KERAJAAN MALAYSIA

JABATAN KERJA RAYA MALAYSIA

KERJA.KERJA PENYIASATAN TANAH DAN UJIAN MAKII,IAL


BAGI PROJEK CADANGAN MENGGANTIKAN JA'I,TBATAN SEDIA
ADA DI JAMBATAN FTOO6/O41193 BARAT DAYA,
PULAU PINANG.

LAPORAN AKHIR PENYIASATAN TANAH

10 MEt 2013

JABATAN KERJA RAYA MALAYSIA


PROJECT SUMMARY

Project Title

KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK CADANGAN


MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN FT006/041/93 BARAT DAYA,
PULAU PINANG.

Professional Engineer S.I. Contractor

Mohd Azhari Bin Mohd Sapie DEEP ROCKS SDN BHD


No.145, Tingkat Bawah,
Kompleks Alor Setar, Lebuhraya Darulaman,
05100 Alor Setar,
Kedah Darul Aman.

Job. No. S.I. Cost

FT006/041/93 RM 52,452.00

S.I. Start Date S.I. Completion Date

12.03.2013 20.03.2013

Laboratory Test Start Date Laboratory Test Completion Date

06.04.2013 12.04.2013

Scope of Work Laboratory Test Carried Out

i. 2 nos. Borehole i. Classification Test


ii. Specific Gravity
iii. Bulk Density

PRIVATE AND CONFIDENTIAL


Data in this document shall not be used or reproduced by unauthorized person or
persons without obtaining prior written permission from the Director General of Public
Works Department, Malaysia
FINAL REPORT CHECKLIST
NO ITEM DESCRIPTION PREPARE CHECK

1
:ront Cover

1.1 lcolour - Yellow


1.2 Jata Neoara" Looo
1e Keraiaan Malavsia. Jabatan Keria Rava
t.+ Proiect Title
IE Client's Name : JKR Loqo & Address
1.6 Dav. Month & Year of Submission
1.7 Ref. No.

2 Content

2-1 Prenared Bv : Contraclor & address


2.2 Sertifications: PE sionature & stamp
z-J 3ertifications: Contractor siqnature
2.4 Proiect Team Detail
2.5 Proiont Sr rmmaru
2.6 Summarv of Field Testino
2.7 Summarv of Laboratory Testing
2.8 Final Reoort Checklist
2"9 Table of Content
2.10 Page Numbering
. Start from Introduction Page
. Contractor's Name as Header (start from Table of Content Page' LEFT)
. Proiect Title as Footer (start from Table of Cqtlent Page, CENTER)
2.11 Reoort (lntroduclion, Obiective, Scope etc)

3 Appendix
2.'l :ield Results (to include Job No.)
l-1.1 Boreloo
3.1.'l.1 Proiect Title
3.1.1-2 Client's Name
3.1.'1.3 Consultant's Name
3.1.1.4 Reduced Level
3.1.'1.5 Date Start / Finish
3.1.1.6 Ground Water Level
3.1.1.7 VaneShear
3.1.1.8 Permeability Test
3.1.1.9 Standpioe
3.1.1.10 Endorsement bv Engineer / Geologist
3.1.2 MP / JP
3.1 .2.1 Proiect Title
3.1.2.2 Reduced Level
3.1 .2.3 Date Start / Finish
3.1.2.4 Final Depth
3.1.2.5 Suoervisofs Name
3.1.3 Soil Profile
3.1.3.1 Proiect Title
3.1.3.2 Client's Name
3. 1.3.3 Cross Section BH to BH
3,1.3.4 Soficoov
3.2 LaboratorY Test Results
3-2.1 Summarv of all Laboratorv test results (Table)
3.2.2 Detail for each test results.
3.2.3 EndorsementbyLab. Engineer/Lab. Executive
3.2.4 Laboratory results in Excel format (softcopy)
3.3 Site Photoqraphs (in colour)
3.3.'l Proiect Tltle
3.3.2 Caption
3.3,2.1 Site View
3.3.2.2 BH / MP / JP (No)
3.3.2.3 Sample (DS & UD)
3.4 Site Plan (clear coDv)
1.4.1 Proiect Title
J.4.2 BH IMP I JP Position (No)
4.3 Conect Plan (Reduced Level, Coordinates and Water Table Legend)
1.4.4 AutoCAD softcopy
3.5 lD Coov
3.5.1 Comolete report in PDF format
5.2 All photo of machine, works and sample.
.5.3 Field results MORD, E(CEL, etc)
3.5.4 Laboratorv results (WORD, EXCEL, etc)
5.5 As Built Drawing / Final locatiolv5 !1qp99ecl!qga'!!en -/
3.6 fuork Proqram
BORANG PENGESAHAN LAPORAN PENYIASATAN TANAH
( KONTRAKTOR PENYIASATAN TANAH )

AUTHENTICATION OF THE FACTUAL REPORT


PROJECT : KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK
CADANGAN MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN
FTOO6/041/93 BAMT DAYA, PUI.AU PINANG.

CERTIFICATION:

l, do hereby certify that att items reported in this report are factua[ and att works
reported herein were carried out in accordance with the specification given by the
ctient and MS 1055:2005, MS 2038:2006, other code specified and good engineering
practice.

VERIFIED BY,

(Signot

Name AHMAD BIN MAIDIN MASTAN

NRIC No. 530909-02-531 3

Date ro.cr5.9ol3
BORANG PENGESAHAN LAPORAN PENYIASATAN TANAH
( PROFESIONAL ENGINEER)

PROJECT : KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK


CADANGAN MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN
FTOO6/041/93 BARAT DAYA, PULAU PINANG.

CERTIFICATION:

I hereby confirm that the soil investigation for this project was supervised by me or under
my direction and supervision and compl.y with the retevant standards and codes of
practice
by Law and regulations.

le IftOFfD
(with P. Eng. StamP)

(
\ A^\#
Name'-ryaqaygth
-'\*-*--*-tll ,""',tttOHO AZHARI BIN MOHD SAPIE

NRIC No. :830916-A7-5777

P. eng. No. :1 521 8

Date : lo. o€. 2cr t3


GPI Unit Siasatan Tanah, Cawangan Kejuruteraan Jalan dan Geotekhik, lbu Pejabat JKR Mataysia

ROLES AND RESPONS|BtLtTtES OF A PROFESSIONAL ENGINEER (SITE INVESTIGATION)

project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT0061041/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN MOHD SAPIE
tc 830916-07-5727

PE No. 15218

Experience in Supervision on Site Investigation : 1-5yrs z !.


: 6-10yrs :
: 10yrst :

NO ROLES AND RESPONSIBILITIES

Ptan, anatyze and check Scope of works and proceses in order to make sure
1
the project witt be finished on time.

2 Inspection of the works onsite to compty att specifications required.

3 Ensure safety measures compliances for workers and pubtic.

Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.

Ensure proper site supervision, data togging and sampte handting in order to
5 gain quatitY resutts.

Ensure atl samptes taken are delivered to quatified laboratory and the
6
taboratory schedute is been prepared by designer.

Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG, JKR.

*please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
PROJECT TEAM DETAILS

Manager

No. Position Name lc


1 Manager Lukhman Hakim Bin Ahmad 831103-02-5401

Profesional Engineer & Supervisor

No. Position Name tc


1 P. Eneineer Mohd Azhari Bin Mohd Sapie 830916-07-5727
2 Supervisor
3 Supervisor

Team Member On-Site

Team 1

No. Position Name tc


1 Suoervisor Lukhman Hakim Bin Ahmad 831103-02-5401
2 Operator Mohamad Noor Bin Awang 770221-02-5887
3 Worker Zurimi Bin Ati 770610-09-5061
4 Worker Norazam Bin Lat 771103-02-5813
5 Worker

Team 2 (lf any)

No. Position Name tc


1 Supervisor
2 Operator
3 Worker
4 Worker
5 Worker

Geologist

No. Position Name tc


1 Geoloeist

Laboratory

No. Position Name ft Address tc


1 Z-DSAC Laboratories Md. Ghazazi Bin Mat Zin 590425-08-6469
12, Jatan Kesuma 7115, Bandar
Tasik Kesuma, 43700 Beranang,
Setangor Darul Ehsan.
9o
- Cl)

9E
B6
E

E E
sN |'r)
.o
N s'! <i
E o NE
=trl
Eo.
9 CDY
N*
I
l xs
o u &t3
|,\ y o.x
q)
o )
v 'l
J
;t g x>_ o
c
o) +q F
c 'x .U'
x
(, .3
LU UJ

z X
tll
F
tn cd
E
$l
E
lr)
o \o
ET
l- F
e sH
o oo X'rl x
o
J
.=
E o
Nd
Io. (*
Fr
mv
o X-t ;i co ;.< =y
IrJ
II
o
o o
o
aig
T'CI
y 9u
ta a)
II U
o o-
x> o X>- O
c
c
:F Fo
q
'x
t, x
trt LU

vl
f oo
tn Eg
.9 s, .f N
EE
=o
AE
o
u

*O.,
s6
U>
$gp
cF:.o
=c Eilg-
sY ,o F nri5
o. x F-
€F;s
C-:.
'?d-
NO)
'i- :
AI V F:
^i +-
.-ioo
o 6a
a CD€
g3 .t5
LL

'.E

v, c\
o T
co
I
6

zo N
SUMMARY OF LABORATORY TESTING

No Type of Tesl Numbet of Somple

I Moisture Content
e
z Liquid Limit
J Plostic Limif
4 Plosticity Index 3
5 Specific Grovity
6 Porticle Sizo Distribution- Coorse 5
1 Porficle Sizo Distribution- Fine
8 Bulk Density
I Unconfined Compression Strength 6
(Rock)
10 Point Loqd Index 4
{

lbu Pejabat JKR Mataysia


unit siasatan Tanah, cawangan Kejuruteraan Jatan dan Geoteknik,

PLANT, EQUIPMENT AND MATERIAL RECORDS


Bagi Projek cadangan Menggantikan Jambatan
Project : Kerja-kerja Penyiasatan Tanah Dan ujian Makmat
Pinang'
Sedia Ada Di Jambatan FT006/041 /93 Barat Daya' Putau
Location : Barat DaYa, Putau Pinang
Date :12.03.2013

TEAM : Lukhman Hakim Bin Ahmad

Unit Remarks
No Ty!e
1
(nindle Marhine 1

2 Top Drive Macnlne


3 Water PumP z
4 Casinss (NW)-1.5m 1

Casinqs (NW)-3m 12
5
7
6 Rods (BW)-1.5m
Rods (BW)-3m 20
7
1
8 Sptit Spoon SamPter
9 UD SamPter
10 Mackintosh Probe(-m)
11 Hand Auger(-M)
12 PVC Pipe
13 Cement (borehote marker)
14 Sand (borehote [4I!9I)

Name : t-ukt/ffiff-akim Bin Ahmad

Date : L2.03.2073
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotekhik, lbu Pejabat JKR Mataysia

DAILY SITE DIARY WeatherCondition

Project : Kerja-kerja
Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Putau Pinang.

Location : Barat Daya, Putau Pinang

Date :12.03.2013 HeEe/ REi n

Rsin ShosPr
From :1300 hrs to :1600 GFsd C$nditiOn

TEAM : LUKHMAN HAKII\A BIN AHi AD


MANPOWER

Lukhman Hakim Bin Ahmad


lsmai[ abu bakar
Mohd Noor
Mohd Norazam
Zurimi

QUALITY
Test (BH/MP/ Work Done For The Day Inspection Result/Description
(SPT N-value, Type of soil, casing(m) rod(m),etc

Boulders (granite), CRR=25/300

d#qi
Name :Luklrrdifr-Hakim Bin Ahmad

: 12.03.
Date :72.03.2O73
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jalan dan Geotelinik, lbu Pejabat JKR Mataysia

ROLES AND RESPONSTBTLITTES OF A PROFESSIONAL ENGTNEER (S|TE tNVEST|GAT|ON)

Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FTOO6{A41/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN &TOHD SAPIE
tc 830916-07-5727

PE No. 15218

Experience in Supervision on Site Investigation i 1- yrs z l-


5

: 6-10yrs :
z 10yrs t :

NO ROLES AND RESPONSIBILITIES

Ptan, anatyze and check scope of works and proceses in order to make sure
1
the project witt be finished on time.

2 Inspection of the works onsite to compty atl specifications required.

3 Ensure safety measures comptiances for workers and public.

Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.

Ensure proper site supervision, data togging and sample handting in order to
5
gain quality resutts.

6
Ensure atl samptes taken are delivered to quatified taboratory and the
taboratory schedule is been prepared by designer.

Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG. JKR.

*Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
l8l Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotelinik, lbu Pejabat JKR Mataysia

DAILY SITE DIARY Weather Condition

Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Pulau Pinang.

Location : Barat Daya, Putau Pinang

Date :13.03.2013 !i! HElvy Rlia

Rain ShD!.r€r

From :1 130 hrs to :1730 hrs Gr]tri CNndithlq

TEAM : LUKH,UAN HAKIM BIN AHMAD


MANPOWER
No Trade Name
I Supervisor Lukhman Hakim Bin Ahmad
2 Worker lsmait abu bakar
3 Worker Mohd Noor
4 Worker Mohd Norazam
5 Worker Zurimi

WORK PROGRESS AND QUALITY


Test (BH/MP/ Work Done For The Day Inspection Result/Descri ption
HA/VS/etc) From m to m (SPT N-value, Type of soil, casing(m) rod(m),etc

BH1 2.10 Coring works start at level 2.1m to 3.3m,


to Boulders (granite), CR=1.2, CRR=1.0m
3.30

frr"t&F'Q$fi;',

PreparedrrTrM
$z:-;: ''

Name
Y
:Lt!6mao Hakim Name
r\ BintV#SBpie
Bin Ahmad
\"no\'' r,'
Date :13.03.2013
Date ' th*..trN*--{-
Unit Siasatan Tanah, Cawangan Kejuruteraan Jalan dan Geoteknik, lbu Pejabat JKR Mataysia

PLANT, EQUIPMENT AND MATERIAL RECORDS


Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan Jambatan
Sedia Ada Di Jambatan Fl0O6/041/93 Barat Dava. Putau Pinans.
Location : Barat Daya, Pulau Pinang
Date : 13.03.2013

TEAr\ : Lukhman Hakim Bin Ahmad

No Type Unit Remarks


1 Spindte Machine 1

2 Top Drive Machine


3 Water Pump 2
4 Casinqs (NW)-1.5m 1

5 Casines (NW)-3m 12
6 Rods (BW)-1.5m 2
7 Rods (BW)-3m 20
8 Sptit Spoon Sampter 1

9 UD Sampte
10 Mackintosh Probe( m)
11 Hand Auqer( M)
12 PVC Pipe
13 Cement (borehote marker)
14 Sand (borehole marker)

PR0,rg;
"^{tRh
Sffi.%
,-4'.-!.{'*!.4

:i l:lh i.r','j':i$ $Ap!E

Name :LvKman Hakim Bin Ahmad

Date :13.03.2O13
l$l Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotelinik, lbu Pejabat JKR Mataysia

ROLES AND RESPONS|BtLtTtES OF A PROFESSTONAL ENGTNEER (S|TE TNVESTIGATTON)

Project : Kerja'kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FIO06{041/93 Barat Daya,
Pulau Pinang.
PE Name : MOHD AZHARI BIN MOHD SAPIE
lC : 830916-07-5727
PE No. :15218
Experience in Supervision on Site Investigation : 1- yrs z I
5

: 6-10yrs :
: 10yrst :
NO ROLES AND RESPONSIBILITIES

Ptan, analyze and check scope of works and proceses in order to make sure
1
the project witt be finished on time.

2 lnspection of the works onsite to compty atl specifications required.

3 Ensure safety measures comptiances for workers and public.

Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.

Ensure proper site supervision, data logging and sampte handting in order to
5
gain quality results.

6
Ensure alt samples taken are delivered to quatified laboratory and the
laboratory schedute is been prepared by designer.

Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG, JKR.

*Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
I

Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteknik, lbu Pejabat JKR Mataysia

PLANT, EQUIPMENT AND MATERIAL RECORDS


Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan Jambatan
Sedia Ada Di Jambatan FTO06/041/93 Barat Daya, Putau Pinang.
Location : Barat Daya, Putau Pinang
Date :14.03.2013

TEAM : Lukhman Hakim Bin Ahmad

No Tvpe Unit Remarks


1 Spindte Machine 1

2 Top Drive Machine


3 Water Pump 7
4 Casines (NW)-1.5m 1

5 Casinqs (NW)-3m 12
6 Rods (BW)-1.5m 2
7 Rods (BW)-3m z0
8 Sptit Sooon Samoler 1

9 UD Sampter
10 Mackintosh Probe(_m)
11 Hand Aueer( M)
17 PVC Pipe
13 Cement (borehote marker)
14 Sand (borehote marker)

Name : Luklz6-i'iTfiakim Bin Ahmad

Date :14.03.2013
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotelinik, lbu Pejabat JKR Mataysia

DAILY SITE DIARY Weather Condition

Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Putau Pinang.

Location : Barat Daya, Pulau Pinang E

Date :14.03.2013 Hesw R€in

Rrin ShrqEr
From :0900 hrs to :1830 hrs Gssd Csilditiiln

TEA,I : LUKH^{AN HAKIM BIN AHMAD


,t4ANPOIVER
No Trade Name
II Supervisor Lukhman Hakim Bin Ahmad
2 Worker lsmail abu bakar
3 Worker Mohd Noor
4 Worker Mohd Norazam
5 Worker Zurimi

WORK PROGRESS AND QUALITY


Test (BH/MP/ Work Done For The Day Inspection Result/Description
HA/VS/etc) From m to m (SPT N-value, Type of soil, casing(m) rod(m),etc

BH1 2.10 Start boring in rock using NW casing with iron bit from
to level 2.1m to 3.3m.
3.30

4.ZO Coring works start at 4.2m to 5.7m.Sample taken.


to CR=1.5m, CRR=I.25m
5.70 Hard, white solid granite with fractured rock

5.70 Continue coring from 5.7m to 7.2m


to CR=1.5m, CRR=1.4m
7.20 Hard, white solid granite

ffi
Prepared By,

Name
74*
:Lukhmaf Hakim Bin Ahmad
checkedBy, f
ffii
"/ CgVi;- \{"

Sapie
\

Date :14.03.2013

"km"
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotelinik, lbu Pejabat JKR Mataysia

ROLES AND RESPONSIBILITIES OF A PROFESSTONAL ENGTNEER (SITE tNVEST|GAT|ON)

Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FTOO6{O41/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN MOHD SAPIE
rc 830916-07-5727

PE No. 15218

Experience in Supervision on Site Investigation z 1- yrs : !


5

: 6-10yrs :
: 10yrs + :

NO ROLES AND RESPONSIBILITIES

Ptan, anatyze and check scope of works and proceses in order to make sure
1
the project witt be finished on time.

2 lnspection of the works onsite to compty a[[ specifications required.

3 Ensure safety measures compliances for workers and public.

Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.

Ensure proper site supervision, data togging and sampte handting in order to
5
gain quality results.

6
Ensure a[[ samptes taken are delivered to quatified laboratory and the
laboratory schedule is been prepared by designer.

Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG. JKR.

*Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
{

Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteknik, lbu Pejabat JKR Mal.aysia

PLANT, EQUIPMENT AND MATERIAL RECORDS


Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan Jambatan
Sedia Ada Di Jambatan FT006lM1l93 Barat Daya, Putau Pinang.
Location : Barat Daya, Putau Pinang
Date : 15.03.2013

TEAM : Lukhman Hakim Bin Ahmad

No Tvpe Unit Remarks


1 Soindte Machine 1

2 Top Drive Machine


3 Water Pump 2
4 Casinqs (NW)-1.5m 1

5 Casines (NW)-3m 12
6 Rods (BW)-1.5m 2
7 Rods (BW)-3m 70
8 Solit Sooon Samoter 1

9 UD Sampter
10 Mackintosh Probe(_m)
11 Hand Auser( M)
12 PVC Pipe
13 Cement (borehote marker)
14 Sand (borehole marker)

5l:*tumrr"';x
Prepared By
g1l: ?.qo*o SAPIE

Name : [utr6.uan'Hakim Bin Ahmad

Date : 15.03.2013 Date :1s.03.2&s ,fiifftt?'


Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteinik, lbu Pejabat JKR Mataysia
@
DAILY SITE DIARY Weather Condition
L?

Project : Kerja-kerjaPenyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Putau Pinang.

Location : Barat Daya, Pulau Pinang 5

Date :15.03.2013 ';


HEsvt F!; n

Rrin ShrI.Jer
From :0900 hrs to :1200 hrs Gtlrrd ff,nditirln

TEAIvT : LUKHMAN HAKIM BIN AHMAD

MANPOWER

Lukhman Hakim Bin Ahmad


lsmail abu bakar
Mohd Noor
Mohd Norazam
Zurimi

Test (BH/MP/ Work Done For The Day I nspection Resu lt/Description
From _m to _m (SPT N-value, Type of soil, casing(m) rod(m

Continue coring work from 7.2m to 8.7m


CR=1.5m, CRR=1.41m
Hard, white solid granite

Checked 8y,

Name :Lukhman Hakim Bin Ahmad Name :naohd nzhati ein rvrLaisairie ,!'"

Date :15.03.2013
Date : 15.03.2013 ^.,. , _. ,..
I---'^r*.l Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geote*nik, lbu Pejabat JKR Mataysia
l*- |

ROLES AND RESPONSIBtLtTtES OF A PROFESSIONAL ENGTNEER (SITE TNVESTTGAT|ON)

Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FTOO6{O41/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN MOHD SAPIE
rc 830916-07-5727

PE No. 15218

Experience in Supervision on Site Investigation : 1 - 5 yrs : L

: 6-10yrs :

: 10yrs i :

NO ROLES AND RESPONSIBILITIES

Ptan, anatyze and check scope of works and proceses in order to make sure
1
the project witt be finished on time.

2 Inspection of the works onsite to compty a[[ specifications required.

3 Ensure safety measures comptiances for workers and public.

Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.

Ensure proper site supervision, data logging and sample handting in order to
5
gain quatity results.

6
Ensure atl samples taken are detivered to quatified laboratory and the
laboratory schedule is been prepared by designer.

Check, verify and endorsed the finat report prior submitting to the Unit Sl,
7
CKJG, JKR.

*Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
{

Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteknik, lbu Pejabat JKR Mataysia

PLANT, EQUIPMENT AND MATERIAL RECORDS


Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan Jambatan
Sedia Ada Di Jambatan FT006/U1/93 Barat Daya, Pulau Pinang.
Location : Barat Daya, Putau Pinang
Date : 16.03.2013

TEAM : Lukhman Hakim Bin Ahmad

No Type Unit Remarks


1 Spindte Machine 1

2 Top Drive Machine


3 Water Pump z
4 Casinqs (NW)-1.5m 1

5 Casines (NW)-3m 12
6 Rods (BW)-1.5m 2
7 Rods (BW)-3m 20
8 Sptit Spoon Sampter 1

9 UD Sampter-
10 Mackintosh Probe( m)
11 Hand Auser( M)
12 PVC Pioe
13 Cement (borehote marker)
14 Sand (borehote marker)

finenor$,.
,"ff\:{/fi

Name : LukKma-ifHakim Bin Ahmad

Date : 16.03.2013
g Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geotekhik, lbu Pejabat JKR Mataysia

DAILY SITE DIARY WEatherC0ndition


12

Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makmat Bagi Projek Cadangan Menggantikan
Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya, Putau Pinang.

Location : Barat Daya, Putau Pinang

Date :16.03.2013 riririr! HeEvy Rli n

Rein Shower
From :0900 hrs to :12ffi hrs Gold ConditiBn

TEAM : LUKHftlAN HAKIM BIN AHIiAD


MANPOWER
No Trade Name
1 Supervisor Lukhman Hakim Bin Ahmad
2 Worker lsmail abu bakar
3 Worker Mohd Noor
4 Worker Mohd Norazam
5 Worker Zurimi

WORK PROGRESS AND QUALITY


Test (BH/MP/ Work Done For The Day Inspection Result/Description
HA/VS/etc) From _m to _m (SPT N-vatue, Type of soil, casing(m) rod(m),etc
0.00 Top soil with vegetation root
BH2 to
0.50
Coring works start at 1.5m to 1.7m.Sample taken.
1.50
CR=200mm, CRR=20mm
to
Boulders
1.70
Very dense, brownish, fine to coarse sand filled with some
3.00 gravel.
to
SPT N=5,6, 10, 1 3, 12,7,42
3.45
R./r=7Ol45O

3.60
Termination of drilling in rock at level 4,6m.
to
Boring in rock using NW casing.
4.60
CR=1000mm, CRR=650mm

4.60
Boring in soil.
to
4.80
Boring in rock.

ffia
4.80
Sample taken.
to
CR=1000mm
s.80
CRR=950mm

u--;/ *7-
Name Lukhman Hakim Bin Ahmad Name ,*[IIG"'qBj?g"
Date :16.03.2013
Date ,ro.o\zors L---"t
ri_
-- .--'
fm Unit Siasatan Tanah, Cawangan Kejuruteraan Jatan dan Geoteknik, lbu Pejabat JKR Mataysia

ROLES AND RESPONS|BTLTTTES OF A PROFESSTONAL ENGTNEER (S|TE TNVESTtcATtON)

Project : Kerja-kerja Penyiasatan Tanah Dan Ujian Makma[ Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FTOO6{041/93 Barat Daya,
Pulau Pinang.
PE Name MOHD AZHARI BIN MOHD SAPIE
tc 830916-47-5727

PE No. 15218

Experience in Supervision on Site lnvestigation i 1- yrs i


5 I
: 6-10yrs :
: 10yrst :
NO ROLES AND RESPONSIBILITIES

Plan, analyze and check scope of works and proceses in order to make sure
I
the project witt be finished on time.

2 Inspection of the works onsite to compty att specifications required.

3 Ensure safety measures compliances for workers and pubtic.

Supervise the project from start to finish and to propose any necessary
4
changes encountered by referring to Unit Sl, CKJG, JKR.

Ensure proper site supervision, data logging and sampte handting in order to
5
gain quality resutts.

Ensure att samples taken are detivered to quatified laboratory and the
6
laboratory schedute is been prepared by designer.

Check, verify and endorsed the final report prior submitting to the Unit Sl,
7
CKJG, JKR.

"Please refer to Terma Rujukan & Kehendak Pelanggan ltem 4.0 for compliance of PE responsibilities.
ID Task Name Duration Start Finish % Complete
March Aoril Mav
6 2t24 3t3 3t1O 317 3!24 3t314!7 4t14 4t21 4t28 5t5 st12
1 SOIL INVESTIGATION WORKS FOR GADANGAN MENGGANTIKAN 47 days Mon 3/11113 Mon 5/6/13 1OO%
JAMBATAN SEDIA ADA DI JAMBATAN FT136/I79/15 KULIM KEDAH &
JAMBATAN FTOO6/041/93 BARAT DAYA PULAU PINANG

SOIL INVESTIGATION WORK 47 days Mon 3/11/13 Mon 5/6/13 't00%


3 Start Work 47 days Mon 3/1 1/13 Mon 5/6i13 100o/o

4 Field Work & Laboratory Test 4/-days Mon 3/11/13 Wed 5/1113 100%
5 JAMBATAN FTOO6/041/93 43 days Mon 3/11/{3 Tue 4130t13 100o/o

o Mobilisation 2 days Mon 3/11/13 Tue 3112113 100%


7 Deep Boring 5 days Wed 3/13/13 Sun 3l{7/13 100%
o BH1 3 days Wed 3/13/1 3 Fri 3/1 5/1 3 100%
v BH2 3 days Fri3l15l13 Sun 3117113 100%
10 Demobilisation 1 day Mon 3/18/13 Mon 3/1 8/1 3 100o/o

11 Laboratory Test 35 days Tue 3/19/13 f ue 4130113 140%


12 End work 1 day Tue 4/30/13 f ue 4l3ol13 1A0o/o

13 JAMBATAN FT136/I79115 37 days Mon 3/18/13 Wed 5/'ll13 100o/o

14 Mobilisation 2 days Mon 3/18/13 Tue 3/1 9i 1 3 lOOo/o

15 Deep Boring 12 days Wed 3/20/13 Sun 3/31/{3 100%


to BH1 3 days Wed 3/20/13 Fti 3122113 100%
17 BH2 3 days Fti3l22l13 Sun 3124113 100o/o

18 BH3 7 days Mon 3/25113 Sun 3/31i 1 3 100%


19 Demobilisation 1 day Mon 411113 Mon 4/1/13 1000/0

io Laboratory Test 22days fue4l2l13 Wed 5/1i13 100o/o

21 End work 1 day Wed 5i1l13 Wed 5/1/13 100%


4Z Final Report 4 days Wed 5/1/13 Mon 5/6/13 100o/o

23 Draft Final Report and Amendment Comment From Client 3 days Wed 5/1/13 Fri 5/3i13 100%
24 Submission of final Report 2 days Fri 5/3/13 Mon 5/6i 13 100o/o

zs End 1 day Mon 5/6/13 Mon 5/6i 13 100%

PTqect: CADANGAN MENGGANTI KAN


Task f----.-*l Milestone a External Tasks

JAMBATAN SEDIA ADA Split summary lF External Milestone ;$,


Date: Wed 3/6/13
Progress ProjectSummary qffireSd$ffiSee'ry Deadline

Page 1
DEEP ROCKS SDN. BHD. 2013

TABLE OF CONTENTS

1. INTRODUCTION…….…………………………………………………………….…..1

2. SCOPE OF WORKS…..………………………………………………………………..1

3. FIELD…….……………………………………………………………………………..2
i. Boring….………………………………………………………………………………2
ii. Standard Penetration Test…...…………………………………………………………2

4. LABORATORY TEST …………….…………………………..……………………….3

APPENDIX

Appendix A – Boring Logs……………………………………………………………………


Appendix B – Laboratory Results…………………………………………………………….
Appendix C – Fhoto…………………………………………………………………………..
DEEP ROCKS SDN. BHD. 2013

1. INTRODUCTION

The report presented is on the soil investigation carried out Kerja-kerja Penyiasatan Tanah
Dan Ujian Makmal Bagi Projek Cadangan Menggantikan Jambatan Sedia Ada Di
Jambatan FT006/041/93 Barat Daya, Pulau Pinang. The client is Jabatan Kerja Raya
Malaysia.

Deep Rocks Sdn. Bhd. was awarded the contract to carry out the soil investigation work for
the proposed project. Originally two (2) numbers of deep boreholes was carried out to obtain
the geotechnical information of the above site.

2. SCOPE OF WORKS

i. Explored the subsoil condition at the proposed site by two (2) exploration boreholes.
ii. Carried out Standard Penetration Test.
iii. Obtain disturbed and undisturbed samples.

1
DEEP ROCKS SDN. BHD. 2013

3. FIELD EXPLORATION

a) BORING

Field exploration was carried out using multi-speed rotary boring machine and tripod.
These boreholes were drilled by local trained drillers under direct supervision of our
technicians according to instructions and specifications given.

The boreholes were lined with NW casings of 75 mm. Outer diameter to prevent the
collapse of the boreholes wall. These boreholes were washed by circulating water and
disturbed samples were collected for visual examination.

b) STANDARD PENETRATION TEST

The Standard Penetration Test (SPT) was carried out at 1.5 m interval. Basically, the
test was conducted by dropping a self - tripping hammer of 63.5 kg from a fixed
height of 75 cm. The numbers of blow for the initial 15 cm was recorded as the
seating drive.

The N value is the number of blows to penetrate the subsequent 45 cm. Nevertheless,
if the number of blows ever reached 50, the test was terminated and the corresponding
penetration recorded. Each sample obtained from the sampler in the field was
examined and classified by our technicians.

Representation portions of each sample were sealed in polythene bags and labeled
indicating and depth taken and send to our laboratory. Standard Penetration Test
results were shown in the boring logs as shown in APPENDIX A.

2
DEEP ROCKS SDN. BHD. 2013

4. LABORATORY TEST

The following laboratory tests were carried out in accordance with the procedure in BS.
1377 Part 2: 1990 and BS. 1377 Part 3: 1990 on selected samples of various penetrations
(APPENDIX B).

Classification tests
i. Natural Moisture Content
ii. Bulk Density / Dry Density
iii. Atterberg Limit
iv. Specific Gravity
v. Linear Srinkage
vi. Particle Size Distribution for coarse-grained soils
vii. Particle Size Distribution for fine-grained soil
viii. Unconfined Compression Strength
ix. Point Load Index

3
DEEP ROCKS SDN. BHD. 2013

APPENDIX A
(BORING LOG)
DEEP ROCKS SDN BHD BORELOG BOREHOLE NO : BH 1
SHEET NO : 1 OF 1

Project : KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK CADANGAN MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN FT 006/041/93 BARAT
DAYA, PULAU PINANG.

Client : JKR MALAYSIA Consultant :


Location : BARAT DAYA, PULAU PINANG. Coordinate : N -13551.201, E -1949.345 Features :
Reduced Level (m) : 137.212 Logged By : LUKHMAN Starting Date : 12/03/2013
Type of Drill : YBM2WS Drilled By: ZURIMI Finishing Date : 15/03/2013

Sample & Test


Drilling Method

Classification
(Casing Size)

Recovery (%)
Graphic Log
British Soil

Type & No
SPT Test Results Rock

Depth(m)
Vane Shear

Legend
Scale

Soil Description SPT Details Remarks

Remoulded
Undisturb

CRR (%)

RQD (%)
Blow (Seating & Test)

CR (%)
/cm 75m 75m 75 75m 75 75m
m m mm m mm m

0 10 20 30 40 50
Pavement material D1 0.00 0

0.5

1
1

1.5
Hard, white with black spot Granite C1 1.50 - 300mm 35mm NIL
1.80
2
2

Hard, white with black spot Granite C2 2.10 - 1200mm 1000mm 45mm
3.30
2.5

3
3

3.5

4 4

4.5
Depth (m)

5 Strong, white solid Granite with little 4.20 - 5

C3
fractured rock 5.70 1500mm 1250mm 85.6mm

5.5

6 6

5.70 - 6.5

Strong, white solid Granite C4 1500mm 1400mm 100mm


7.20

7 7

7.5

8 7.20 -
8

Strong, white solid Granite C5 1500mm 1410mm 100mm


8.70
8.5

9
9
Ground Water Level (Measured from Ground Level)
END OF BH 1 AT DEPTH : 8.70 M
DATE : 15.03.2013 Date Time Borehole Casing Water
WATER LEVEL : 3.2 M (dd/mm/yyyy) (hh : mm) Depth (m) Depth (m) Level (m)
9.5

16.03.2013 10.00 a.m 8.70 3.60


17.03.2013 10.00 a.m 8.70 2.90

10
10
18.03.2013 10.00 a.m 8.70 3.20.

REMARKS :

LEGEND :

Pressuremeter Test (PMT) Standard Penetration Test (P) Attemped (UD),(OD),(PS), (MZ) & (DS)

Vane Shear Test (V) Undisturbed Samples (UD) Piston Sample (PS)
Open Drive Thickwall Sample (OD)
Permeabillty Test (PBT)
Mazier Sample (MZ) Cone Run
Packer Test (PKT) DenisonSample (DS)
Note : m.b.g.l - meter below ground level
DEEP ROCKS SDN BHD BORELOG BOREHOLE NO : BH 2
SHEET NO : 1 OF 2

Project : KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK CADANGAN MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN FT 006/041/93 BARAT
DAYA, PULAU PINANG.

Client : JKR MALAYSIA Consultant :


Location : BARAT DAYA, PULAU PINANG. Coordinate : N -1987.384, E -13559.005 Features :
Reduced Level (m) : 136.365 Logged By : LUKHMAN Starting Date : 16/03/2013
Type of Drill : YBM2WS Drilled By: ZURIMI Finishing Date : 17/03/2013

Sample & Test


Drilling Method

Classification
(Casing Size)

Recovery (%)
Graphic Log

British Soil

Type & No
SPT Test Results Rock

Depth(m)
Vane Shear

Legend
Scale

Soil Description SPT Details Remarks

Remoulded
Undisturb

CRR (%)

RQD (%)
Blow/ (Seating & Test)

CR (%)
cm 75m 75m 75 75m 75 75m
m m mm m mm m

Top soil with vegetation root D1 0.00 0


0 10 20 30 40 50

0.5

1
1

Hard, white with black spot Granite C1 1.50 - 1.5


200mm 30mm NIL
1.70
2
Very dense, brownish silty fine to coarse sand 2

with little CLAY traces of gravels

2.5

3
P1 3.00 - 15.5 3 42/30 5 6 10 13 12 7
D2 3.45

3.5

4 3.60 -
Hard, white Granite with fractured rock C2 1000mm 650mm 83.10
4.60 4

4.5

5
Depth (m)

4.80 -
Very strong, white solid Granite C3 1000mm 950mm 100
5.80
5.5

.....
6
.... .
.... P2 6.00 - 88.9 6
50/30 8 12 10 10 14 16
Very dense, brownish silty fine to coarse SAND .....
D3 6.45
with very little Clay and some gravels .....
.....
6.70 - 6.5

Strong, white with black spot Granite C4 7.00 300mm 240mm 100
7
Very dense, yellownish to grey silty fine to 7

coarse sand with very little CLAY and some


gravels
P3 7.50 - 40 7.5
50/12.5 20 20 30 20
D4 7.95

8 8 50mm
Moderately strong, white solid Granite C5 8.00 - 1000mm 870mm 100
9.00
8.5

9 9

Very dense, yellownish silty fine to coarse sand P4 9.00 - 50 50/15 8 8 26 24


with little Clay some gravels D5 9.30
9.5

Moderately strong, white solid Granite C6 9.40 - 1050mm 1050mm 100


10.50 10
10

REMARKS :

LEGEND :

Pressuremeter Test (PMT) Standard Penetration Test (P) Attemped (UD),(OD),(PS), (MZ) & (DS)

Vane Shear Test (V) Undisturbed Samples (UD) Piston Sample (PS)
Open Drive Thickwall Sample (OD)
Permeabillty Test (PBT)
Mazier Sample (MZ) Cone Run
Packer Test (PKT) DenisonSample (DS)
Note : m.b.g.l - meter below ground level
DEEP ROCKS SDN BHD BORELOG BOREHOLE NO : BH 2
SHEET NO : 2 OF 2

Project : KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK CADANGAN MENGGANTIKAN JAMBATAN SEDIA ADA DI JAMBATAN FT 006/041/93 BARAT DAYA,
PULAU PINANG.

Client : JKR MALAYSIA Consultant :


Location : BARAT DAYA, PULAU PINANG. Coordinate : N -1987.384, E -13559.005 Features :
Reduced Level (m) : 136.365 Logged By : LUKHMAN Starting Date : 16/03/2013
Type of Drill : YBM2WS Drilled By: ZURIMI Finishing Date : 17/03/2013

Sample & Test


Drilling Method

Classification
(Casing Size)

Recovery (%)
Graphic Log
British Soil

Type & No
SPT Test Results Rock

Depth(m)
Vane Shear

Legend
Scale

Soil Description SPT Details Remarks

Remoulded
Undisturb

CRR (%)

RQD (%)
Blow/ (Seating & Test)

CR (%)
cm 75m 75m 75 75m 75 75m
m m mm m mm m

Moderately strong, white solid Granite 0 10 20 30 40 50


10

Very dense, yellownish gravels silty fine to coarse . . . . . P5 10.50 - 17.4 50/8 20 20 40 10
. . . . .
SAND with very little Clay and some gravels D6 10.73 10.5
. . . . .
. . . . .
11 . . . . .
5mm
.....
..... 11

Depth (m)
.....
.....
.........
. ... .
12 . ... . 11.5

. ... .
Very dense, yellownish silty fine to coarse SAND . ... . P6 12.00 - 54.23 50/14.5 20 15 25 25
. ... .
with some gravels .. D7 12.295
12
END OF BH 2 AT DEPTH : 12.295 M
5mm
DATE : 17.03.2013
13 WATER LEVEL : 1.70 M

14

15

16

17

18

19
Ground Water Level (Measured from Ground Level)
Date Time Borehole Casing Water
(dd/mm/yyyy) (hh : mm) Depth (m) Depth (m) Level (m)
18.03.2013 10.15 a.m 12.295 1.70
19.03.2013 10.00 a.m 12.295 1.80

20 20.03.2013 10.00 a.m 12.295 1.90

REMARKS :

LEGEND :

Pressuremeter Test (PMT) Standard Penetration Test (P) Attemped (UD),(OD),(PS), (MZ) & (DS)

Vane Shear Test (V) Undisturbed Samples (UD) Piston Sample (PS)
Open Drive Thickwall Sample (OD)
Permeabillty Test (PBT)
Mazier Sample (MZ) Cone Run
Packer Test (PKT) DenisonSample (DS)
Note : m.b.g.l - meter below ground level
DEEP ROCKS SDN. BHD. 2013

APPENDIX B
(LABORATORY TEST)
Z-DSAC LAB ORATORIE,S (00r144285-D)

CIDB MALAYSIA No. 1 991 1 02-SL0541 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

Our Ref,: 20404113 Date : April 12,2013


TEST REPORT
( This report is issued subject to the conditions set out overleaf )
The copyright of the confidential TEST REPoRT is owned by Z-DSAC LABORATORIES.
This TEST REPORT cannot be reproduced or published in any form whatsoever or the
information contained herein be used in any from of publication or advertisment without
the written permission of Z-DSAC LABORATORIES.

1. Client JABATAN KERJA RAYA MALAYSIA

2. Contractor DEEP ROCKS SDN. BHD.


No.'145, Tingkat Bawah, Kompleks Alor Setar,
Lebuhraya Darul Aman,
05100 Alor Setar, Kedah Darul Aman.

Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FI 006/041/93 Barat Daya, Pulau Pinang.

4. Test Requested Determination of the :-


By Client Classification Tests. (BS 1377 '. Pan 2 : 1990)
1) Natural Moisture Content (Test 1)
2) Bulk Density / Dry Density
3) Specific Gravity (Test 6)
4) Linear Shrinkage (Test 5)
5) Atterberg Limit (Test 2,3 & 4)
6) Particle Size Distribution for Coarse-Grained Soils (Test 7A and 78)
7) Particle Size Distribution for Fine-Grained Soils (Test 7C and 7D)
8) Unconfined Compression Strength
9) Point Load Index

Type Of Meterial Soil& Rock

Method of Testing BS'1377:Part2:1990


ASTM D2938 - 1986
rsRM 1985

t. Date Tested : 06.04.2013 - 12.04.2013


8. Results : Please refers to the following page for the results.

Professional Engineer : lr. Kent Chow B.E. (Hons.) P. Eng. lvllEtvl.


Ali. B.Eng. (West. Aust.) p. Eng. MIEM.
Professional Engineer : lr. Azhar Bin [4d.
Technical Manager : Haji Mohd Nawahidudin Mahamad tsa. M. Sc. Building B.Sc. Buitding (U.K)

Head Office : 12, Jalan Kesuma Ttl\,Bandarlasik Kesuma,43700 Beranang, Selangor Darul Ehsan. Tel i Fax :603-87247103
Laboratory : 5, Jalan Bukit Mewah 25, Taman Bukit Mewah,43000 Kajang, Selangor Darul Ehsan. Tel / Fax :603-87344267
c:o t-
o $
$
(o
o @
N
o6P ri d (o d
o
c)
-o
.!

tr EFt^ (oq c\s o


t- o)
o)
ro
@
ro
oq
t- ri $ C9 scf)
f.. @ f.- cf)
EFFE
!>s F.- N CO @ o
.9
zoo fis (o (o o) cf) (o

o
(0
.!u
U)
Fs
@
rf)
N
|r)
$
lo s CO
.{-

o
g;< o, |'o
cf)
s
cf)
cf)
cr)

U'E
Fg
-E
ds (o \f F-.
I Ct)
E
_C
f gP E
:
A ;E Y
ds v o- n
sN s
rrJ
u' 3'- c)
q)
N z z N

Ee js o
F 8d cf) N cf)
A +(.o
tU:
l-6
5e
n-O gO)
o
r6 (o6
o+ q s (o
>:
'tlr o co
EH
co
c.=
U)
N z z c.i c.i
E
yt-= d Eco
53 .9>
o o
E-F
.. cJ j+ o,
< o>
Pg
(q q (0 q
N N
=*
Etr 6*0 N N N
og
m; 4 ?F sN o
qp d .F:
o) tr)
>oE (o o,

-r'
fa ;fi
Ets
oFE
d>
ro \ \ q oq

L ) >ci #E- v$ o, s o
o3 *sEaF
>; &z E€f .8;',
v6E
\
rO
q s
-
q o,

e
.f;^
E ffcD6€
=a
3*F 6
vF $ s
c,
o.
E

- fi- v5t3_
FsF-
E>:<
(!>-
z
N bx(/)
'*eg
e F::yt"i5 tr) o ra) lo ro o
=
f =F
sft s€3= €e
F- c{
lr)
f
cr) d
a o
; a? ro
o
c?
6O.O
B <
u, F,. F- F* o) N I.JJ
C**
c ooo
zzz
=HgEsR o
o E N F-
o @
o
N
o o
o v O
a<t'i
otr s ro $ CO F- @ ^i N 22u|z
L

o-
6-
N
o s o
U) ro cf) cr) $ ro N
E
gq)d o o n
9,* (l)(t)
.g!uO
F
t-u EZ N
.!2=O
=.91
(JOO- €*
oi I
m
T
co

uortgluourn4sul plall - Ounsal lecruraq3 - 6unse1 aloJcuoC A cnleqdsy'ltog - uotlebtlssnul olls

t8 lt90-ls'20 I 166 I'oN vls^v'lvl,I solc


(c-sezff il oo)
SAruOJ\rUO gVT JYSC-Z
Z-DSAC LAB ORATORIE S (001144285-D)

CIDB MALAYSIA No. 1 991 1 02-SL0541 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

NATURAL MOISTURE CONTENT


BS 1377: Part2:1990

Client JABATAN KERJA RAYA MALAYSIA


Contractor DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada DiJambatan FI006/041/93 Barat Daya, Pulau Pinang,

Lab. Ref, 20404t1s


Date Tested 06.04.2013

Borehole Sample Depth Cont. Wt. of wet Wt. of dry Wt. of Wt, of Wt. of Moisture Average
n0. n0. (m) n0. soil + s6n1. soil + cont. container dry soil moisture content moisture
W2 (gm) W3 (gm) Wl (sm) W3 -W1 W2 -W3 (W2-W3A/V3-W1) content
x100 P/o\
BH1 D2 3.00 M1 54.39 49.50 14.41 4.89 13.94
3.45 t{i2 FE N,I
50.01 14.21 35.80 5,00 IJ.Y/ 14
UJ 6,00 M3 57.11 51.93 IJ.OY 38.24 5,18 13.55
6,45 M4 56.68 5'1.48 13.54 37.94 5.20 tJ,/ | 14
D4 M5 47.90 46.54 12.99 33.55 t.Jo 4.05
M6 48.62 47.21 12.65 34.56 1.41 4.08 4
D5 9,00 M7 69.1 5 59.94 14j2 45.82 9.21 20.10
9.30 M8 69.38 60,01 13.68 40.JJ 9.37 20,22 20
D7 12.00 M9 60.78 60.31 15,07 45.24 0.47 1,04
12.30 M10 60,13 59.63 14.63 45.00 0.50 1.11 1
Z-DSAC LABORATORIES (00114428s.D)

CIDB MALAYSIA No. 1 9911 02-SL0541 81


Site lnvestigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

BULK DENSITY/DRY DENSITY/MOISTURE CONTENT OF SOtL


(BS 1377: Part2:1990)
Client : JABATAN KERJA RAYA MALAYSIA
Contractor I DEEP ROCKS SDN. BHD.
Project : Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/041/93 Barat Daya, Pulau Pinang.

Date Tested : 06.04.2013


Lab. Ref. : 20404113
Borehole /Sample No. BH2. D2 Moisture Content 1 2
Depth (m) 3.00. 3.45 -;0nt. n0. M1 M2
Weight of Sample (sm) 116.21 rVt. of wet soil+cont. W2(gm) 54.39 AA N,I
Diameter (mm) 40 tVt. of dry soil+cont. W3(gm) 49.50 50.01
Initial Length (mm) 53 /Vt. of container W1(gm) 14.41 14.21
Area (m2) 0.001257 rVt. of dry soil W3-W1 35,09 35.80
Volume (cm3) 66.63 fft. of moisture W2-W3 4.89 5.00
Moisture Content (%) 13.95 vloisture content(W2-W3A/V3-W1 )X1 00 13.94 13.97
Bulk Density (Mg/m3) '1,744 Verage moisture content (%) 13,95
Dry Density (Ms/m3) 1.531

Borehole /Sample No. BH2. D3 Moisture Content 1 2


Depth (m) 6.00.6.45 _;ont. n0. M3 M4
Weight of Sample Gm) 194.59 rVt. of wet soil+cont. W2(gm) 57.11 56,68
Diameter (mm) 40 fft. of dry soil+cont. W3(gm) 6,t 0? 51.48
Initial Length (mm) 7Q rut, of container W1(gm) 13.69 13.54
Area (m2) 0.001257 Nt. of dry soil W3-Wl 38.24 37.94
Volume (cm3) 99.31 Nt. of moisture W2-W3 5.18 5.2
Moisture Content (%) 13.63 vloisture content(W2-W3M3-W1 )X1 00 1? q^ 13.71
Bulk Density (Ms/m3) 1,959 \verage moisture content (%) 13 63
Dry Density (Mg/m3) 1.724

Borehole /Sample No. BH2. D4 Moisture Content 1 2


Depth (m) 7.50. 7.95 Cont, no, M5 M6
Weight of Sample Gm) cJ.zz riVt. of wet soil+cont. W2(gm) 47.90 48.62
Diameter (mm) 40 Wt. of dry soil+cont. W3(gm) 46.54 47.21
Initial Length (mm) IJ Wt. of containerWl(gm) 12,99 12,65
Area (m2) 0.001257 Wt. of dry soil W3-W1 33.55 34.56
Volume (cm3) 28.91 fft. of moisture W2-W3 t.Jo 1.41
Moisture Content (%) 4,07 \40isture content(Wz-W3M3-W1 )X1 00 4,05 4,08
Bulk Density (Mg/m3) 1.841 Nerage moisture content (%) 4.07
Dry Density (Mg/m3) 1.769

Borehole /Sample No, BH2. D5 Moisture Content 1 2


Depth (m) 9,00 .9.30 iont. no. M7 M8
Weight of Sample Gm) 1 89.1 3 ilt. of wet soil+cont. W2(gm) 69,15 69.38
Diameter (mm) 40 /Vt. of dry soil+cont. W3(gm) 59.94 60.01
Initial Length (mm) 79 tVt. of container W1(gm)
14.12 13.68
Area (m2) 0,001257 tVt. of dry soil W3-W1 45.82 +O.JJ
Volume (cm3) a0 ?1 fft. of moisture W2-W3 9.21 9.37
Moisture Content (%) 20,16 tiloisture content(Wz-W3M3-W1 )X1 00 20,10 zu.tz
Bulk Density (Mg/m3) 1.904 ryerage moisture content (%) 20.16
Dry Density (Mg/m3) 1.585
Z-DSAC LAB ORATORIE,S (001144285'Lr)

CIDB MALAYSIA No. 1991102-SL054181


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

BULK DENSITY/DRY DENSITY/MOISTURE CONTENT OF SOIL


(BS 1377: Part2:1990)

Client : JABATAN KERJA RAYA MALAYSIA


Contractor : DEEP ROCKS SDN. BHD.
Project : Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Prolek Cadangan
Menggantikan Jambatan Sedia Ada DiJambatan FT 006/041/93 Barat Daya, Pulau Pinang.

