CBT 8

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

CBT QUISTION-COATING

1.WFT = DFT x 100 /vs

1. True
2. False

2.sspc sp7

1. Brush of blasting
2. Commercial blasting
3. White metal
4. Near white metal

3.Four elements to control corrosion

1. Anode, cathode, electrolyte, metallic pathway


2. Anode, cathode
3. Anode, similar metal, dissimilar metal

4.DFT gauge can be calibrated by

1. Manufacture
2. Laboratory
3. Coating inspector
4. All of the above

5.Out of which four elements mainly control corrosion

1. Cathode
2. metallic pathway
3. electrolyte
4. Anode

6.Thermal spray done immediately can shout off

1. True
2. False

7.Covered with both mill scale & rust

1. Condition A
2. Condition B
3. Condition C
4. Condition D

8.Fusion bond epoxy coating holiday is done by

1. High voltage holiday detector


2. Low voltage holiday detector
3. Both A&B
4. Wet sponge holiday detector
9.If DFT is 400 to 500 microns voltage used is 1500 volts

1. True
2. False

10.Minimum surface preparation is required by

1. Brush of blast
2. Commercial blast
3. White metal
4. Near white metal blasting

11.How many volts of light required in immersion services

1. 12 volts of ordinary light


2. 24 volts of explosion proof
3. 12 volts of explosion proof
4. All of the above

12.Rust grade A is

1. Steel covered with both mill scale rust


2. Adherent mill scale with little rust
3. Steel covered with partial pitting
4. Steel covered with rust with general pitting

13.How many layers paint needed for 100-meter square & DFT is 300 micron

1. 90 litters
2. 60 litters
3. 30.3 litters
4. 80 litters

14.If we check DFT for 10 meter square and DFT Value can be found low (less then specified)

1. True
2. False

15.centrifugal blasting consists of

1. Garnet
2. Grit & shot
3. All of the above

16.steel covered with rust & partial pitting’s observed

1. Condition A
2. Condition B
3. Condition C
4. Condition D

17.DFT = wet x vs/100 (Calculation)


18.While using airless spry both air & paint come in sperate channels & final mixed both while using

1. True
2. False

19.Afer completion of paint application too much dust particles settled before dried ,wt defect can be found

1. Wrinkling
2. Orange peel
3. Over spray

20. while doing blasting, blaster gets injured ,immediately shout off

1. Check down valve


2. Main valve
3. Dead man valve

21.SSPC SP12 defined as

1. Steam
2. Oil
3. Water
4. All of the above

22.NACE RP 0188 is

1. Lack of adhesion
2. Holiday test
3. Cohesion
4. All of the above

23.SSPC VIS 1 is

1. Surface preparation standard of dry film


2. Surface preparation standard of rust grade
3. Surface preparation standards

24.surface profile has been measured by

1. Clemtex standard
2. Test of film
3. Surface comparator

25.SSPC SP6 is

1. Commercial blasting
2. Brush of blasting
3. White metal
4. Near white metal
26.hand applied splash zone is

1. APCS 19B
2. APCS 19A
3. APCS 17
4. APCS 12

27.For curing some coating required

1. Oil
2. Moisture
3. Acid

28.surface cleaning assessment for power tool cleaning

1. SSPC VIS 1
2. SSPC VIS 2
3. SSPC VIS 3
4. SSPC VIS 4

29.flash point definition


The lowest temperature at which the vapor of a combustible liquid can be ignited in air

30.SSPC PA2 definition

Method of Measurement of Dry Paint Thickness with Magnetic Gages

31.galvanic corrosion occur on

1. Concrete
2. Wood
3. Metal
4. Fiber glass

32. 45:1 ratio of airless spry pump

1. Inlet to outlet pump ratio


2. Outlet to inlet pump ratio
3. Outlet to inlet spry tip ratio

33.feathering definition

Roughen (feather) adjacent sound coating.


34.some buried coatings shall not be 100% holiday checked prior to burial

1. Yes
2. No

35.SSPC VIS I-89 definition .

Visual Standard for Abrasive Blast Cleaned Steel

You might also like