The document provides an inspection schedule for testing a 16MVA transformer over two days. It lists 18 tests to be performed, including measurement of voltage ratio, insulation resistance, load and no load losses, winding resistance, oil breakdown voltage, induced overvoltage withstand test, and magnetic balance, capacitance, and functional tests. The schedule is approved per the contract, provided tests 11-12 and 13-18 shown in red are included. All test instruments must have valid calibration certificates traceable to national laboratories.

Uploaded by

Amany Hamdy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views1 page

16MVA Transformer Test Schedule Comments

The document provides an inspection schedule for testing a 16MVA transformer over two days. It lists 18 tests to be performed, including measurement of voltage ratio, insulation resistance, load and no load losses, winding resistance, oil breakdown voltage, induced overvoltage withstand test, and magnetic balance, capacitance, and functional tests. The schedule is approved per the contract, provided tests 11-12 and 13-18 shown in red are included. All test instruments must have valid calibration certificates traceable to national laboratories.

Uploaded by

Amany Hamdy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION SCHEDULE FOR 16MVA TRANSFORMER

PO. No. D/PRO/2005/0198 Dated 01.03.05.

Please include the tests shown in red in your test schedule. With these comments the test schedule is approved as per the
contract.

Sr. No Test Description IS CLAUSE REF DAY

1 Measurement of Voltage Ratio, Polarity test IS 2026, PART 1, DAY 1


CL .16.3

2 Measurement of Insulation resistance at 20,60,120 CL. 16.6 DAY 1


and 600 sec, calculation of Absorption Ratio & PI.PI
shall be at least 2.

3 Vector group test. CL. 16.3 DAY 1

4 Load loss and impedance voltage measurement CL. 16.4 DAY 1

5 No load loss measurement at 90%,100%,110% of CL .16.5 DAY 1


rated voltage and no load amp. measurement

6 Measurement of winding resistance at different taps CL 16.2 DAY 1


in ascending order & descending order

7 Measurement of transformer oil breakdown voltage IS 335 DAY 1

8 Separate source voltage withstand test CL. 16.7 DAY 1

9 Induced overvoltage withstand test. CL. 16.7 DAY 1

10 Report preparation and signature -- DAY 2

11 Magnetic Balance test

12 Capacitance & Tan delta test on T/F winding with LV


set / HV set

13 CT Polarity test of all CTs

14 Insulation Resistance Measurement of Core


insulation with 2kV AC/DC

15 2kV test on Marshalling Panel

16 Functional test of Buchholtz, OTI,WTI,CCU,PRV etc

17 Please show the incorporation of JSL/Mecon


comments on the T/F to JSL inspector

18 T/F efficiency and regulation calculation

Please note that all test instruments/equipments have valid calibration certificates traceable to National Laboratories and shall be made
available to JSL inspector.