excess of 100% plus not uncommon
oLow formation frac pressure
o Low density fluids
oRecommend thru-drill pipe or Inner string technique to save
o Cement
o Rig time
oCommon cements:
o Lead light weight slurries with high yields
o Neat tail slurries with good compressive strength
o Reduce WOC to a minimum with accelerators
SINGLE STAGE PRIMARY CEMENT JOB ( 2 PLUGS)
13
STAB-IN CEMENTING TECHNIQUE
Float collar
Float shoe
Rotary table
Rig Floor
Mud Outlet
Annular Preventor
Choke Line Kill Line
BLIND RAMS
SHEAR RAMS
PIPE RAMS
o Cementing technique
o Cemented to previous casing shoe or to surface
o Single stage (2 plugs)
o Two stage jobs common or Specialised Lightweight cements
o Plugs, casing equipment, casing accessories usual
o Good cementing practices are required
o Large cement volumes
o Common Cements:
o Typically filler slurries followed by high compressive tail
o Specialised (lightweight, heavyweight, salt cement, etc…)
TWO STAGE CEMENTING
oKey Points:
o Separation and isolation of zones
o Reduces hydrostatic Stage
Collar
o Can leave uncemented zone in the annulus
(cement at TD and at surface)
1st Stage
TWO STAGE CEMENTING
1 2
3
CEMENT THROUGH THE LIFE OF THE WELL
▪ Squeeze operations
– Fill annulus to raise top of cement
– Plug perforations to control water production
– Repair corroded casing
Oil
• 8 Round
• Seals on threads
• Buttress couplings
• Seals on threads
• VAM couplings
• Seals on threads & shoulder
• Hydril couplings
• Seals on threads & shoulder
• Integral couplings
• 2 sets of threads
FLOAT SHOES
Avoid contamination
Option :
Flexible Latch-In
Plug
oPurpose :
o Assist in centering the string to assure
mud removal and good isolation
o Facilitate casing running
o Allow casing reciprocation or free pipe
rotation
Differential sticking
Weatherford
Cementing Equipment
Cement Job Procedures
EQUIPMENT ON-SHORE
Batch Mixer
Diesel Engine
Bulk Plant
Silos, WBB, Compressor,
Dust Collector
EQUIPMENT OFF-SHORE
Batch Mixer
Slurry Mixer
JOB MONITORING
▪ Density
▪ Flow Rate
▪ Pressure
21
CEMENTING HEADS
oSeparate fluids
oWiping casing
oSurface indication
of placement
Quick coupling
oSeparate fluids
oWiping casing
Bottom Plug
Top Plug
(Hollow Inside)
(Solid)
38
LINER : DARTS & PLUGS
oPre- job
o Check calculations : co-man & cementing engineer
o Check materials
o Rig up
o Maintenance on equipment
o Safety and organization meeting
o Prepare mix fluids, spacers and washes
oWell operation
o Run Casing at TD
o Intermediate circulations
o Mud circulation and conditioning
oCement job
RUNNING CASING
oInspection of Casing
o Tuboscope
o Pipe tally, rabbit and calliper
oHole Preparation
o Mud condition
o Clearance
oRunning
o Casing crews
o Too fast
o Intermediate circulations
o Landing Casing
o Nippling up
THE CEMENT JOB
Test lines
Load plugs
Resume mud circulation
Pump washes
Drop bottom plug
Pump spacer
Mix and pump cement
Drop top plug
Displace and control returned volumes
Bump plug and check returns
Pressure test casing if required
WAIT ON CEMENT – EVALUATION
• Cement evaluation :
Logging