ITP For Access Control System Installation

This document is an inspection and test plan (ITP) for an access control system installation project. It outlines 4 key activities to be inspected: documentation approval, material inspection, installation, and sign-off. For each activity, it specifies the frequency of inspection, the inspection criteria based on project specifications and drawings, and whether the contractor's QA/QC or consultant will perform the inspection. The ITP provides a verification record table to document sign-off of inspections by the contractor and consultant upon completion of the works.

Uploaded by

Tamer Eid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
349 views1 page

ITP For Access Control System Installation

This document is an inspection and test plan (ITP) for an access control system installation project. It outlines 4 key activities to be inspected: documentation approval, material inspection, installation, and sign-off. For each activity, it specifies the frequency of inspection, the inspection criteria based on project specifications and drawings, and whether the contractor's QA/QC or consultant will perform the inspection. The ITP provides a verification record table to document sign-off of inspections by the contractor and consultant upon completion of the works.

Uploaded by

Tamer Eid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION & TEST PLAN

Mock – Up
REF. NO.

REV. NO. 0
DATE :
PAGE : 1 OF 1

ACTIVITY: Access Control System Installation

AREA/LOCATION:

ITP approved by CONTRACTOR's QA/QC: ITP approved by Consultant:


Signature: Signature:
Date: Date:
INSPECTION LEVEL
SERIAL NO. DESCRIPTION FREQUENCY SPECIFICATION / CRITERIA VERIFICATION RECORD
S/C CONTRACTOR Consultant

1 DOCUMENTATION
Once (Approval prior to
1.1 Pre-Qualification subcontractor Project Specifications and drawings. H H R
submit the submittal)

1.2 Shop Drawing Approval Each Shop Drawing Project Specifications and drawings. H H R

Each MAR ( prior to order


1.3 Material Approval Project Specifications and drawings. H H R
the material).

Once (Approval prior to


1.4 Method Statement Approval Project Specifications and drawings. H H R
start of activity)
2 MATERIAL INSPECTION

Check the Material as per approved


2.1 Each Delivery Project Specifications and drawings. H H H
submittal.

3 Installation

Each Area where applicable


3.1 Installation of the system (As per Consultant Project Specifications and drawings. H H H
requirements)

LEGEND: H: HOLD W: WITNESS S: SURVEILLANCE R: REVIEW


ITP Sign-Off post completion of Works
CONTRACTOR APPROVAL Consultant APPROVAL

NAME : NAME :

SIGN : SIGN :
DATE: DATE: