10 MEt 2013
Project Title
FT006/041/93 RM 52,452.00
12.03.2013 20.03.2013
06.04.2013 12.04.2013
1
:ront Cover
2 Content
3 Appendix
2.'l :ield Results (to include Job No.)
l-1.1 Boreloo
3.1.'l.1 Proiect Title
3.1.1-2 Client's Name
3.1.'1.3 Consultant's Name
3.1.1.4 Reduced Level
3.1.'1.5 Date Start / Finish
3.1.1.6 Ground Water Level
3.1.1.7 VaneShear
3.1.1.8 Permeability Test
3.1.1.9 Standpioe
3.1.1.10 Endorsement bv Engineer / Geologist
3.1.2 MP / JP
3.1 .2.1 Proiect Title
3.1.2.2 Reduced Level
3.1 .2.3 Date Start / Finish
3.1.2.4 Final Depth
3.1.2.5 Suoervisofs Name
3.1.3 Soil Profile
3.1.3.1 Proiect Title
3.1.3.2 Client's Name
3. 1.3.3 Cross Section BH to BH
3,1.3.4 Soficoov
3.2 LaboratorY Test Results
3-2.1 Summarv of all Laboratorv test results (Table)
3.2.2 Detail for each test results.
3.2.3 EndorsementbyLab. Engineer/Lab. Executive
3.2.4 Laboratory results in Excel format (softcopy)
3.3 Site Photoqraphs (in colour)
3.3.'l Proiect Tltle
3.3.2 Caption
3.3,2.1 Site View
3.3.2.2 BH / MP / JP (No)
3.3.2.3 Sample (DS & UD)
3.4 Site Plan (clear coDv)
1.4.1 Proiect Title
J.4.2 BH IMP I JP Position (No)
4.3 Conect Plan (Reduced Level, Coordinates and Water Table Legend)
1.4.4 AutoCAD softcopy
3.5 lD Coov
3.5.1 Comolete report in PDF format
5.2 All photo of machine, works and sample.
.5.3 Field results MORD, E(CEL, etc)
3.5.4 Laboratorv results (WORD, EXCEL, etc)
5.5 As Built Drawing / Final locatiolv5 !1qp99ecl!qga'!!en -/
3.6 fuork Proqram
BORANG PENGESAHAN LAPORAN PENYIASATAN TANAH
( KONTRAKTOR PENYIASATAN TANAH )
CERTIFICATION:
l, do hereby certify that att items reported in this report are factua[ and att works
reported herein were carried out in accordance with the specification given by the
ctient and MS 1055:2005, MS 2038:2006, other code specified and good engineering
practice.
VERIFIED BY,
(Signot
Date ro.cr5.9ol3
BORANG PENGESAHAN LAPORAN PENYIASATAN TANAH
( PROFESIONAL ENGINEER)
CERTIFICATION:
I hereby confirm that the soil investigation for this project was supervised by me or under
my direction and supervision and compl.y with the retevant standards and codes of
practice
by Law and regulations.
le IftOFfD
(with P. Eng. StamP)
(
\ A^\#
Name'-ryaqaygth
-'\*-*--*-tll ,""',tttOHO AZHARI BIN MOHD SAPIE
project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT0061041/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN MOHD SAPIE
tc 830916-07-5727
PE No. 15218
Ptan, anatyze and check Scope of works and proceses in order to make sure
1
the project witt be finished on time.
Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.
Ensure proper site supervision, data togging and sampte handting in order to
5 gain quatitY resutts.
Ensure atl samptes taken are delivered to quatified laboratory and the
6
taboratory schedute is been prepared by designer.
Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG, JKR.
*please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
PROJECT TEAM DETAILS
Manager
Team 1
Geologist
Laboratory
9E
B6
E
E E
sN |'r)
.o
N s'! <i
E o NE
=trl
Eo.
9 CDY
N*
I
l xs
o u &t3
|,\ y o.x
q)
o )
v 'l
J
;t g x>_ o
c
o) +q F
c 'x .U'
x
(, .3
LU UJ
z X
tll
F
tn cd
E
$l
E
lr)
o \o
ET
l- F
e sH
o oo X'rl x
o
J
.=
E o
Nd
Io. (*
Fr
mv
o X-t ;i co ;.< =y
IrJ
II
o
o o
o
aig
T'CI
y 9u
ta a)
II U
o o-
x> o X>- O
c
c
:F Fo
q
'x
t, x
trt LU
vl
f oo
tn Eg
.9 s, .f N
EE
=o
AE
o
u
*O.,
s6
U>
$gp
cF:.o
=c Eilg-
sY ,o F nri5
o. x F-
€F;s
C-:.
'?d-
NO)
'i- :
AI V F:
^i +-
.-ioo
o 6a
a CD€
g3 .t5
LL
'.E
v, c\
o T
co
I
6
zo N
SUMMARY OF LABORATORY TESTING
I Moisture Content
e
z Liquid Limit
J Plostic Limif
4 Plosticity Index 3
5 Specific Grovity
6 Porticle Sizo Distribution- Coorse 5
1 Porficle Sizo Distribution- Fine
8 Bulk Density
I Unconfined Compression Strength 6
(Rock)
10 Point Loqd Index 4
{
Unit Remarks
No Ty!e
1
(nindle Marhine 1
Casinqs (NW)-3m 12
5
7
6 Rods (BW)-1.5m
Rods (BW)-3m 20
7
1
8 Sptit Spoon SamPter
9 UD SamPter
10 Mackintosh Probe(-m)
11 Hand Auger(-M)
12 PVC Pipe
13 Cement (borehote marker)
14 Sand (borehote [4I!9I)
Date : L2.03.2073
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotekhik, lbu Pejabat JKR Mataysia
Project : Kerja-kerja
Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Putau Pinang.
Rsin ShosPr
From :1300 hrs to :1600 GFsd C$nditiOn
QUALITY
Test (BH/MP/ Work Done For The Day Inspection Result/Description
(SPT N-value, Type of soil, casing(m) rod(m),etc
d#qi
Name :Luklrrdifr-Hakim Bin Ahmad
: 12.03.
Date :72.03.2O73
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jalan dan Geotelinik, lbu Pejabat JKR Mataysia
Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FTOO6{A41/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN &TOHD SAPIE
tc 830916-07-5727
PE No. 15218
: 6-10yrs :
z 10yrs t :
Ptan, anatyze and check scope of works and proceses in order to make sure
1
the project witt be finished on time.
Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.
Ensure proper site supervision, data togging and sample handting in order to
5
gain quality resutts.
6
Ensure atl samptes taken are delivered to quatified taboratory and the
taboratory schedule is been prepared by designer.
Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG. JKR.
*Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
l8l Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotelinik, lbu Pejabat JKR Mataysia
Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Pulau Pinang.
Rain ShD!.r€r
frr"t&F'Q$fi;',
PreparedrrTrM
$z:-;: ''
Name
Y
:Lt!6mao Hakim Name
r\ BintV#SBpie
Bin Ahmad
\"no\'' r,'
Date :13.03.2013
Date ' th*..trN*--{-
Unit Siasatan Tanah, Cawangan Kejuruteraan Jalan dan Geoteknik, lbu Pejabat JKR Mataysia
5 Casines (NW)-3m 12
6 Rods (BW)-1.5m 2
7 Rods (BW)-3m 20
8 Sptit Spoon Sampter 1
9 UD Sampte
10 Mackintosh Probe( m)
11 Hand Auqer( M)
12 PVC Pipe
13 Cement (borehote marker)
14 Sand (borehole marker)
PR0,rg;
"^{tRh
Sffi.%
,-4'.-!.{'*!.4
Date :13.03.2O13
l$l Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotelinik, lbu Pejabat JKR Mataysia
Project : Kerja'kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FIO06{041/93 Barat Daya,
Pulau Pinang.
PE Name : MOHD AZHARI BIN MOHD SAPIE
lC : 830916-07-5727
PE No. :15218
Experience in Supervision on Site Investigation : 1- yrs z I
5
: 6-10yrs :
: 10yrst :
NO ROLES AND RESPONSIBILITIES
Ptan, analyze and check scope of works and proceses in order to make sure
1
the project witt be finished on time.
Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.
Ensure proper site supervision, data logging and sampte handting in order to
5
gain quality results.
6
Ensure alt samples taken are delivered to quatified laboratory and the
laboratory schedute is been prepared by designer.
Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG, JKR.
*Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
I
Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteknik, lbu Pejabat JKR Mataysia
5 Casinqs (NW)-3m 12
6 Rods (BW)-1.5m 2
7 Rods (BW)-3m z0
8 Sptit Sooon Samoler 1
9 UD Sampter
10 Mackintosh Probe(_m)
11 Hand Aueer( M)
17 PVC Pipe
13 Cement (borehote marker)
14 Sand (borehote marker)
Date :14.03.2013
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotelinik, lbu Pejabat JKR Mataysia
Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Putau Pinang.
Rrin ShrqEr
From :0900 hrs to :1830 hrs Gssd Csilditiiln
BH1 2.10 Start boring in rock using NW casing with iron bit from
to level 2.1m to 3.3m.
3.30
ffi
Prepared By,
Name
74*
:Lukhmaf Hakim Bin Ahmad
checkedBy, f
ffii
"/ CgVi;- \{"
Sapie
\
Date :14.03.2013
"km"
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotelinik, lbu Pejabat JKR Mataysia
Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FTOO6{O41/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN MOHD SAPIE
rc 830916-07-5727
PE No. 15218
: 6-10yrs :
: 10yrs + :
Ptan, anatyze and check scope of works and proceses in order to make sure
1
the project witt be finished on time.
Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.
Ensure proper site supervision, data togging and sampte handting in order to
5
gain quality results.
6
Ensure a[[ samptes taken are delivered to quatified laboratory and the
laboratory schedule is been prepared by designer.
Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG. JKR.
*Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
{
Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteknik, lbu Pejabat JKR Mal.aysia
5 Casines (NW)-3m 12
6 Rods (BW)-1.5m 2
7 Rods (BW)-3m 70
8 Solit Sooon Samoter 1
9 UD Sampter
10 Mackintosh Probe(_m)
11 Hand Auser( M)
12 PVC Pipe
13 Cement (borehote marker)
14 Sand (borehole marker)
5l:*tumrr"';x
Prepared By
g1l: ?.qo*o SAPIE
Project : Kerja-kerjaPenyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Putau Pinang.
Rrin ShrI.Jer
From :0900 hrs to :1200 hrs Gtlrrd ff,nditirln
MANPOWER
Test (BH/MP/ Work Done For The Day I nspection Resu lt/Description
From _m to _m (SPT N-value, Type of soil, casing(m) rod(m
Checked 8y,
Name :Lukhman Hakim Bin Ahmad Name :naohd nzhati ein rvrLaisairie ,!'"
