0% found this document useful (0 votes)
184 views2 pages

Esd Check Sheet Rev 3

This document is a daily checklist for electrostatic discharge (ESD) parameters at different work areas including panel inspection, software loading, main board preparation, and repair stage. The checklist monitors leakage voltage, resistance between electrical ground and ESD, resistance of ESD wires, and surface resistivity of floors to ensure safe ESD levels. Operators are required to wear antistatic gloves and aprons and ionizers are checked to be dust-free and airflow is working. Tables and trolleys must be grounded by chain and ESD mats kept in good condition.

Uploaded by

prabu c
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
184 views2 pages

Esd Check Sheet Rev 3

This document is a daily checklist for electrostatic discharge (ESD) parameters at different work areas including panel inspection, software loading, main board preparation, and repair stage. The checklist monitors leakage voltage, resistance between electrical ground and ESD, resistance of ESD wires, and surface resistivity of floors to ensure safe ESD levels. Operators are required to wear antistatic gloves and aprons and ionizers are checked to be dust-free and airflow is working. Tables and trolleys must be grounded by chain and ESD mats kept in good condition.

Uploaded by

prabu c
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

DAILY ESD CHECK SHEET

Dixon FORMAT NO:- TLTV-FAQ-823-FT-003


Month&Year :- REV: 3
Line: Issue Date 31/7/2018
SL.NO AREA/
PARAMETER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
LOCATION

1) Leakage Voltage <2Volt (in volts)

2) Resistance between Electrical Ground &


ESD <0.4M ohm ~10M ohm
Panel 3) Leakage Voltage Between Electrical Ground
1
inspection & ESD ( <2Volt ) (in Volts)
4) Resistance of ESD wire.(1M ohm +/-10%) (in
M ohm)
5) Surface resistivity of floor. (10^7 to 10^9
ohm) (in ohm)

1) Leakage Voltage <2Volt (in volts)

2) Resistance between Electrical Ground &


ESD <0.4M ohm ~10M ohm
Software 3) Leakage Voltage Between Electrical Ground
2
loading & ESD ( <2Volt ) (in Volts)
4) Resistance of ESD wire.(1M ohm +/-10%) (in
M ohm)
5) Surface resistivity of floor. (10^7 to 10^9
ohm) (in ohm)

1) Leakage Voltage <2Volt (in volts)

2) Resistance between Electrical Ground &


ESD <0.4M ohm ~10M ohm
Main board 3) Leakage Voltage Between Electrical Ground
3
preparation & ESD ( <2Volt ) (in Volts)
4) Resistance of ESD wire.(1M ohm +/-10%) (in
M ohm)
5) Surface resistivity of floor. (10^7 to 10^9
ohm) (in ohm)

1) Leakage Voltage <2Volt (in volts)

2) Resistance between Electrical Ground &


ESD <0.4M ohm ~10M ohm
Back cover 3) Leakage Voltage Between Electrical Ground
4
preparation & ESD ( <2Volt ) (in Volts)
4) Resistance of ESD wire.(1M ohm +/-10%) (in
M ohm)
5) Surface resistivity of floor. (10^7 to 10^9
ohm) (in ohm)

1) Leakage Voltage <2Volt (in volts)

2) Resistance between Electrical Ground &


ESD <0.4M ohm ~10M ohm
REPAIRING 3) Leakage Voltage Between Electrical Ground
5
STAGE & ESD ( <2Volt ) (in Volts)
4) Resistance of ESD wire.(1M ohm +/-10%) (in
M ohm)
5) Surface resistivity of floor. (10^7 to 10^9
ohm) (in ohm)

1. No Dust allowed in ionizer teeth in line and


repair stage.
6 Ionizers
2. Ionizer air flow Should be in Working
condition.

ESD Gloves Operators should wear Antistatic gloves and


7
& Apron 1.Ensure
ESD apron Tables
in the&required
Trollys are grouded by
stages
using chain
Tables &
8 2.Ensure ESD mats are in good condition
Trollys
3. Resistance of ESD wire.(1M ohm +/-10%) (in
Checked By: M ohm)

Approved By:
s/no DATE REV DES
1.Surface resistivity of floor spec changed (10^7 to 10^9)
2.Resistance of ESD wire resisitance.(1M ohm +/-10%) - Description altered
1 31/7/2018 3 3.Check Point 6 and 7 added.
In tables and troylles1.Ensure Tables & Trollys are grouded by using chain
2.Ensure ESD mats are in good condition
3. Resistance of ESD wire.(1M ohm +/-10%)