Nabeel Afzal: Experience and Background Education

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NABEEL AFZAL (B.

E CIVIL)
Planning & Coordination
+92 307 4499344
[email protected]

E X PE R I E NC E A ND B A CK G R OU ND
EDU C AT I O N

› B.E CIVIL (2014 -2018) 4 YEARS OF PROFESSIONAL EXPERIENCE IN CIVIL/STRUCTURAL CONSTRUCTION PROJECT
University of Engineering & MANAGEMENT
Technology Lahore, Pakistan

CORE SKILL(S) / SPECIALTY ARE AS BELOW:


A RE A O F EX PE R TIS E
› Planning, Monitoring & Control
PROJECT MANAGEMENT (EPC Projects)
o Schedule
 Preparing, Monitoring and Control of Schedule and Cost.
o Cost
 Prepare Tracking Reports with respect to planned activity.
o Risk & Issues
 Identify, analyze & Report the Schedule trends on weekly basis. Report consists of schedule
o Coordination
baseline, schedule variance, look ahead plan, Milestone status, Resources etc.
› Estimation
 Identify and track the risk viability and present the mitigation plan.
o Preparation of
 Responsible for document management system at Department Level & Project level.
Subcontractor Bills
 Monitor day to day work progress and prepare bi-weekly and monthly look-ahead programs.
o Preparation of IPC
 Prepare DPR, Weekly and Monthly Progress Reports.
o Quantity takes off for
 Prepare Meeting Agenda and MOM’s.
Procurement
 Raising Site Demands regarding Materials for Formwork, Steel & RCC Works.
› Document Management
Coordination

SOF TW A RE S S KI LL  Coordination with Client & Consultant regarding Drawing issues and their timely solution.

› MS Project – Excellent  Daily Basis coordination with Client/Consultant through emails, WhatsApp & Telecon.

› Primavera – Good  Coordination with site team to insure work as per design and contract.

› MS Excel (with VBA) – Excellent  Coordination with Suppliers and subcontractor to manage resources regarding human &
› AutoCAD (2D & 3D) – Excellent Material.
› SketchUp 2020  Coordination with Head Office for timely release of sent demands.
› Adobe Acrobat – Excellent  Coordination with other disciplines, project team & site for required inputs for timely completion

in compliance with company QA/QC Procedures.

ME MBE R S H I PS  Proper Site visits to all the main Stakeholder and explaining site works with respect to drawings
› Pakistan Engineering Council and Future Plans.
› ACI Student Membership DESIGN

 Detail Study of all the drawings Architectural, Structure and MEP before commencing of any
DAT E O F B I RTH work.
› March 21, 1995
 If there is any discrepancy between drawings discuss with Client & Consultant Engineers.

 Prepare shops drawings for better coordination.


N AT IO N ALI TY
 Prepare As Built after completion of any additional work.
› Pakistani
GENERAL

LA N GU A GE S  Estimations for raising demands for Formwork, Steel, Cement, RAW Material etc.
› English - Proficient  Preparation of Subcontractor monthly Bills.
› Urdu – Proficient
 Preparation of IPCs and check them from Client/Consultant
› Punjabi – Proficient
 Preparation of BBS.

Page 1 of 2
K E Y PR OJ E C TS

Employer: ITTEFAQ BUILDING SOLUTIONS PVT LTD

Duration: Nov 2018 till to Feb 2022 (04+ years)

Position: Planning & Coordination Engineer

Type of Project: EPC Projects (College, Five Star Hotel)

Scope of Employer's Contract: Construction of Grey Structure, Finishes and MEP Works.

Specific Duties and Responsibilities/Scope of Work: Planning & Coordination/Construction Management/Estimation

LIST OF PROJECTS:

1. From SEP-2020 to FEB-2022

a. Working as a P & C Engineer/ Asstt. Project Manager

b. Project Name: BEJAAN HOTEL, CHITRAL, PAKISTAN

c. Client: Aman Private Ltd.

d. Consultant: Ali Arshad Associate, Mushtaq & Bilal, Eleken Associates, SEM Engineers

2. From NOV-2018 to SEP-2020

a. Working as a P & C Engineer/ Asstt. Project Manager

b. Project Name: SALEEM HABIB EDUCATION COMPLEX, Toba Tek Singh, Pakistan.

c. Client: Barrett Hodgson Pakistan Pvt Ltd

d. Consultant: Ali Arshad Associate, Republic Engineering Corporation (Pvt) Ltd.

Miscellaneous Major Tasks

› Coordination with all the consultant and client for issuance of drawings and to solve other site issues for timely
completion of activities.
› Coordination with MEP Site Team to work smoothly
› Attends meetings and reports on the current situation and prepare meeting minutes related to project planning .
› Identifying the major milestones, critical approvals and long lead procurement items.
› Analyzing gaps between the planned and actual progress and highlight the areas of concerns which required action
to the Project Manager.
› Prepare Baseline Schedule and done tracking of each activity.
› Prepare EOT with Proofs.
› Prepare DPR, Weekly and Monthly Progress Reports.
› Prepare Shop drawings and get approval from consultant using AutoCAD.
› Raising Site Demands regarding Materials for Formwork, Steel & RCC Works.
› Coordination with Head Office for timely release of sent demands.
› Coordination with Suppliers and subcontractor to manage resources regarding human & Material.
› Prepare shops drawings for better coordination.
› Prepare As Built after completion of any additional works.
› Preparation of Subcontractor monthly Bills.
› Preparation of IPCs and check them from Client/Consultant.

I n t e r n s h i p s D u rin g S tu dy :

Employer: NESPAK PVT LTD Employer: SA CONSTRUCTION CO. ENGINEER’S & CONTRACTOR’S

Duration: JUL 2017 till to JUL 2017 Duration: JUL 2016 till to AUG 2016

Project: Aziz Cross Flyover, Gujranwala. Project: University of Agriculture Faisalabad, T.T.S Campus

Page 2 of 2

You might also like