Date :15.03.2013
Date : 15.03.2013 ^.,. , _. ,..
I---'^r*.l Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geote*nik, lbu Pejabat JKR Mataysia
l*- |
Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FTOO6{O41/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN MOHD SAPIE
rc 830916-07-5727
PE No. 15218
: 6-10yrs :
: 10yrs i :
Ptan, anatyze and check scope of works and proceses in order to make sure
1
the project witt be finished on time.
Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.
Ensure proper site supervision, data logging and sample handting in order to
5
gain quatity results.
6
Ensure atl samples taken are detivered to quatified laboratory and the
laboratory schedule is been prepared by designer.
Check, verify and endorsed the finat report prior submitting to the Unit Sl,
7
CKJG, JKR.
*Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
{
Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteknik, lbu Pejabat JKR Mataysia
5 Casines (NW)-3m 12
6 Rods (BW)-1.5m 2
7 Rods (BW)-3m 20
8 Sptit Spoon Sampter 1
9 UD Sampter-
10 Mackintosh Probe( m)
11 Hand Auser( M)
12 PVC Pioe
13 Cement (borehote marker)
14 Sand (borehote marker)
finenor$,.
,"ff\:{/fi
Date : 16.03.2013
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotekhik, lbu Pejabat JKR Mataysia
Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Putau Pinang.
Rein Shower
From :0900 hrs to :12ffi hrs Gold ConditiBn
3.60
Termination of drilling in rock at level 4,6m.
to
Boring in rock using NW casing.
4.60
CR=1000mm, CRR=650mm
4.60
Boring in soil.
to
4.80
Boring in rock.
ffia
4.80
Sample taken.
to
CR=1000mm
s.80
CRR=950mm
u--;/ *7-
Name Lukhman Hakim Bin Ahmad Name ,*[IIG"'qBj?g"
Date :16.03.2013
Date ,ro.o\zors L---"t
ri_
-- .--'
fm Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteknik, lbu Pejabat JKR Mataysia
Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makma[ Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FTOO6{041/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN MOHD SAPIE
tc 830916-47-5727
PE No. 15218
Plan, analyze and check scope of works and proceses in order to make sure
I
the project witt be finished on time.
Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.
Ensure proper site supervision, data logging and sampte handting in order to
5
gain quality resutts.
Ensure att samples taken are detivered to quatified laboratory and the
6
laboratory schedute is been prepared by designer.
Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG, JKR.
"Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
ID Task Name Duration Start Finish % Complete
March Aoril Mav
6 2t24 3t3 3t1O 317 3!24 3t314!7 4t14 4t21 4t28 5t5 st12
1 SOIL INVESTIGATION WORKS FOR GADANGAN MENGGANTIKAN 47 days Mon 3/11113 Mon 5/6/13 1OO%
JAMBATAN SEDIA ADA DI JAMBATAN FT136/I79/15 KULIM KEDAH &
JAMBATAN FTOO6/041/93 BARAT DAYA PULAU PINANG
4 Field Work & Laboratory Test 4/-days Mon 3/11/13 Wed 5/1113 100%
5 JAMBATAN FTOO6/041/93 43 days Mon 3/11/{3 Tue 4130t13 100o/o
23 Draft Final Report and Amendment Comment From Client 3 days Wed 5/1/13 Fri 5/3i13 100%
24 Submission of final Report 2 days Fri 5/3/13 Mon 5/6i 13 100o/o
Page 1
DEEP ROCKS SDN. BHD. 2013
TABLE OF CONTENTS
1. INTRODUCTION…….…………………………………………………………….…..1
2. SCOPE OF WORKS…..………………………………………………………………..1
3. FIELD…….……………………………………………………………………………..2
i. Boring….………………………………………………………………………………2
ii. Standard Penetration Test…...…………………………………………………………2
APPENDIX
1. INTRODUCTION
The report presented is on the soil investigation carried out Kerja-kerja Penyiasatan Tanah
Dan Ujian Makmal Bagi Projek Cadangan Menggantikan Jambatan Sedia Ada Di
Jambatan FT006/041/93 Barat Daya, Pulau Pinang. The client is Jabatan Kerja Raya
Malaysia.
Deep Rocks Sdn. Bhd. was awarded the contract to carry out the soil investigation work for
the proposed project. Originally two (2) numbers of deep boreholes was carried out to obtain
the geotechnical information of the above site.
2. SCOPE OF WORKS
i. Explored the subsoil condition at the proposed site by two (2) exploration boreholes.
ii. Carried out Standard Penetration Test.
iii. Obtain disturbed and undisturbed samples.
1
DEEP ROCKS SDN. BHD. 2013
3. FIELD EXPLORATION
a) BORING
Field exploration was carried out using multi-speed rotary boring machine and tripod.
These boreholes were drilled by local trained drillers under direct supervision of our
technicians according to instructions and specifications given.
The boreholes were lined with NW casings of 75 mm. Outer diameter to prevent the
collapse of the boreholes wall. These boreholes were washed by circulating water and
disturbed samples were collected for visual examination.
The Standard Penetration Test (SPT) was carried out at 1.5 m interval. Basically, the
test was conducted by dropping a self - tripping hammer of 63.5 kg from a fixed
height of 75 cm. The numbers of blow for the initial 15 cm was recorded as the
seating drive.
The N value is the number of blows to penetrate the subsequent 45 cm. Nevertheless,
if the number of blows ever reached 50, the test was terminated and the corresponding
penetration recorded. Each sample obtained from the sampler in the field was
examined and classified by our technicians.
