UPPER SOLU HYDROELECTRIC PROJECT

CABLE SCHEDULE FOR INTERCONNECTION SUBSTATION (TINGLA)


CONTROL CABLE SCHEDULE
DATE: - 22/12/2022
CABLE CONNECTION CONNECTION DETAILS
CABLE
CABLE CODE CABLE DATA FROM REMARKS
NO. FROM TO
Main T.B T.B.No. T.B.No. Main T.B

CONTROL CABLES SCHEDULE


X:ISO 8 111 Common
132 kV Outdoor Isolator X:ISO 9 112 89A Isolator closed signal to LRMP
C 7001 1.1 KV CU, PVC 4C X 1.5 mm2 TRMP-1 without earth switch X:ISO 10 110 TB 89A Isolator opened signal to LRMP
(Bay1)
Terminal 111 & 109 to be shorted in isolator
X:CB 1 101 X3 Common
X:CB 2 102 X3 CB Position
X:CB 10 27 X1 Common
X:CB 11 28 X1 SF6 Pressure Block
X:CB 12 30 X1 Spring Charge Indication
132 kV Outdoor Circuit X:CB 5 109 Common
C 7002 1.1 KV CU, PVC 10C X 1.5 mm2 TRMP-1 X:CB 6 110 CB Open Signal
Breaker
X:CB 7 108 X3 CB Close Signal
X:CB 8 113
CB Auto trip Signal
X:CB 9 114
Terminal 27 & 29 to be shorted in breaker.
Terminal 109 & 107 to be shorted in breaker
3 1 110 V Positive Supply
4 39 CB Protection Trip
X:TC1 6 10 CB Remote Trip 1
7 39 CB Trip Coil 1 for Post Close Supervision
132 kV Outdoor Circuit 8 38 CB Trip Coil 1 for Pre Close Supervision
C 7003 1.1 KV CU, PVC 10C X 1.5 mm2 TRMP-1 X1
Breaker 3 43 110 V Positive Supply
4 41 CB Protection Trip
X:TC2 6 11 CB Remote Trip 2
7 41 CB Trip Coil 2 for Post Close Supervision
8 40 CB Trip Coil 2 for Pre Close Supervision
3 1 110 V Positive Supply
4 9 CB Remote Close
5 26 CB Auto Re Close
13 81 Common
132 kV Outdoor Circuit
C 7004 1.1 KV CU, PVC 10C X 1.5 mm2 TRMP-1 X:CB 14 82 X1 Motor supply MCB fail
Breaker
15 84 Heater supply MCB fail
16 86 Power socket MCB fail

1 5 Common
2 6 OTI Trip
3 10 LV WTI Trip
4 14 Buchholz Trip
5 20 Tank PRV Trip
C 7005 1.1 KV CU, PVC 10C X 1.5 mm2 TRMP-1 Transformer X:TRF 11 4 X1 OTI Alarm
12 8 LV WTI Alarm
13 12 Buchholz Alarm
14 16 MOG Low Alarm
15 18 MOG High Alarm
X1 5 and X1 10 shorted in TRF MB