Date Tested : 06.04,2013


Lab. Ref. : 20404t13

Borehole /Sample No. BH2. D7 Moisture Content ,l


2
Depth (m) 12.00. 12.30 -;ont. no. M9 M10
Wdght of Sample (gm) 71.49 Nt. of wet soil+cont. W2(gm) 60.78 60.13
Diameter (mm) 50 tVt. of dry soil+cont. W3(gm) 60.31 59.63
Initial Length (mm) 19,05 rVt. of container W1(gm) 15.07 14.63
Area (n2) 0.001964 tVt. of dry soil W3-Wl 45.24 45,00
Volume (cm3) 37.42 fft. of moisture W2-W3 0.47 0.50
Moisture Content f/t 1.08 ftiloisture content(W2-W3M3-Wl )X1 00 1.04 1.11
Bulk Density (Mg/m3) 1,910 Average moisture content (%) 1,08
Dry Density (Msim3) 1,890
Z-D SAC LAB ORATORIE,S (001144285-,)

CIDB MALAYSIA No. 1991102-SL054181


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

SPECIFIC GRAVITY OF FINE. GRAINED SOIL PARTICLES


( BS 1377 : Part 2 : 1990 : 6.5 )

Client JABATAN KERJA RAYA MALAYSIA


Contractor DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/041/93 Barat Daya,
Pulau Pinang.
Lab. Ref. 20404t13
Date Tasted 11.04.2013

iample No. BH2-D2 300-3.45m BF1Z - UJ b.UU - 6.45m BHz - D4 7,50 - 7.95m
Bottle No. s ,l
2 3 4 5 6
Mass of bottle * soil * water (m3) s 84.490 83.540 82.709 84.1 88 az.Yzz 84.390
Mass of bottle + soil (m2) g x7 \\1 3t.1tc 36.884 36.9'12 37.112 37.245
Mass of bottle * water (m4) s 77.865 77.428 78.1 1 I 79.415 78,228 79.398
Mass of bottle (m1) s 26.794 27,403 29,451 29.175 29.504 29.157
Mass of soil used (m2-m1) = m5 E 10.757 9.922 7.433 7.737 7,608 8.088
Volume of soil (m4-m1)-(m3-m2) = m6 ml 4j32 3.810 2.843 2.964 2.914 3.096
3pecific gravity of soil particle I.OUJ 2.604 2.614 2.610 2,611 2.612
Gs = m5lm6
Mean value 2.60 2.6',|, 2.61

Sample No. BH2 - D5 9.00 - 9.30m BHz-D7 12.00 - 12.30m


Bottle No. s 7 8 I 10
Mass of botde * soil * water (m3) s 84.287 84.028 86.703 83.481
Mass of botde + soil (m2) s Jt .olJ 37.654 37.814 37.812
Mass of botde * water (m4) s IV.tXJ 78.142 84.741 76.784
Mass of bottle (m1) s 29.451 28.097 34.619 26.912
Mass of soil used (m2-m1) = m5 E 8.172 3.1 95 10.900
Volume of soil (m4-m1)-(m3-m2) = rn6 ml 3.1 38 3.671 1.233 4.203
Specific gravity of soil particle LOUl 2.603 2.591 2.593
3s = m5/m6
Mean value 2.60 2.59
Z-D SAC LAB ORATORIE,S (00114428s-D)

CIDB MALAYSIA No. 1991102-SL0s4181


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

LINEAR SHRINKAGE
( BS 1377 : Paft 2 : 1990 : 6.5 )

Client JABATAN KERJA RAYA MALAYSIA


Contractor DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/041/93 Barat Daya,
Pulau Pinang.
Lab. Ref. 20404t13
Date Tasted 08.04.2013

Sample Depth Mould Intial Length of Length of Oven-Dry Linear


No. (m) No. Specimen (m) L0 Specimen (m) LD Shrinkage (%)

gH2-D2 3.00 - 3.45 1 14.00 tJ.oc 2.50


6nt- uc 1.00 - 9.30 I 14.00 13.70 2.14
BH2-D7 12.00 - 12.30 14,00 IJ.OU 2.86
Z-DSAC LABORATORItrS (001144285-rr)

CIDB MALAYSIA No. 1 9911 02-SL0541 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field lnstrumentaticin

ATTERBERG LIMITS
Method of Testing: BS 1377 -Part2 - 1990 (Clause 4.5 - Casagrande Method)

Client JABATAN KERJA RAYA MALAYSIA


Contractor DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/04'1/93 Barat Daya,
Pulau Pinang.
Borehole / Sample No. BH2-D2
Depth (m) 3.00 - 3.45
Lab. Ref. 20404t13
Date 08.04.2013
fest LIQUID LIMIT PLASTIC LIMIT
lontainer No. M1 M2 M3 M4 P1 P2
Blows
tlo, Of N 17 21 29 ?7

Container + Wet Soil W1 (gm) 11.21 11.48 12.24 12,32 7.83 8.10
Container +Dry Soil W2 (om) 10.23 '10.65 11.42 11.75 7.01 7.21
Container W3 (qm) 8.02 8,04 8,04 3.60 J.C+
Water, W1-W2 W4 (gm) 0.98 0.83 0.82 0.57 0.82 0.89
Dry Soil, W2-W3 W5 (sm) 2.21 2.61 ??o 3.71 3,41 3.67
Water Content, W4/lV5 X 100 (%) 44.34 31.80 24.19 15.36 24.05 24.25

LIQUID LIMIT {Il


Yo PLASTIC INDEX Yo

PLASTIC LIMIT Yo ML - Clayey SILT of low plasticity


150.0
140.0
130.0
120.0
110.0
J
J 100.0
I eo.o
i 8o.o

zH 7o.o
o
o
60.0
t 5o.o
H 4o.o
30.0
= 20.0
10.0
0.0

BLOWS (N)
Z-DSAC LABORATORIES (001i4428s D)

CIDB MALAYSIA No. 1 991 1 02-SL0541 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentaticin

ATTERBERG LIMITS
Method of Testing: BS 1377 -Pafi2 - 1990 (Clause 4.5 - Casagrande Method)

Client JABATAN KERJA RAYA MALAYSIA


Contractor DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006i041/93 Barat Daya,
Pulau Pinang.
Borehole / Sample No. BH2. D5
Depth (m) 9.00 - 9.30
Lab. Ref. 20404t13
Date Testing 08.04.2013
Test LIQUID LIMIT PLASTIC LIMIT
Container No, M5 M6 M7 M8 P3 P4
No, Of Blows N '18 23 ZY
Container + Wet Soil W1 (qml 11.49 12.08 12.13 12.30 7.88 7.92
Container +Dry Soil W2 (gml 10.56 11.12 11,32 11.65 7.05 7.10
Container W3 (qml 8,01 7.98 8.01 8.02 3.65 3.71
Water, W1-W2 W4 (qml no? 0.96 0.8'1 u.oc 0.82
Dry Soil, W2-W3 W5 (oml 2,55 3.14 ? ?,1
3.63 3.40 ??o
uVater Content, W4/VV5 X 100 (%', 36.47 30.57 24.47 17.91 24.41 24.19

LIQUID LIMIT 28 Yo PLASTIC INDEX Yo


o/o
PLASTIC LIMIT 24 ML - Clayey SILT of low plasticity
150.0
140.0
130.0
120.0
1 10.0
J 100.0
-5 90.0
i 8o.o
rt
z 7o.o
o
o
60.0
t 5o.o
40o
H 3o.o
= 20.0
10.0
0.0

BLOWS (N)
Z-DSAC LABORATORIE S (001144285 u)

CIDB MALAYSIA No. 1 9911 02-SL0541 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

ATTERBERG LIMITS
Method of Testing: BS 1377 -Paxt2 - 1990 (Clause 4.5 - Casagrande Metlod)