Representation portions of each sample were sealed in polythene bags and labeled
indicating and depth taken and send to our laboratory. Standard Penetration Test
results were shown in the boring logs as shown in APPENDIX A.
2
DEEP ROCKS SDN. BHD. 2013
4. LABORATORY TEST
The following laboratory tests were carried out in accordance with the procedure in BS.
1377 Part 2: 1990 and BS. 1377 Part 3: 1990 on selected samples of various penetrations
(APPENDIX B).
Classification tests
i. Natural Moisture Content
ii. Bulk Density / Dry Density
iii. Atterberg Limit
iv. Specific Gravity
v. Linear Srinkage
vi. Particle Size Distribution for coarse-grained soils
vii. Particle Size Distribution for fine-grained soil
viii. Unconfined Compression Strength
ix. Point Load Index
3
DEEP ROCKS SDN. BHD. 2013
APPENDIX A
(BORING LOG)
DEEP ROCKS SDN BHD BORELOG BOREHOLE NO : BH 1
SHEET NO : 1 OF 1
Project : KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK CADANGAN MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN FT 006/041/93 BARAT
DAYA, PULAU PINANG.
Classification
(Casing Size)
Recovery (%)
Graphic Log
British Soil
Type & No
SPT Test Results Rock
Depth(m)
Vane Shear
Legend
Scale
Remoulded
Undisturb
CRR (%)
RQD (%)
Blow (Seating & Test)
CR (%)
/cm 75m 75m 75 75m 75 75m
m m mm m mm m
0 10 20 30 40 50
Pavement material D1 0.00 0
0.5
1
1
1.5
Hard, white with black spot Granite C1 1.50 - 300mm 35mm NIL
1.80
2
2
Hard, white with black spot Granite C2 2.10 - 1200mm 1000mm 45mm
3.30
2.5
3
3
3.5
4 4
4.5
Depth (m)
C3
fractured rock 5.70 1500mm 1250mm 85.6mm
5.5
6 6
5.70 - 6.5
7 7
7.5
8 7.20 -
8
9
9
Ground Water Level (Measured from Ground Level)
END OF BH 1 AT DEPTH : 8.70 M
DATE : 15.03.2013 Date Time Borehole Casing Water
WATER LEVEL : 3.2 M (dd/mm/yyyy) (hh : mm) Depth (m) Depth (m) Level (m)
9.5
10
10
18.03.2013 10.00 a.m 8.70 3.20.
REMARKS :
LEGEND :
Pressuremeter Test (PMT) Standard Penetration Test (P) Attemped (UD),(OD),(PS), (MZ) & (DS)
Vane Shear Test (V) Undisturbed Samples (UD) Piston Sample (PS)
Open Drive Thickwall Sample (OD)
Permeabillty Test (PBT)
Mazier Sample (MZ) Cone Run
Packer Test (PKT) DenisonSample (DS)
Note : m.b.g.l - meter below ground level
DEEP ROCKS SDN BHD BORELOG BOREHOLE NO : BH 2
SHEET NO : 1 OF 2
Project : KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK CADANGAN MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN FT 006/041/93 BARAT
DAYA, PULAU PINANG.
Classification
(Casing Size)
Recovery (%)
Graphic Log
British Soil
Type & No
SPT Test Results Rock
Depth(m)
Vane Shear
Legend
Scale
Remoulded
Undisturb
CRR (%)
RQD (%)
Blow/ (Seating & Test)
CR (%)
cm 75m 75m 75 75m 75 75m
m m mm m mm m
0.5
1
1
2.5
3
P1 3.00 - 15.5 3 42/30 5 6 10 13 12 7
D2 3.45
3.5
4 3.60 -
Hard, white Granite with fractured rock C2 1000mm 650mm 83.10
4.60 4
4.5
5
Depth (m)
4.80 -
Very strong, white solid Granite C3 1000mm 950mm 100
5.80
5.5
.....
6
.... .
.... P2 6.00 - 88.9 6
50/30 8 12 10 10 14 16
Very dense, brownish silty fine to coarse SAND .....
D3 6.45
with very little Clay and some gravels .....
.....
6.70 - 6.5
Strong, white with black spot Granite C4 7.00 300mm 240mm 100
7
Very dense, yellownish to grey silty fine to 7
8 8 50mm
Moderately strong, white solid Granite C5 8.00 - 1000mm 870mm 100
9.00
8.5
9 9
REMARKS :
LEGEND :
Pressuremeter Test (PMT) Standard Penetration Test (P) Attemped (UD),(OD),(PS), (MZ) & (DS)
Vane Shear Test (V) Undisturbed Samples (UD) Piston Sample (PS)
Open Drive Thickwall Sample (OD)
Permeabillty Test (PBT)
Mazier Sample (MZ) Cone Run
Packer Test (PKT) DenisonSample (DS)
Note : m.b.g.l - meter below ground level
DEEP ROCKS SDN BHD BORELOG BOREHOLE NO : BH 2
SHEET NO : 2 OF 2
Project : KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK CADANGAN MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN FT 006/041/93 BARAT DAYA,
PULAU PINANG.
Classification
(Casing Size)
Recovery (%)
Graphic Log
British Soil
Type & No
SPT Test Results Rock
Depth(m)
Vane Shear
Legend
Scale
Remoulded
Undisturb
CRR (%)
RQD (%)
Blow/ (Seating & Test)
CR (%)
cm 75m 75m 75 75m 75 75m
m m mm m mm m
Very dense, yellownish gravels silty fine to coarse . . . . . P5 10.50 - 17.4 50/8 20 20 40 10
. . . . .
SAND with very little Clay and some gravels D6 10.73 10.5
. . . . .
. . . . .
11 . . . . .
5mm
.....
..... 11
Depth (m)
.....
.....
.........
. ... .
12 . ... . 11.5
. ... .
Very dense, yellownish silty fine to coarse SAND . ... . P6 12.00 - 54.23 50/14.5 20 15 25 25
. ... .
with some gravels .. D7 12.295
12
END OF BH 2 AT DEPTH : 12.295 M
5mm
DATE : 17.03.2013
13 WATER LEVEL : 1.70 M
14
15
16
17
18
19
Ground Water Level (Measured from Ground Level)
Date Time Borehole Casing Water
(dd/mm/yyyy) (hh : mm) Depth (m) Depth (m) Level (m)
18.03.2013 10.15 a.m 12.295 1.70
19.03.2013 10.00 a.m 12.295 1.80
REMARKS :
LEGEND :
Pressuremeter Test (PMT) Standard Penetration Test (P) Attemped (UD),(OD),(PS), (MZ) & (DS)
Vane Shear Test (V) Undisturbed Samples (UD) Piston Sample (PS)
Open Drive Thickwall Sample (OD)
Permeabillty Test (PBT)
Mazier Sample (MZ) Cone Run
Packer Test (PKT) DenisonSample (DS)
Note : m.b.g.l - meter below ground level
DEEP ROCKS SDN. BHD. 2013
APPENDIX B
(LABORATORY TEST)
Z-DSAC LAB ORATORIE,S (00r144285-D)
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FI 006/041/93 Barat Daya, Pulau Pinang.
Head Office : 12, Jalan Kesuma Ttl\,Bandarlasik Kesuma,43700 Beranang, Selangor Darul Ehsan. Tel i Fax :603-87247103
Laboratory : 5, Jalan Bukit Mewah 25, Taman Bukit Mewah,43000 Kajang, Selangor Darul Ehsan. Tel / Fax :603-87344267
c:o t-
o $
$
(o
o @
N
o6P ri d (o d
o
c)
-o
.!
o
(0
.!u
U)
Fs
@
rf)
N
|r)
$
lo s CO
.{-
o
g;< o, |'o
cf)
s
cf)
cf)
cr)
U'E
Fg
-E
ds (o \f F-.
I Ct)
E
_C
f gP E
:
A ;E Y
ds v o- n
sN s
rrJ
u' 3'- c)
q)
N z z N
Ee js o
F 8d cf) N cf)
A +(.o
tU:
l-6
5e
n-O gO)
o
r6 (o6
o+ q s (o
>:
'tlr o co
EH
co
c.=
U)
N z z c.i c.i
E
yt-= d Eco
53 .9>
o o
E-F
.. cJ j+ o,
< o>
Pg
(q q (0 q
N N
=*
Etr 6*0 N N N
og
m; 4 ?F sN o
qp d .F:
o) tr)
>oE (o o,
-r'
fa ;fi
Ets
oFE
d>
ro \ \ q oq
L ) >ci #E- v$ o, s o
o3 *sEaF
>; &z E€f .8;',
v6E
\
rO
q s
-
q o,
e
.f;^
E ffcD6€
=a
3*F 6
vF $ s
c,
o.
E
- fi- v5t3_
FsF-
E>:<
(!>-
z
N bx(/)
'*eg
e F::yt"i5 tr) o ra) lo ro o
=
f =F
sft s€3= €e
F- c{
lr)
f
cr) d
a o
; a? ro
o
c?
6O.O
B <
u, F,. F- F* o) N I.JJ
C**
c ooo
zzz
=HgEsR o
o E N F-
o @
o
N
o o
o v O
a<t'i
otr s ro $ CO F- @ ^i N 22u|z
L
o-
6-
N
o s o
U) ro cf) cr) $ ro N
E
gq)d o o n
9,* (l)(t)
.g!uO
F
t-u EZ N
.!2=O
=.91
(JOO- €*
oi I
m
T
co
Borehole Sample Depth Cont. Wt. of wet Wt. of dry Wt. of Wt, of Wt. of Moisture Average
n0. n0. (m) n0. soil + s6n1. soil + cont. container dry soil moisture content moisture
W2 (gm) W3 (gm) Wl (sm) W3 -W1 W2 -W3 (W2-W3A/V3-W1) content
x100 P/o\
BH1 D2 3.00 M1 54.39 49.50 14.41 4.89 13.94
3.45 t{i2 FE N,I
50.01 14.21 35.80 5,00 IJ.Y/ 14
UJ 6,00 M3 57.11 51.93 IJ.OY 38.24 5,18 13.55
6,45 M4 56.68 5'1.48 13.54 37.94 5.20 tJ,/ | 14
D4 M5 47.90 46.54 12.99 33.55 t.Jo 4.05
M6 48.62 47.21 12.65 34.56 1.41 4.08 4
