ESTIMATED COST :-
Rs.- 426.65 Lacs
(2021-22)
( FORM 'J' )
TOTAL A ₹ 335.26
TOTAL B ₹ 377.17
TOTAL C ₹ 380.94
G.TOTAL ₹ 426.65
Summary of work
18 Making Earth Pusta along boundary wall Analysis CUM 72.00 307.40 22132.69
18 Making Earth Pusta along boundary wall 2 100.00 0.60 0.60 72.00
TOTAL 72.00 Cum
Construction of Boundary Wall at 44th Vahini P.A.C. at Meerut
ABSTRACT OF COST OF UNIT LENGTH 100.00 MTR
(Bijli Bamba Road Side Extra Plinth Height)
(B) For height 2700 mm in superstructure from Ground Level
S.N. ITEM SOR NO. UNIT QTY RATES AMOUNT
Dismantling brick work or stone work in
1 PWD 692 CUM 33.34 316.00 10534.97
lime or cement mortar
Earth work in excavation in trenches for
foundations and pipes cables etc in
ordinary soil (loan clay or sand) including
lift upto 1.5 m, lead upto 50 m and
2 dressing of sides and ramming of PWD 251 CUM 97.68 90.00 8791.02
bottom and disposal of surplus
excavated earth as directed by the
Engineer- in- charge with in a lead of
50m.
Providing and laying in cement concrete
1:4:8 (1 cement :4 coarse sand :8 stone
3 grit 40 mm nominal size) and curing PWD 281 CUM 8.56 4470.00 38285.33
complete,including cost of form- work,in
foundation and floors.
18 Making Earth Pusta along boundary wall Analysis CUM 81.00 307.40 24899.27
ANALYSIS OF RATES
1 Earth work in filling including cutting loading cartage upto 8.00 Km. and unloading including
cost of Earth etc complete.
a) Cost of Item
S. No. Description Unit Qty. Rate Amount
1 Irr. SOR Cost of Earth 1 Cum 36.10 36.10
2 253 PWD Excavation Charges 1 Cum 78.00 78.00
Total 114.10
b) Cartage Charges
1 261 (b) PWD 1st km. Km. 1.00 48.00 48.00
231 (a) PWD 2nd Km Km. 1.00 24.10 24.10
3rd Km Km. 1.00 21.40 21.40
4th Km Km. 1.00 19.50 19.50
5th Km Km. 1.00 17.80 17.80
6th Km Km. 1.00 16.50 16.50
7th Km Km. 1.00 15.50 15.50
8th Km Km. 1.00 14.60 14.60
177.40
Ist KM. Kaccha Road add @ 33.33%
Foot
2 PWD After deduction loading & Unloading 33.33 % of Rs. 47.70 15.90
note
(100.70-(35.0+18.0) ] = 47.70
Total 193.30
G.Total (a+b) = 307.40