Pumps
Pumps
Pumps
07
31.26
18.75
23.79
13.53
68.62
28.42
32.49
14.24
22
42.9
83.18 Internal Walls 775.04
30.59 Floors 1499.26
73.55 266.219
74.49 2540.519
9.12
17.91
15.11
7
31.51
18.58
5.09
14.5
9.87
12.66
4.26
6.08
7.04
9.82
1.16
8.4
5.5
2.36
1.19
775.04
1041.259
165.62
Footings
Qty 17
Size 1.3 1.3 0.5
Rebar Diameter 14
Rebar length 1.5
Total Concrete Quantity 14.365 m3
Straps
Size 0.2 0.5 71.3
Rebar Diameter 14
Rebar length 108 m
Stirrups Length 648 m
Total Concrete Quantity 7.13 m3
1113
Columns
Slab
.D 5410
5568
1080
1983
2040
3600
1000
1356
D 5510.7
1120
1978.2
1700 78672.15
63872
491.701
88000
Beam Length 65.8
Beam volume 3.948 concrete 960
length of rebar D 14 329 4.569444 450 kg 1575
length of Straps D 6 329 0.877333 100kg 420
wall area 171.55 197.4
no of blocks 2230.15 block 3345
no of cemen bag for block 42.8875 cement 720
sand 2.7448 sand 300
no of architrave 10 1000
labor for block 1579.2 1579.2
labor for beams 1974 2632
concrete slab concrete 3335
rebars 4588.889
labor 600 600
shuttring 1620 2025
length of arround beam 40
concrete 1004
rebar 14 2.222222 875
labor 1200 1600
25096.09 8436.2
13.5
45000
4753.2
21*12+224+20*12+19*12
ELEV1 150 m Q= VA
ELEV2 200 m 𝑸/𝑨
V= 7.7 m/s
f 0.003
D 200 mm 𝑷𝟏/ɣ + (𝑽_𝟏^𝟐)/𝟐𝒈 + 𝒛_𝟏 + 𝑬_𝒑 =
L 300 m 𝑷𝟐/ɣ + (𝑽_𝟐^𝟐)/𝟐𝒈 + 𝒛_𝟐 + 𝒉_𝒇
Q 0.244 m3/s 𝑷_𝟏= 𝑷_𝟐=
s.goil 0.87
𝑷_𝒂𝒕𝒎
𝑽_𝟏 =0
𝟏𝟓𝟎 + 𝑬_𝑷 = (𝑽_𝟐^𝟐)/𝟐𝒈 + 200
Ƞpump 78% + f 𝑳/𝑫 (𝑽_𝟐^𝟐)/𝟐𝒈
Ignore minor losses 𝑬_𝑷 = 66.92 m
0.714286
IPE 200A S235 2 X 10.4 Column
IPE 200A S235 2 X 12.4 Column 12 haunch
IPE 160A S235 2 X 10.4 Column
IPE 160A S235 2 X 12.4 Column
IPE 220A S335 6 X 4.75 Main Stairs Beam
IPE 160A S235 128
UPN 140 S235 22
Angle 100x100x10 60 Bracing