D5 9,00 M7 69.1 5 59.94 14j2 45.82 9.21 20.10
9.30 M8 69.38 60,01 13.68 40.JJ 9.37 20,22 20
D7 12.00 M9 60.78 60.31 15,07 45.24 0.47 1,04
12.30 M10 60,13 59.63 14.63 45.00 0.50 1.11 1
Z-DSAC LABORATORIES (00114428s.D)
iample No. BH2-D2 300-3.45m BF1Z - UJ b.UU - 6.45m BHz - D4 7,50 - 7.95m
Bottle No. s ,l
2 3 4 5 6
Mass of bottle * soil * water (m3) s 84.490 83.540 82.709 84.1 88 az.Yzz 84.390
Mass of bottle + soil (m2) g x7 \\1 3t.1tc 36.884 36.9'12 37.112 37.245
Mass of bottle * water (m4) s 77.865 77.428 78.1 1 I 79.415 78,228 79.398
Mass of bottle (m1) s 26.794 27,403 29,451 29.175 29.504 29.157
Mass of soil used (m2-m1) = m5 E 10.757 9.922 7.433 7.737 7,608 8.088
Volume of soil (m4-m1)-(m3-m2) = m6 ml 4j32 3.810 2.843 2.964 2.914 3.096
3pecific gravity of soil particle I.OUJ 2.604 2.614 2.610 2,611 2.612
Gs = m5lm6
Mean value 2.60 2.6',|, 2.61
LINEAR SHRINKAGE
( BS 1377 : Paft 2 : 1990 : 6.5 )
ATTERBERG LIMITS
Method of Testing: BS 1377 -Part2 - 1990 (Clause 4.5 - Casagrande Method)
Container + Wet Soil W1 (gm) 11.21 11.48 12.24 12,32 7.83 8.10
Container +Dry Soil W2 (om) 10.23 '10.65 11.42 11.75 7.01 7.21
Container W3 (qm) 8.02 8,04 8,04 3.60 J.C+
Water, W1-W2 W4 (gm) 0.98 0.83 0.82 0.57 0.82 0.89
Dry Soil, W2-W3 W5 (sm) 2.21 2.61 ??o 3.71 3,41 3.67
Water Content, W4/lV5 X 100 (%) 44.34 31.80 24.19 15.36 24.05 24.25
zH 7o.o
o
o
60.0
t 5o.o
H 4o.o
30.0
= 20.0
10.0
0.0
BLOWS (N)
Z-DSAC LABORATORIES (001i4428s D)
ATTERBERG LIMITS
Method of Testing: BS 1377 -Pafi2 - 1990 (Clause 4.5 - Casagrande Method)
BLOWS (N)
Z-DSAC LABORATORIE S (001144285 u)
ATTERBERG LIMITS
Method of Testing: BS 1377 -Paxt2 - 1990 (Clause 4.5 - Casagrande Metlod)
110.0
J
J 100.0
-
5. 90.0
i Bo.o
H
z 7o.o
o
o
60.0
t 5o.o
F
<l
40.0
30.0
= 20.0
10.0
0.0
BLOWS (N)
Z-DSAC LABORATORItrS (00ri4428s-u)
37.5 0.00 0,00 100,00 8.10 30 secs 7.02 o.6l 0.0720 7.02 22.82
20,0 0.00 0.00 100.00 8.11 1 min 6,85 6.65 0.0510 6.85 22,26
14.0 0.00 0.00 100.00 8.12 2 mins 6.55 6.35 0.0362 21.29
10.0 0,00 0.00 100.00 8.14 5 mins 5.20 5.00 0.0233 5.20 16.90
0,00 0.00 100.00 8.18 8 mins 4.20 4.00 0.0186 4.20
5,0 0.63 1.26 98.74 8.25 15 mins 3.55 0.0137 11.54
2,0 8.91 17.82 80.92 8.40 30 mins 3,35 3.15 0.0097 224 10,89
1.180 6,08 tz. lo 68.76 9.10 '1 hours 3.00 2.80 0.0069 3.00 9.75
0.600 5.88 11.76 57.00 10.10 2 hours 2.65 2.45 0.0049 2.65 8,61
0.425 2.66 5,32 51,68 12.10 4 hours 2.25 2.05 0,0035 2.25 7.31
0,300 3.85 7.70 43.98 14.10 6 hours 2,00 1,80 0.0028 2.00 6.50
0.212 3.35 6.70 37.28 8.1 0 24 hours 1,50 1.30 0.0014 1,50 4.BB
0.'150 3.65 7.30 29.98 Lab, Ref. :20404113
0.063 3,58 /. to 22.82 CLAY 7% Date Tested :09.04.2013
TOTAL 38.59 SILT 16% Tested By : Sedi
No.: BH2-D2 SAND 58% Weight of Sample (gr 50.00
Depth (m) 3.00 - 3.45 GRAVEL 19%
PARTICLE SIZE DISTRIBUTION IN SOIL
