1.

Temporary Earth Retaining Structures

1.1 Selection Procedure/Process

1
1
Top-Down Construction

ground floor slab and beams cast against earth and in


steel lattice beams in one or two directions
trenches prior to excavation work for basement to
ground fixed to top edge of diaphragm walls to
ground provide permanent lateral support at top edge of walls
level provide temporary lateral support
level

cast insitu
cast insitu
diaphragm diaphragm
access hole for men and materials basement
basement
wall intermediate slab and beams cast wall future floor slabs and beams
before next stage of excavation provide permanent lateral
support

access hole for men and materials


excavation in
progress excavation in
progress

formation level
formation level

1
1.2 Temporary supported excavation

Basements can be constructed within a cofferdam or other temporary supported excavation

Temporary support to
excavation face to
protect workmen 0.6 m working
space in which
to erect and
dismantle
formwork to
permanent
retaining wall
The working space has to be carefully backfilled as
the temporary support to the excavation face is
withdrawn. If badly backfilled ground at A will
subside

1
1.3 Solider Piles and Sheeting

1.4 Factors that influence the selection of temporary support system

 Type of soil and ground water condition


 Depth of excavation
 The
he proximity of existing structures
structure
 The needs to integrate ground support system with dewatering
 The
he design and function of the structure to be built
 The
he planned schedule
 Cost

1.5 Bracing System

 Bracing system is to strengthen the support (steel sheet piling, diaphragm wall, etc.)
– to minimize
e horizontal movement

 Bracing elements are installed at predetermined level/s and parallel to the ground
surface.

 Two types of bracing systems:

1
• internal braces

• tie backs (external braces)

1.6 Selection factors:

• type of soil – tie backs can be used in firm soils.


• the geometry of the excavation (the depth and the width of the excavation)
Narrow excavation = Cross-lot bracing
Wide excavation = Inclined braces
• Cost and duration of the project
− cost of tie back >>internal braces
− excavation in tie-back
tie sites can be expedite

2
• tie back requires permission from adjacent owner before the system can be
installed

3
2. Tekanan Sisi Tanah (Lateral Earth Pressure)

2.1 Pengenalan

Tekanan air

 nilai tekanan air sama dalam semua arah


dan berkadar terus dengan kedalaman

 Daya per unit panjang dinding (P)



    h


P= 1 γwh2
2

1 h
3

γ wh

Tekanan Tanah:

 Tekanan tanah tidak seperti air kerana geseran wujud di antara partikel-partikel tanah

ph ≠ p v
ph < p v

2.2 Jenis Tekanan Sisi Tanah


 Jenis tekanan tanah bergantung kepada kebebasan tanah bergerak dalam arah sisinya.

Arah pegerakan penahan

Tanah mampat
Tekanan tanah
meningkat ke nilai Tanah mengembang
maksimum Tekanan tanah
Tekanan tanah di mengurang ke nilai
kawasan ini dipanggil minimum
tekanan pasif (pp) Tekanan tanah di
kawasan ini dipanggil
tekanan aktif (pa)

4
2.3 Rumus Mengira Tekanan Sisi Tanah
 Rumus untuk mengira tekanan aktif dan pasif bergantung kepada jenis tanah

p a = k a γh
p p = k p γh 1 − sinφ
ka =
1 + sinφ 1 + sinφ
kp =
1 − sinφ k a = angkali tekanan aktif
k p = angkali tekanan pasif
h

p a = k a q + k a γh
p p = k p γh 1 − sinφ
ka =
1 + sinφ 1 + sinφ
kp =
1 − sinφ k a = angkali tekanan aktif
k p = angkali tekanan pasif
h

5
p a = k a γh − 2c k a
p p = k p γh + 2c k p 1 − sinφ
ka =
1 + sinφ 1 + sinφ
kp =
1 − sinφ k a = angkali tekanan aktif
k p = angkali tekanan pasif h

p a = k a q + k a γh − 2c k a
p p = k p γh + 2c k p 1 − sinφ
ka =
1 + sinφ 1 + sinφ
kp =
1 − sinφ k a = angkali tekanan aktif
k p = angkali tekanan pasif h

6
Contoh

20 kN/m2
∩∩∩∩∩∩∩∩∩∩
γ = 18kN/m3
φ = 30o 1m

γ = 21kN/m3 4m
φ = 30o

Tentukan magnitud dan kedudukan daya aktif di belakang tembok

Beban Air di atas GWT Tanah di bawah GWT Air di bawah GWT
20kN/m2

γ=18kN/m3
φ=30o
1m
A2

γ=21kN/m3
φ=30o
A1
Pa
A3
4m A4 A5
x
0
1 30    0.33  20    0.33  18  1    0.33  21 9.81  4  !  9.81  4
 
