Contingency Plan
Contingency Plan
Name of Production: Emporio Armani Producers Name: Tom Evans Contact Number: 07737127127
Location / scene Potential problem Effect on production Control Measure Existing measures
Poole college Green screen room is We lose time for We will book in advance to make The booking system is put in place so we
overbooked production sure we have the room can book the room, or we can know when
the room is free
Bournemouth Rain The weather could We will check the weather forecast We also have access to umbrellas and
beach damage the equipment and choose the best time to do it covers for the camera
Poole college Surrounding students Unnecessary extras may We will find a more secluded area We can film during our Video Production
may affect our filming as get in the way of filming in the college to ensure no one lessons so less students are about instead
we have no need for and slow us down imposes on our recording of at break or lunch
background characters
Bournemouth Members of the public We may have to take We will make people aware we are If we film during the week instead of the
beach may also get in the way extra takes of each scene filming for a project as well as weekend there will be less dog walkers and
of our filming which will majorly slow choosing a location that is private people at the location
our production down and concealed
Poole college As well as having If unwanted background We will shoot when no one is N/A
unnecessary characters noises are in our shot, our about and make people aware if
in our shot, the college is advert won’t be as they are walking past
also prone to loud noises effective
Bournemouth As the location is public, We may have rubbish in We will pick up and dispose of any N/A
beach AND there may be potential the background of some rubbish we find in the location we
Poole college trip hazards on items shots which will ruin the will film at
that have been forgotten overall aesthetic
and left