100.00
90.00 T
80,00
I 70.00
(9 60.00
z 50.00 ^"i'.1
U)
@ 40.00
)
o_ 30.00
20.00
.a'
10.00 t ".a"1
--,f a
0.00 i
DIAMETER (mm)
Z-DSAC LAB ORATORItr S (001144285.,r)
37.5 0.00 0.00 100.00 8.00 30 secs 2.39 2.19 0.0758 2,39 7.77
20.0 0.00 0.00 100.00 8.01 1 min 2.20 2.00 0.0537 2.20 7,15
14.0 0.00 0.00 100.00 8.02 2 mins 2,00 1.80 0.0380 2.00 6.50
10.0 0.00 0.00 100.00 8.04 5 mins 1.75 1.55 0.0241 I -7E 5.69
3.19 o.Jd 93.62 8.08 B mins 1.26 1.06 0.0192 1,26 4.08
5.0 8.99 17.98 75.64 8.15 15 mins 0,95 0.75 0.0140 0.95 3.09
2.0 5.17 10.34 65.30 8.30 30 mins 0,80 0.60 0.0099 0.80 2.60
1.180 4.60 9.20 56.10 9.00 t hours 0,75 0.0070 2.44
0.600 2.25 4,50 51.60 10.00 2 hours 0,72 0.52 0.0050 0.72 2.34
0.425 9.43 18.86 32.74 12.00 4 hours 0,70 0.50 0.0035 0,70 2.28
0.300 2,85 5.70 27.04 14.00 6 hours 0,60 0.40 0.0029 0.60 1.95
0.212 3.38 6.76 20.28 8.00 24 hours 0,40 0,20 0,0014 0.40 1.30
0.1 50 3,20 6.40 13.88 Lab. Ref. :20404113
0.063 3.05 6.10 7.78 CLAY 2 Yo Date Tested :09.04.2013
TOTAL 46,',!1 SILT 6 % Tested By : Sedi
Borehole/Sample No. : BH2 - D3 SAND 57 % Weight of Sample (gr 50.00
Depth (m) : 6.00 - 6.45 GRAVEL 35 o/o
100.00 i
l
90.00
80.00
s 70.00 f
o 60.00 af
z 50.00
6
a 40.00
o- 30.00
20.00
..a'
10.00
-5
0.00
0.0001 0.0010 0.0100 0.1000 1.0000 10.0000 100.0000
DIAMETER (mm)
Z-DSAC LAB ORATORItr S eu1442*s.D)
CIDB MALAYSIA No. 1 9911 02-SL0541 81
Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation
27F 0,00 0.00 100.00 8.05 30 secs 3.62 3.42 0.0748 3.62 11.77
20.0 0,00 0.00 100.00 8.06 1 min 3.50 ??n 0.0530 11.38
14.0 0,00 0.00 100,00 8.07 2 mins 3.20 3.00 0.0376 3.20 10.40
10.0 0,00 0.00 100.00 8.09 5 mins 3.00 2.80 0.0238 3.00 9.75
0,00 0.00 100.00 8.13 8 mins 2.50 2.30 0.0189 2.50 8.13
5.0 0.69 1.38 98.62 8.20 15 mins 2.15 106 0.0139 z. ta Aqq
2,0 16.16 JI,JI 66,30 30 mins 1.95 1.75 0.0098 1,95 6.34
1 .'t 80 10.94 21.88 44,42 9.05 '1 hours 1.60 1.40 0.0070 1.60 5.20
0.600 7.57 15.14 29.28 10.05 2 hours 1.42 1.22 0.0049 1,42 4.62
0.425 2.68 23,92 12.05 4 hours 1.20 1.00 0.0035 1,20 3.90
0.300 0.09 0.18 23.74 14,05 6 hours 0.95 0.0029 n06 ?no
0,212 2.08 4.16 19.58 8,05 24 hours 0.80 0.60 0.0014 0.80 2.60
0,1 50 2.13 4.26 15.32 Lab. Ref. :20404113
0,063 '1.75 11.82 CLAY 3 % Date Tested :09.04.2013
TOTAL 44.09 SILT I Yo Tested By : Sedi
Borehole/Sample No. : BH2 - D4 SAND 54 % Weight of Sample (gr 50.00
Depth (m) : 7,S0 - 7.9S GRAVEL 34 Yo
100.00
90.00
I
I Ii I
80.00
l/
70.00
E 60.00
o
z 50.00
6
o 40.00 J
o- 30.00
20.00
^+
..J"l
10.00 i>
0.00 a ?
0.0001 0.00'10 0.0100 0.'1000 1.0000 10.0000 100.0000
DIAMETER (mm)
Z-DSAC LABORATORIE S (001144285.D)
37.5 0.00 0.00 100.00 B.'15 30 secs 6,51 6.31 0.0725 6.51 21.16
20.0 0,00 0.00 100.00 8.16 1 min 6,35 6.15 0.0513 A?6 20.64
14.0 0,00 0.00 100,00 8,17 2 mins 6.10 5.90 0.0364 6.10 10 R?
