0% found this document useful (0 votes)
87 views7 pages

15 Scaffold Set

This document provides operating instructions for Fortress Industries scaffold towers that come in heights of 5, 10, 15, and 20 feet. It details the general product specifications including features, maximum load capacities, and package contents for scaffold towers with either base plates or casters. It also provides safety practices and instructions for assembly of the scaffold towers. Contact information is provided for any questions or issues.

Uploaded by

John Beckett
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views7 pages

15 Scaffold Set

This document provides operating instructions for Fortress Industries scaffold towers that come in heights of 5, 10, 15, and 20 feet. It details the general product specifications including features, maximum load capacities, and package contents for scaffold towers with either base plates or casters. It also provides safety practices and instructions for assembly of the scaffold towers. Contact information is provided for any questions or issues.

Uploaded by

John Beckett
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

OPERATING INSTRUCTIONS

Frame Scaffolding Towers


Rolling & Stationary
5’, 10’, 15’ and 20’ High

READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.

SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE.

This manual provides important information on proper operation and maintenance. Every effort has been
made to ensure the accuracy of this manual. We reserve the right to change this product at any time without
prior notice.

STOP! CONTACT CUSTOMER SERVICE WITH QUESTIONS OR PROBLEMS.


If you experience a problem or need parts for this product, please call Fortress Industries customer service at
800-980-8841.

Phone # 800-980-8841 | Fax # 909-627-8211 | [email protected] | www.fortressindustriesinc.com www.fortressindustriesinc.com


Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
TABLE OF CONTENT

General Product Specifications ............................................ Page 3

Features ........................................................................... Page 3

Package Contents ........................................................... Page 4-5

Safety Practices ................................................................. Page 6

Assembly of a Scaffold Tower ............................................... Page 7

Phone # 800-980-8841 | Fax # 909-627-8211 | [email protected] | www.fortressindustriesinc.com www.fortressindustriesinc.com


Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
GENERAL PRODUCT SPECIFICATIONS
Features
Built for exterior and interior use
Professional quality for all contracting trades
Guard panel system designed for simple assembly
Easy two-person assembly
Maximum load capacity for scaffold tower with baseplates is 2475 lbs.
Maximum load capacity for scaffold tower with casters is 2000 lbs.

5’ Guard Rail 7’ Guard Rail

Toe Board Set

Pigtails-Gravity Locks Scaff -Platform 7’x 19”

Scaffold Frame 5’ x 5’

Scaffold Cross Brace

Insert Pin /Spring Retainer

Outrigger

8” Casters
Screw jack w/Base Plate

Base Plate
Squaring Brace

Toggle Pin Snap Pin

Screw jack w/Socket

Phone # 800-980-8841 | Fax # 909-627-8211 | [email protected] | www.fortressindustriesinc.com


Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
www.fortressindustriesinc.com
PAGE 3
BASE PLATES SCAFFOLD TOWERS

20’ Scaffold Tower with Baseplates


Package Contents
(8) Ladder frame - 5 ft. x 5 ft. with coupling pins
(8) Cross braces - 7 ft.
(3) Platform - 7 ft. aluminum/plywood
(8) Base plates
(4) Outriggers
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(24) Gravity pins

15’ Scaffold Tower with Baseplates


Package Contents
(6) Ladder frame - 5 ft. x 5 ft. with coupling pins
(6) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(16) Gravity pins

10’ Scaffold Tower with Baseplates


Package Contents
(4) Ladder frame - 5 ft. x 5 ft. with coupling pins
(4) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(12) Gravity pins

5’ Scaffold Tower with Baseplates


Package Contents
(2) Ladder frame - 5 ft. x 5 ft. with coupling pins
(2) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(8) Gravity pins

Phone # 800-980-8841 | Fax # 909-627-8211 | [email protected] | www.fortressindustriesinc.com www.fortressindustriesinc.com


Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710 PAGE 4
CASTERS SCAFFOLD TOWERS

20’ Scaffold Tower with Casters


Package Contents
(8) Ladder frame - 5 ft. x 5 ft. with coupling pins
(8) Cross braces - 7 ft.
(3) Platform - 7 ft. aluminum/plywood
(8) Casters 8 in.
(4) Outriggers
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(24) Gravity pins

15’ Scaffold Tower with Casters


Package Contents
(6) Ladder frame - 5 ft. x 5 ft. with coupling pins
(6) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(20) Gravity pins

10’ Scaffold Tower with Casters


Package Contents
(4) Ladder frame - 5 ft. x 5 ft. with coupling pins
(4) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(12) Gravity pins

5’ Scaffold Tower with Casters


Package Contents
(2) Ladder frame - 5 ft. x 5 ft. with coupling pins
(2) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(8) Gravity pins

Phone # 800-980-8841 | Fax # 909-627-8211 | [email protected] | www.fortressindustriesinc.com www.fortressindustriesinc.com


Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710 PAGE 5
WARNING AND
SAFETY PRACTICES
• Inspect scaffold daily or before each use.

