Sheet & Purlin
Sheet & Purlin
Sheet & Purlin
GIDDHA UNIT
SHEET REQUIREMENTS - PAINTING SHED
REMARKS
650 SQM
650 RMS
90 RMS
`
1. Scope
Effected Zone (HAZ) on the parent metal and components. They are non-destructive testing methods fo
discontinuities that are open to the surface such as cracks, porosity and lack of fusion by liquid penetr
2. Purpose
The purpose of this procedure is to explain the method of applying the liquid penetration non-destructive
3. References
t metal and components. They are non-destructive testing methods for detecting
he surface such as cracks, porosity and lack of fusion by liquid penetrant testing
plicable edition/addenda.
licable edition/addenda.
Div1-applicable edition/addenda.
applicable edition/addenda.
ition.
The NDT Inspector shall be responsible for conducting and reporting the results of inspection in accord
6.1 All personnel involved in Penetrant Examinations shall be qualified in accordance with the Require
6.2 When the written practice is revised, the certification of NDE personnel remains valid to the requir
6.3 The certification of personnel shall be checked by the QA/QC Manager prior to work commenceme
7. Procedure
This procedure shall be demonstrated prior to use in accordance with the requirements of T-150, ASME
7.1 Equipment:
a) Penetrant. b) Penetrant remover/cleaner. c) Developer. d) Lint free cloth. e) Light meter capable o
7.2 Materials:
7.2.1
Only materials of a recognized commercial quality shall be used as identified by the manufacturer’s na
7.2.2 Penetrant materials of the same family group shall be used, mix between family groups is
7.2.3 Certification of contaminant content shall be provided by manufacturers for all liquid penetrant
7.3.1 Generally satisfactory results may be obtained when the surface of the part is in the as-welded,
1500 2250000
1300 1690000
3940000
1984.943
ults of inspection in accordance with project contract .
cordance with the Requirements of Trinity NDT Written Practice for NDE Personnel Qualification.
remains valid to the requirements of the previous revision until the expiry date of the personnel qualification certificate; then, re
quirements of T-150, ASME Code Sec. V. The procedure qualification record shall be attached to this procedure.
h. e) Light meter capable of measuring visible light intensity in lux / foot candles (f.c.). The light meter shall meet the calibration
d by the manufacturer’s name i.e. Ardrox, Ely Chemicals or Magnaflux or as specified by the client.
ers for all liquid penetrant materials used on nickel base alloys, austenitic or duplex stainless steels, and titanium. These certificat
e part is in the as-welded, as- rolled, as-cast, or as forged condition. Surface preparation by grinding, machining, or other methods
fication certificate; then, recertification to the requirements of the new revision is required.
nd titanium. These certifications shall include the penetrant manufacturers' batch numbers and the test results obtained in accord
machining, or other methods may be necessary where surface irregularities could mask indications of unacceptable discontinuities
st results obtained in accordance with Mandatory Appendix II of Article 6, ASME Code Sec. V. These records shall be maintained as
unacceptable discontinuities. Precautions shall be made with the mechanical cleaning not to close the discontinuities open to the
cords shall be maintained as required by the referencing Code Section.
discontinuities open to the surface. Etching of the cleaned surfaces may be necessary to open the discontinuities.
continuities.
501
68
40
609
110
1800 50 POST + CLEAT ISA 75 X 75 X 8
1013 50 SUPPORT ISA 50 X 50 X 6
5760 50 PURLIL ISMC 100
8573
ITEMS DESCRIPCTION
POST + CLEAT ISA 75 X 75 X 8
SUPPORT ISA 50 X 50 X 6
PURLIL ISMC 100
TOTAL
171
WEIGHT IN MT Remarks
1.8
1.1
5.8 50 Posts
8.7
Details required
Spec. Required
30 5
15
460 SQM
57.5 12