Tutorial 3 Trucks

This document provides data and formulas for calculating production rates, unit costs, and number of days to complete an excavation project using normal and queuing theory methods. It gives the total excavation volume, hoe loading rate, job efficiency, cost per hour of hoe and trucks, and transit time for two different hoe and truck combinations. The student is asked to use this data to fill out a table calculating the expected production, unit costs, fleet costs, and number of days to complete the project for each method.

Uploaded by

eidalin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views4 pages

Tutorial 3 Trucks

This document provides data and formulas for calculating production rates, unit costs, and number of days to complete an excavation project using normal and queuing theory methods. It gives the total excavation volume, hoe loading rate, job efficiency, cost per hour of hoe and trucks, and transit time for two different hoe and truck combinations. The student is asked to use this data to fill out a table calculating the expected production, unit costs, fleet costs, and number of days to complete the project for each method.

Uploaded by

eidalin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

NAME: NUR AZLIN IDAYU BINTI MD ADAM @ MOHD ADNAN

DATE:
30/6/2021

TUTORIAL 3 (PEMBETULAN)

Formula:

Load Factor: Shrinkage Factor: Swell %:

1. Using normal (P1) and queuing theory method (P2), determine the expected production, unit cost of excavation and haul, and number of days (8 working hours/day) to complete
the work based on the following data:

Total volume of Hoe Loading rate Job efficy Cost of hoe/hr Truck size Cost of truck/hr
excavation (lcm) Transit time
(lcm/60 min) (min) (RM) (lcm) (RM)
268 55 102 10.53 29 0.45
15,367
432 45 144 14.16 38 0.51
150 50 95 9.50 30 0.55
45,656
200 50 115 11.50 35 0.58

* The actual number of truck will be assign on the 3rd row of the table. For example, N=12.2  12, fill in the table from the top 14, 13, 12 (coloured row), 11, 10, 9, 8.

Page | 1
NAME:
DATE:

Adjmt
Truck Load No of Production Production Cost per Cost per Days Days
to r PO Pt Fleet cost P1/day P2/day
size time haul 1 2 unit P1 unit P2 for P1 for P2
haul no

13

10.53 0.039 12.6

17

14.16 0.033 16.4

Page | 2
NAME:
DATE:

Adjmt
Truck Load No of Production Production Cost per Cost per Days Days
to r PO Pt Fleet cost P1/day P2/day
size time haul 1 2 unit P1 unit P2 for P1 for P2
haul no

13

9.50 0.039 12.6

17

11.50 0.033 16.4

Page | 3
NAME:
DATE:

Total volume of Number of


Expected Production Unit cost
excavation (lcm) days
15,367
45,656

Page | 4