• Do not exert horizontal force from on top of a free standing scaffold.

• When hoisting materials or using side brackets, scaffold must be retrained from tipping by guying or
tying to a permanent structure or other acceptable means.

• Do not use boxes, ladders, or other means to increase working heights.

• Do not stand or sit on guard rails.

• Do not climb or stand on cross brace or horizontal brace.

• Do not swing around corner of scaffold to enter platform from the cross braces side.

• Do not use bricks, boxes, Concrete blocks, or any other unstable objects under scaffold leg.

• NEVER ride a moving Scaffold.

• Never operate scaffolding or any tool under the influence of alcohol or drugs

• Do not move scaffold by applying a pulling or pushing force at or near the top of scaffold tower.

• Do not use braces as a platform support

• Do not use side brackets on a rolling tower.

• Two or more people are recommended for erecting scaffolding.

• Restrict loading to safe working loads.

• Use caution. Keep scaffold away from all electric hazards.

• Wear hard hats and safety glasses when required.

Phone # 800-980-8841 | Fax # 909-627-8211 | [email protected] | www.fortressindustriesinc.com www.fortressindustriesinc.com


Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710 PAGE 6
Assembly of Scaffold Tower 5’, 10’, 15’ and 20’ High
(Rolling or Stationary)

Check all scaffold parts for damage, making sure that they are in proper working condition prior to
1 assembly and erection of scaffold. Equipment that is damaged or is not in proper working condition
should not be used.

2 Attach (2) scaffold frames with (2) cross braces.

Cross Brace
5’ X 5’ Scaffold Frame

Leveling Jack Locking Pin


Insert (4) casters or base plates into bottom of scaffold frame legs, secure with locking pins or gravity

3 pins. When using leveling jacks (optional) first insert caster or base plates into leveling jacks, secure
with locking pins or gravity pins, then insert leveling jacks into bottom of scaffold frame legs. If using
Base Plate
Gravity Pin
casters be sure to set brakes to proceed. Caster

Squaring Brace
When choosing casters for a rolling scaffold tower, the installation of a squaring brace is needed and
4 applied diagonally at base of scaffold frames. (On a 20’ Scaffold Tower (2) squaring brace are needed
one at the base and one at 15’)

Outrigger

5 (4) Outriggers are needed for rolling towers 15’ and higher and stationary tower at the 20’ level.

Scaffold Platform

6 Apply (3) scaffold platforms along top horizontal of scaffold frames.

Adding Tower Height — Add additional scaffold frames by installing bottom of additional scaffold Insert Pin
frames onto insert pins at the top of scaffold frames erected in step #2 and secure with gravity locks.
7 Then apply (2) cross braces to additional scaffold frames. Be sure to install scaffold frames so that steps
continue above one another on the same side of frame. Move the scaffold platforms to the newly
Gravity Pin

added frames and install as previous in step #6. With this step you are at a 10’ height, repeat this step
#7 to achieve maximum height of 20’. 5’ X 5’ Scaffold Frame

Guard Panel System

After reaching desired height, install guard panel system. First install (2) 5’ end panels onto top of
8 scaffold frames insert pins and secure with gravity locks. Then install (2) 7‘ side panels onto locks of
end panels.
7’ Side Panel

5’ End Panel Gravity Pin

Toggle Pin

When option for using Toe Boards, first install 5’ End Toe Boards with brackets onto 5’ End Guard Panel 5’ End Toe Board

9 with U-Bolt provided. Then install 7’ Side Toe Boards into channel bracket provided on 5’ End Guard
Panel secured with Toggle Pins. 7’ Side Toe Board

Phone # 800-980-8841 | Fax # 909-627-8211 | [email protected] | www.fortressindustriesinc.com www.fortressindustriesinc.com


Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710 PAGE 7

You might also like