1  30  6.6/  5.9/  14.8/  39.24/
 0.33

Daya aktif di belakang tembok = Pa

Pa = A1 + A2 + A3 + A4 + A5
1 1 1
= 6.6 × 5 + × 5.9 × 1 + 5.9 × 4 + × 14.8 × 4 + × 39.24 × 4
2 2 2
= 33 + 2.95 + 23.6 + 29.6 + 78.5
= 167.65 kN m panjang tembok

7
Kedudukan Pa. - Andaikan Pa bertindak x m daripada dasar tembok. Dengan mengambil
momen pada titik O:

5 1  4 4 4
Pa x = 33 × + 2.95 + 4  + 23.6 × + 29.6 × + 78.5 ×
2 3  2 3 3
= 286.62kN.m

286.62
x =
167.65
= 1.71m

3. Rekabentuk Cerucuk Keluli Keping (Steel sheet pile)

3.1 Pengenalan
 Cerucuk keluli keping flexible

 Kestabilan tembok penahan bergantung sepenuhnya kepada rintangan pasif di


hadapan tembok

 Tanah mampat  Tanah mengembang


 Tekanan tanah  Tekanan tanah
meningkat ke nilai mengurang ke nilai
maksimum minimum
 Tekanan tanah di  Tekanan tanah di
kawasan ini dipanggil kawasan ini dipanggil
tekanan pasif (pp) tekanan aktif (pa)

 Dinding yang menyokong “pengorekan dalam” dirembat samada dengan “strut” atau
”ground anchors”

 Kegagalan lazim tembok penahan sementara cerucuk keluli keping:

• Pergerakan dasar kehadapan kerana rintangan pasif tidak mencukupi

• Lenturan yang berlebihan

• ”Struts” atau ”ground anchor” gagal

 Untuk pengorekan cetek: Kestabilan bergantung sepenuhnya kepada rintangan


pasif di hadapan dinding

8
 Agihan tekanan aktif dan pasif sebenar yang bertindak ke atas tembok penahan
cerucuk keluli keping terjulur adalah kompleks.

Dalam rekabentuk agihan berikut diandaikan:

Pa
d Pp
P2

 P2 adalah daya pasif yang terletak di bawah titik putaran dan nilainya sukar
ditentukan. Dalam praktis nilai daya ini diatasi dengan memanjangkan d yang dikira
sebanyak 20%

3.2 Contoh
Rekabentuk tembok cerucuk keluli keping untuk menyokong tepi pengorekan di dalam pasir
sedalam 1.8 m. Abaikan geseran di antara pasir dengan cerucuk keluli keping dan faktor
keselamatan tekanan pasif bernilai 2.

γ = 19kN/m3
1.8 m φ = 30o
c=0
δ = 0o

9
Angkali tekanan:

Angkali tekanan aktif (ka)

1 − sin φ
ka =
1 + sin φ
1 − sin 30 o
=
1 + sin 30o
= 0.333

Angkali tekanan pasif (kp)

1 + sin φ
kp =
1 − sin φ
1
=
ka
= 3

Tentukan Tekanan dan Daya

1.8 m

× 19 × (1.8 + d ) × 0.333
1
Pa =
2
1 3
Pp = × 19 × d 2 × 2
2 2

(1.8 + d )
d

d 3
3

3 19 × (1.8 + d ) × 0.333
19 × d ×
2

10
Tentukan nilai d:

Dinding stabil bila momen disebabkan daya pasif = momen disebabkan daya aktif

Ambil momen daya di hujung bawah cerucuk

1  d 1   1.8 + d 
=  × 19 × (1.8 + d) × 0.333 × 
2
 × 19 × d × 1.5  ×
2

2  3 2   3 
× 0.333 × 19 × (1.8 + d)
1 1
× 1.5 × 19 × d3 =
3

6 6
(1.8 + d)3 = 4.5
d3
Menggunakan keadah “trial and error solution”

d Hasil
2.0 6.86
3 4.1
2.5 5.09
2.75 4.5294

d = 2.75 m

Panjang keseluruhan cerucuk:

20
1.8 + 2.75 + 2.75 × = 5.10m
100

Momen lentur maksimum per meter lebar dinding

Momen bernilai maksimum apabila daya ricih bernilai kosong, katakan keadaan ini berlaku
di kedudukan do dari aras korekan

1.8 m

× 19 × (1.8 + d o ) × 0.333
1 1 2
× 19 × d o × 1.5
2

2 2

do

11
× 19 × (1.8 + do ) × 0.333
1 1
× 19 × do × 1.5 =
2 2

2 2
2
 1.8 + do 
  = 4.5
 do 

(nota: do diperoleh melalui kaedah trial-and-error)

d Hasil
1 7.84
1.5 4.84
1.6 4.52
1.61 4.486

Momen lentur maksimum:

× 19 × 0.333 × (1.8 + 1.61) − × 19 × 1.5 × 1.613


1 3 1
Mmax =
6 6
= 21.99kN.m

Tegasan dibenarkan didalam keratan cerucuk keluli keping = 140N/mm2

Gunakan hukum lentur untuk dapatkan saiz keratan:

M
f =
Z
21.99 × 10 6
Z =
140
= 157071mm 3 / m
= 157 cm 3 / m

Dari jadual gunakan keratan terkecil: Larsen 6W

12
Pesongan:

1
× 19 × 0 . 333 × 1 . 8 2
1.8m 2
= 10 . 24 kN

19×0.333×1.8

0.067 WL3
δmax =
EI
0.067 × 10.24 × 10 3 × 1800 3
=
205 × 10 3 × 6459 × 10 4
= 0.302mm

13
4. Anchored Sheet Pile Walls

1m
T

γ = 19kN/m3
8m φ = 30o

Pa=½×19×0.333×(8+d)2

d
Pp=½×19×1.5×
2

19×1.5×d 19×0.333×(8+d)

Value for d:

Equating moments about the anchor

2  2 P
 3 (d + 8 ) − 1Pa =  d + 7 p
  3 F

2  2 
 3 (d + 8 ) − 1 (d + 8 ) = 4.5  d + 7 d2
2

  3 

Trial and error

d Left Right
4 1008 696 d = 5.5 m
5 1295.7 1162.5
6 1633.3 1782
5.5 1458 1452

14
Value for T:

Equating horizontal forces

P
T = Pa − p
F
=
1
2
[
× 19 0.333(5.5 + 8 ) − 1.5 × 5.52
2
]
= 147kN per metre run of wall

 The anchors are usually spaced 2-3m apart

 The load being distributed along the wall by walings running infront of the piles

 Point of zero shear and the maximum bending moment in the piles may be
determined in the same manner as in the case of cantilever wall.

15
5. Kestabilan Cerun

5.1 Pengenalan
Bila permukaan bumi dicerunkan daya2 yg wujud akibat daripada pencerunan akan
memaksa tanah bergerak dari titik yg tinggi ke titik yg rendah.

Daya2 yg menyebabkan kegagalan cerun:

• daya graviti

• tekanan air dlm tanah

Cerun akan gagal bila rintangan ricih pada mana2 satah dlm tanah dilampaui.

Mod cerun gagal bergantung kepada jenis tanah:

Kestabilan cerun diukur dengan menggunakan faktor keselamatan cerun (F):

Daya rintangan
F=
Daya yang mengagalkan cerun

5.2 Analisis Kestabilan Cerun


 Parameter dan daya-daya dalam cerun:
Pusat gelansar
d

Tegasan ricih
rintangan (τf)

Tegasan normal
(σn)

16
 Berdasarkan keseimbangan momen:

F =
∑ Momen daya rintangan
2

∑ Momen daya penggerak


2

τm × R
=
Wd

 Analisis kestabilan cerun merupakan proses “trial and error” yang melibatkan:

• mengandaikan pusat dan permukaan gelangsar

• menilai keseimbangan daya2 yg bertindak di permukaan gelangsar

• tindakan (a) dan (b) diulang sehingga FKC yang minimum diperolehi

17
5.3 Contoh
71.5° O 37°

C D

6m

G
A B
E

F
2.75 m

Rajah di atas mewakili cerun di tepi sebuah pengorekan yang dilaksanakan di dalam tanah
liat. Di dalam analisis kestabilan cerun, permukaan gelansar BED berjejari arka 11.75m
dipilih untuk diperiksa.

Luas kawasan BCDEF ialah 87m2 dan pusat garavitinya terletak di G. Unit berat tanah
cerun ialah 17.60kN/m3. Kejelekitan tanah cerun di atas dan di bawah garisan ABE masing-
masingnya bernilai 21.5kN/m2 dan 33.75kN/m2.

Kirakan faktor keselamatan cerun.

71.5° O 37°

C D

6m

G
A B
E

F
2.75 m

F =
∑ Momen daya rintangan
2

∑ Momen daya penggerak


2

Momen daya penggerak:

disebabkan oleh berat tanah = Wd


= 87 × 17.60 × 2.75
= 4220kN.m

Momen daya rintangan:

• di sepanjang BFE

18
= Daya × Jarak
  π 
= 33.75 × 11.75 ×  71.5 ×  × 11.75
  180 
= 5817.1kN.m

• di sepanjang ED

= Daya × Jarak
  π 
= 21.5 × 11.75 ×  37 ×  × 11.75
  180 
= 1917.64kN.m

Jumlah momen daya rintangan:

= 5817.1 + 1917.64

= 7735kN.m

Faktor keselamatan:

7735
F =
4220
= 1.83

Untuk menentukan faktor keselamatan sebenar cerun ditentukan dengan memeriksa


permukaan gelansar lain. Tindakan ini diteruskan sehingga F yang paling minimum
diperolehi dan F ini merupakan nilai faktor keselamatan cerun.