Close Turfing
Close Turfing
Close Turfing
1. INTRODUCTION
This method statement covers the following work activities associated with the requirement
of the contract document for (your project's name).
It is intended to assist site personnel in carrying out the performance of the activities. It also
serves to demonstrate to the client that we as the contractor understand the work scope
and is capable of undertaking it.
2. EQUIPMENT
a) Back Pusher
b) Water Pump and Pipe
c) Drum / Water Tank
d) Lorry
e) One Tonne Roller Compactor
3.1 Topsoil
Topsoil is the original surface layer or soil from cultivated land or forest area. It does not
generally include soil from swampy area, padi field or tin mining areas.
It is usually a darker shade of brown, grey or red than the subsoil that lies immediately
beneath it. Topsoil tends to be friable and show some degree of porosity. It should be free
from subsoil, admixture of stones, lumps, plants or roots and other extraneous matter.
Topsoil shall not deliver or used while in a muddy condition.
4.5 Watering
Watering shall be carried out immediately after the completion of planting. The completed
areas shall be lightly sprayed with water and keep the areas moist.
4.6 Maintenance
Maintenance shall begin immediately after each portion of turfed and planting area is
installed and shall continue for the period of maintenance as specified commencing from
the date of acceptance. Maintenance is including watering, fertilizing, spraying and mowing.
NPK 15:15:15 shall be used after 3 months planted at the rate of 100gms per square meter
and continue the application every 3 months.
NPK 15:15:15 shall be used at the rate of 200gms for each plant every month for the first
year period. For the next year after, fertilizing shall be continued every 4 months. This
fertilizer must be applied around the plant, outside the canopy area.
5.1 Safety
1) The workers shall provide with PPE (Personal Protective Equipment) and shall be
worn all the time.
2) During fertilizer work, the workers shall provide additional equipment such as
safety goggles and mouth and nose filters to avoid contact with fertilizer.
3) Site safety member should be available at all the time.
5.2 Environmental
1) The Contractor shall ensure no open burning is allowed at the site.
2) All the waste shall be collected and disposed correctly.
3) The Contractor shall ensure there is no oil leakages from machinery (cutting
machine) which is could harm the environment.