15 Scaffold Set
15 Scaffold Set
This manual provides important information on proper operation and maintenance. Every effort has been
made to ensure the accuracy of this manual. We reserve the right to change this product at any time without
prior notice.
Scaffold Frame 5’ x 5’
Outrigger
8” Casters
Screw jack w/Base Plate
Base Plate
Squaring Brace
• When hoisting materials or using side brackets, scaffold must be retrained from tipping by guying or
tying to a permanent structure or other acceptable means.
• Do not swing around corner of scaffold to enter platform from the cross braces side.
• Do not use bricks, boxes, Concrete blocks, or any other unstable objects under scaffold leg.
• Never operate scaffolding or any tool under the influence of alcohol or drugs
• Do not move scaffold by applying a pulling or pushing force at or near the top of scaffold tower.
Check all scaffold parts for damage, making sure that they are in proper working condition prior to
1 assembly and erection of scaffold. Equipment that is damaged or is not in proper working condition
should not be used.
Cross Brace
5’ X 5’ Scaffold Frame
3 pins. When using leveling jacks (optional) first insert caster or base plates into leveling jacks, secure
with locking pins or gravity pins, then insert leveling jacks into bottom of scaffold frame legs. If using
Base Plate
Gravity Pin
casters be sure to set brakes to proceed. Caster
Squaring Brace
When choosing casters for a rolling scaffold tower, the installation of a squaring brace is needed and
4 applied diagonally at base of scaffold frames. (On a 20’ Scaffold Tower (2) squaring brace are needed
one at the base and one at 15’)
Outrigger
5 (4) Outriggers are needed for rolling towers 15’ and higher and stationary tower at the 20’ level.
Scaffold Platform
Adding Tower Height — Add additional scaffold frames by installing bottom of additional scaffold Insert Pin
frames onto insert pins at the top of scaffold frames erected in step #2 and secure with gravity locks.
7 Then apply (2) cross braces to additional scaffold frames. Be sure to install scaffold frames so that steps
continue above one another on the same side of frame. Move the scaffold platforms to the newly
Gravity Pin
added frames and install as previous in step #6. With this step you are at a 10’ height, repeat this step
#7 to achieve maximum height of 20’. 5’ X 5’ Scaffold Frame
After reaching desired height, install guard panel system. First install (2) 5’ end panels onto top of
8 scaffold frames insert pins and secure with gravity locks. Then install (2) 7‘ side panels onto locks of
end panels.
7’ Side Panel
Toggle Pin
When option for using Toe Boards, first install 5’ End Toe Boards with brackets onto 5’ End Guard Panel 5’ End Toe Board
9 with U-Bolt provided. Then install 7’ Side Toe Boards into channel bracket provided on 5’ End Guard
Panel secured with Toggle Pins. 7’ Side Toe Board