10.0 0,00 0.00 100.00 8.19 5 mins 5.80 5.60 0,0231 5.80 18,85
A? 0.00 0.00 100.00 8,23 8 mins 5.20 5.00 0.0184 5.20 16.90
5.0 2.83 5,66 94.34 8.30 15 mins 4.50 4.30 0.0135 4.50 14.63
2,0 13.61 27.22 67.12 8.45 30 mins 4,00 3.80 0.0096 4.00 13.00
1.180 5,28 10,56 56.56 9.15 t hours 3,80 3.60 0.0068 3.80 12.35
0.600 3.94 7.88 48.68 10.15 2 hours 3,35 3.15 0.0048 3.35 10.89
0.425 1.62 3.24 45.44 12.15 4 hours 3,00 2.80 0.0034 3.00 076
0.300 2.54 5.08 40.36 14.15 6 hours 2.55 2,35 0.0028 2,55 8.29
0.212 4.12 8.24 32.12 8.15 24 hours 2.20 2,00 0.0014 2.20 /. tc
0.1 50 4.65 9.30 tz.6l Lab. Ref, :20404113
0.063 0.83 t.00 21,16 CLAY 8Yo Date Tested :09.04.2013
TOTAL 39.42 SILT 13% Tested By : Sedi
: BH2-D5 SAND 46% Weight of Sample (gr 50.00
Depth (m) 9.00 - 9.30 GRAVEL 33%
PARTICLE SIZE DISTRIBUTION IN SOIL
100.00
I
90.00
80.00
/'i
s 70.00
o 60.00 f
z 50.00
-a
a 40.00
Jn
30.00
j
20.00
l ...c' ii
10.00 i)* +fi"(
i
tl
0.00
0.0001 0.0010 0.0100 0.1000 1.0000 10.0000 100.0000
DIAMETER (mm)
Z-DSAC LABORATORIES (001144285-D)
37.5 0.00 0.00 100,00 8,20 30 secs 8,10 7.90 0.0711 8.1 0 26.33
20,0 0.00 0.00 100.00 8.21 1 min 8,06 7.86 0,0503 8.06 zo.zu
14.0 0.00 0.00 100,00 8,22 2 mins 8.00 7.80 0.0356 8.00 26.00
10.0 0.00 0.00 100.00 8.24 5 mins 7.65 7.45 0,0226 7AF 24,86
6.3 0.00 0.00 100,00 8,28 8 mins 7.42 7.22 0.0179 7.42 24.12
5.0 2.95 5.90 94.1 0 15 mins 6,54 6.34 0.0132 6.54 21.26
,t0 6n
2,0 12.62 25.24 68.86 8.50 30 mins 6,00 5.80 0,0094 6,00
1.180 4.95 oon 58.96 9,20 t hours 5.50 5.30 0.0067 17.88
0.600 3.56 7.12 51.84 10.20 2 hours 4.25 4.05 0.0048 4.25 13.81
0.42s 1,85 3.70 48.14 12,20 4 hours 3.35 3.15 0.0034 10.89
0.300 3.24 6.48 41.66 14.20 6 hours 3.00 2.80 0,0028 3,00 9.75
0.212 3,46 6.92 34.74 8.20 24 hours 2.65 t.4c 0.0014 2,65 8,61
100.00
90.00
80.00
70.00
E 60.00
o
z 50.00
U)
U) 40.00
(L 30.00
20.00
10.00
0.00
0.0001 0.0010 0.0100 0.1000 1 .0000 10.0000 100.0000
DIAMETER (mm)
Z-DSAC LABORATORItr S (001144285 u)
1 z
Samole No. BHI -C3 BH1 - C5
uepth (m) 4.20 - 5.70 5.70 -7.20
Length,h (mm) 102.00 106.00
Diameter,d (mm) 51.50 51.50
Weiqht ( om ) 534.56 553.53
Area ( mm2 ) 2083.91 2083.91
Volume ( cm3 ) 212.56 220.89
Density ( Mq/m3 ) 2.515 2.506
General Moisture Condition as-received as-received
Rate of Loading (kN/s) 2.5 2.5
Computed Compressive
Strength,C (N/mm2) 71,96
Strong Strong
( after testing )
sual descriotion
BH1 - C3 Strong, white, solid granite with little fractured rock.
BH1 - C5 Strong, white, solid granite.
Z-D SAC LAB ORATORItrS (001144285.,)
3 4 A 6
Sample No. BH2 - C3 BH2-C4 BH2 - C5 BH2 - C6
lJepth (m ) 4.80 - 5.80 6.70 - 7.00 8.00 - 9.00 9.40 - 10.55
Lensth,h (mm) 151.00 104.00 96.00 106.00
Diameter,d (mm) 76.00 52.00 52.00 52.00
Weiqht ( om ) 1806.50 548.60 497.36 556.12
Area ( mm2 ) 4538.29 2124.57 2124.57 2124.57
Volume ( cm3 ) 685.28 220.96 203.96 225.20
Densitv ( Mo/m3 ) 2.636 2.483 2.439 2.469
General Moisture Condition as-received as-recerveo as-received as-received
Rate of Loadino (kN/s) 2.5 2.5 2.5 2.5
Computed Compressive
Strength,C (N/mm2) 115.70 33.85
( after testing
very strong Strong Moderately Moderately
)
Stronq Stronq
rsual
BH2 - C3 Very strong, white, solid granite.
BH2 - C4 Strong, white with black spot boulders, granite.
BH2 - C5 Moderately strong, white, solid granite.
BH2 - C6 Moderately strong, white, solid granite.
.r-,
-
:-F-
--
f
-
\-ln-
If --L
G EOS OI L EN GI N EERT N G
(Company No. :001700965-K)
.-
I I
-- --
-
POINT---
L-OE TEST RESULTS . D|AMEtT|CAI TESt
( rsRM 198s )
-
PROJECT MENGGANTIMN JAMBATAN SEDIA ADA DI JAMBATAN FT 006 / 041 / 93 BARAT DAYA, PULAU PINANG.
--Er
-
--L
G EOSOI L EN GI N E ERI N G
(Company No. : 001 700963-K)
I
-.-I
---
--- -,
POINT-.JL-m TEST RESULTS . D|AMEtT|CAI TCSI
PROJECT : MENGGANTIKAN JAMBATAN SEDIA ADA DI JAI\4BATAN FT 006 / 041 / 93 BARAT DAYA, PULAU PINANG.
Diameter of Sample, D ( mm ) to 52
Area of Sample ( mm' ) 4536.46 2123.72
Volume of Sample ( cm' ) 462.72 131.67
Load at Failure, P ( kN ) 25.0 10.2
Point Load Strength,
uncorrected, ls ( MPa 5.51'l 4.803
)
APPENDIX C
(FHOTO)
Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.
Photo 1 : BH 1
Photo 1 : BH 2
Photo 1 : BH 1
Photo 1 : BH 2