0% found this document useful (0 votes)
48 views10 pages

FinalProject Proposal

This document proposes developing a new network system for the computer lab at Ku/ Denagamuwa Maha vidyalaya. The current network is broken and the lab has not been used in 4 years. The project aims to repair the damaged computers and create a secure wired or wireless network using Windows and server software. It will provide students and teachers access to IT resources and knowledge. The methodology involves assessing the current lab, selecting a suitable network type, and creating a proposal. Required resources include Windows, server, antivirus and office software licenses as well as networking equipment. The proposal is submitted for supervisor approval to begin the project.

Uploaded by

Ahnaf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views10 pages

FinalProject Proposal

This document proposes developing a new network system for the computer lab at Ku/ Denagamuwa Maha vidyalaya. The current network is broken and the lab has not been used in 4 years. The project aims to repair the damaged computers and create a secure wired or wireless network using Windows and server software. It will provide students and teachers access to IT resources and knowledge. The methodology involves assessing the current lab, selecting a suitable network type, and creating a proposal. Required resources include Windows, server, antivirus and office software licenses as well as networking equipment. The proposal is submitted for supervisor approval to begin the project.

Uploaded by

Ahnaf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Network Proposal

Submitted By

Group 7

Advanced Technological Institute – Kurunegala

Higher National Diploma in Information Technology

Group Project
Table of Contents

1. Title 2
2. Introduction 2
3. Problem 2
4. Study aim and objectives 3
5. Background 3
6. Methodology 4
7. Required resources &support 5
8. Project plan 6
9. References 7
10. Group Members 7

1
1. Title

Develop the network system in Ku/ Denagamuwa Maha vidyalaya

2. Introduction

Lot of peoples uses of this s Ku/ Denagamuwa Maha vidyalaya’s computer lab.For
example,

 Students
 Teachers
 People who are authorized occupations

This computer lab is not used in last 4 years. Some machines are can’t repair because
their machines are very damaged. We would like to repair this network system because it
is break down earlier.

We are ATI students , we are studying as a Network Administer Track(HNDIT). We will


be handling the design and implementation phase of the Network project. And all pricing
and fees will be handled by Denagamuwa Maha Vidyalaya in kurunegala.

3. Problem

A network System like this was suggested because presently when used computer
lab, there arising problems or difficulties. The main problem is the wastage of
time, by the network is break down.

2
4. Study Aim & Objectives

Our aim is creating new network system, develop and repair computer lab in this
school

Our main object Is The network is designed to achieve several specific learning and
operational objectives:

1. Secure Service: The main objective of this network is to provide secure


administrative computing service to school Lab. It is designed to be functionally
and physically isolated from access by people not employed by school Lab as to
minimize the risk of unauthorized use.

2. Integration and Update: This is a new installation in old buildings. The network
and equipment being installed will be new state of the art equipment designed for
school Lab.

5. Background

The client, Denagamuwa Maha Vidyalaya in Kurunegala located in Colombo


Road, Polgahawela. The client is a Government School. The design buildings is
a old. Main has one floor. The client will be not used that lab facilities in last 4
years.

At present this computer lab hasn’t good network system. Computers are very
damaged
But there, not only the students who can’t get computer lab facility also face lot
of problems.

3
The major problem is the students can’t get knowledge about IT. It is a very big
problem. At present IT subject is head of higher education system. Because
students should be learn IT,

Therefore, we would like develop this computer lab and network system.

6. Methodology

Estimated dates 60

There are 3 major steps the


project

• Problem definition
Visit the Ku / Denipitiya Maha Vidyalaya computer lab

• Collect information

▪ About computer lab

▪ Lan connection is the good network system for this lab


▪ ….

▪ …..

• Make proposal

4
(There are 5 major steps the project

 Planning
 Designing
 Development
 Testing )

7. Required Resources & Support

 Software

1) Microsoft Windows 7 Professional on all computer workstations (wired or


wireless)

2) Microsoft Server 2008 on the server (network operating system)

3) Norton Anti - virus software on all servers and clients

4) Microsoft Office 2010

5) All updates and service packs installed

6) Software provided by Client

7.) Cisco Packet traser

5
8. Project Plan

9. References

1. ….
2. …..
3. …..
4. …

6
10.group members

Name Reg. No
1. W.M.M.K.Wijebandara KUR/IT/2017/F/0003
2. S.M.S.T.Subasinghe KUR/IT/ 2017/F/0046
3. S.M.S.N.Samarakoon KUR/IT/ 2017/F/0076
4. K.D.S.M.Dharmasena KUR/IT/ 2017/F/0083
5. K.M.S.M.Jayathilake KUR/IT/ 2017/F/0104

Declaration of the supervisor:

I hereby accept the proposal of this project and permit the student to launch this project.

……………… ………………………..…………….

(Date) (Supervisor’s Signature)

7
.

8
9

You might also like