Client JABATAN KERJA RAYA MALAYSIA


Contractor DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FI006/041i93 Barat Daya,
Pulau Pinang.
Borehole / Sample No. BH2-D7
Depth (m) 12.00 - 12,30
Lab. Ref. 20404t13
Date 08.04.2013
Test LIQUID LIMIT PLASTIC LIMIT
Container No. M9 M10 M11 M12 P5 P6
No. Of Blows N 18 zz 27
Container + Wet Soil W1 (qml 11.59 11.75 11,95 7.78 7,53
Container +Dry Soil W2 (qml 10.63 10.72 10.89 11.13 6.98 6,78
Container W3 (qml 8.02 8.03 8.02 8.03 3.68 3.70
Water, W1-W2 W4 (oml no? 0,87 0.86 0.82 0.80 u./c
Dry Soil, W2-W3 WS (sm) 2.61 LOY 2.87 3.10 < <Il
3.08
Water Content, W4/W5 X 100 (%) 35.63 32.34 29.97 26.45 24.24 24.35

LIQUIDLIMIT 31 % PLASTIC INDEX Yo

PLASTIC LIMIT 24 O/O


ML - Clayey SILT of low plasticity
150.0
140.0
130.0
ll
't20.0 .........................""".1..,...............................................1.................
t

110.0
J
J 100.0
-
5. 90.0
i Bo.o
H
z 7o.o
o
o
60.0
t 5o.o
F
<l
40.0
30.0
= 20.0
10.0
0.0

BLOWS (N)
Z-DSAC LABORATORItrS (00ri4428s-u)

CIDB MALAYSIA No. 1 9911 02-SL0s41 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

PARTICLE SIZE DISTRIBUTION GRADATION CURVE


8S1377:Part2:1990

Client JABATAN KERJA RAYA MALAYSIA


Contracto DEEP ROCKS SDN, BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/041i93 Barat Daya, Pulau Pinang.

Sieve analysis (Coarse qrained) Hydrometer analysis (Fine grained)


Weight Retained Passing Time Elapsed Hydrometer Rh'-Cm Particle Modified % Frner
Sieve Retained Time Reading =Rh Diameter Hydrometer Than D
o/o
mm Gm) Yo 8.10 Rh' D (mm) Reading Ko/o

37.5 0.00 0,00 100,00 8.10 30 secs 7.02 o.6l 0.0720 7.02 22.82
20,0 0.00 0.00 100.00 8.11 1 min 6,85 6.65 0.0510 6.85 22,26
14.0 0.00 0.00 100.00 8.12 2 mins 6.55 6.35 0.0362 21.29
10.0 0,00 0.00 100.00 8.14 5 mins 5.20 5.00 0.0233 5.20 16.90
0,00 0.00 100.00 8.18 8 mins 4.20 4.00 0.0186 4.20
5,0 0.63 1.26 98.74 8.25 15 mins 3.55 0.0137 11.54
2,0 8.91 17.82 80.92 8.40 30 mins 3,35 3.15 0.0097 224 10,89
1.180 6,08 tz. lo 68.76 9.10 '1 hours 3.00 2.80 0.0069 3.00 9.75
0.600 5.88 11.76 57.00 10.10 2 hours 2.65 2.45 0.0049 2.65 8,61
0.425 2.66 5,32 51,68 12.10 4 hours 2.25 2.05 0,0035 2.25 7.31
0,300 3.85 7.70 43.98 14.10 6 hours 2,00 1,80 0.0028 2.00 6.50
0.212 3.35 6.70 37.28 8.1 0 24 hours 1,50 1.30 0.0014 1,50 4.BB
0.'150 3.65 7.30 29.98 Lab, Ref. :20404113
0.063 3,58 /. to 22.82 CLAY 7% Date Tested :09.04.2013
TOTAL 38.59 SILT 16% Tested By : Sedi
No.: BH2-D2 SAND 58% Weight of Sample (gr 50.00
Depth (m) 3.00 - 3.45 GRAVEL 19%
PARTICLE SIZE DISTRIBUTION IN SOIL

100.00
90.00 T
80,00

I 70.00
(9 60.00
z 50.00 ^"i'.1
U)
@ 40.00
)
o_ 30.00

20.00
.a'
10.00 t ".a"1
--,f a
0.00 i

0.0001 0.0010 0.0100 0.1000 1 .0000 10.0000 100.0000

DIAMETER (mm)
Z-DSAC LAB ORATORItr S (001144285.,r)

CIDB MALAYSIA No. 1 991 1 02'SL0541 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

PARTICLE SIZE DISTRIBUTION GRADATION CURVE


BS1377:Part2:1990

Client JABATAN KERJA RAYA MALAYSIA


Contracto DEEP ROCKS SDN, BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/041/93 Barat Daya, Pulau Pinang.

Sieve analvsis (Coarse qrained) Hydrometer analysis (Fine grained)


BS Weight Retained Passing Time Elapsed Hydrometer Rh'-Cm Particle Modified % Finer

Sieve Retained Time Reading =Rh Diameter Hydrometer Than D


mm 0m) % Yo 8.00 Rh' D (mm) Reading Ko/o

37.5 0.00 0.00 100.00 8.00 30 secs 2.39 2.19 0.0758 2,39 7.77
20.0 0.00 0.00 100.00 8.01 1 min 2.20 2.00 0.0537 2.20 7,15
14.0 0.00 0.00 100.00 8.02 2 mins 2,00 1.80 0.0380 2.00 6.50
10.0 0.00 0.00 100.00 8.04 5 mins 1.75 1.55 0.0241 I -7E 5.69
3.19 o.Jd 93.62 8.08 B mins 1.26 1.06 0.0192 1,26 4.08
5.0 8.99 17.98 75.64 8.15 15 mins 0,95 0.75 0.0140 0.95 3.09
2.0 5.17 10.34 65.30 8.30 30 mins 0,80 0.60 0.0099 0.80 2.60
1.180 4.60 9.20 56.10 9.00 t hours 0,75 0.0070 2.44
0.600 2.25 4,50 51.60 10.00 2 hours 0,72 0.52 0.0050 0.72 2.34
0.425 9.43 18.86 32.74 12.00 4 hours 0,70 0.50 0.0035 0,70 2.28
0.300 2,85 5.70 27.04 14.00 6 hours 0,60 0.40 0.0029 0.60 1.95
0.212 3.38 6.76 20.28 8.00 24 hours 0,40 0,20 0,0014 0.40 1.30
0.1 50 3,20 6.40 13.88 Lab. Ref. :20404113
0.063 3.05 6.10 7.78 CLAY 2 Yo Date Tested :09.04.2013
TOTAL 46,',!1 SILT 6 % Tested By : Sedi
Borehole/Sample No. : BH2 - D3 SAND 57 % Weight of Sample (gr 50.00
Depth (m) : 6.00 - 6.45 GRAVEL 35 o/o

PARTICLE SIZE DISTRIBUTION IN SOIL

100.00 i
l
90.00
80.00
s 70.00 f
o 60.00 af
z 50.00
6
a 40.00
o- 30.00
20.00
..a'
10.00
-5
0.00
0.0001 0.0010 0.0100 0.1000 1.0000 10.0000 100.0000

DIAMETER (mm)
Z-DSAC LAB ORATORItr S eu1442*s.D)
CIDB MALAYSIA No. 1 9911 02-SL0541 81

Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

PARTICLE SIZE DISTRIBUTION GRADATION CURVE


BS 1377: Part2:1990

Client JABATAN KERJA RAYA MALAYSIA


Contracto DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/041/93 Barat Daya, Pulau Pinang.

Sieve analysis (Coarse qrained) Hydrometer analysis (Fine qrained)


BS Weight Retained Passing Time Elapsed Hydrometer Rh'-Cm Particle Modified % Finer
Sieve Retained Time Reading =Hn Diameter Hydrometer Than D
mm (sm) % % 8.05 Rh' D (mm) Reading Ko/o

27F 0,00 0.00 100.00 8.05 30 secs 3.62 3.42 0.0748 3.62 11.77
20.0 0,00 0.00 100.00 8.06 1 min 3.50 ??n 0.0530 11.38
14.0 0,00 0.00 100,00 8.07 2 mins 3.20 3.00 0.0376 3.20 10.40
10.0 0,00 0.00 100.00 8.09 5 mins 3.00 2.80 0.0238 3.00 9.75
0,00 0.00 100.00 8.13 8 mins 2.50 2.30 0.0189 2.50 8.13
5.0 0.69 1.38 98.62 8.20 15 mins 2.15 106 0.0139 z. ta Aqq
2,0 16.16 JI,JI 66,30 30 mins 1.95 1.75 0.0098 1,95 6.34
1 .'t 80 10.94 21.88 44,42 9.05 '1 hours 1.60 1.40 0.0070 1.60 5.20
0.600 7.57 15.14 29.28 10.05 2 hours 1.42 1.22 0.0049 1,42 4.62
0.425 2.68 23,92 12.05 4 hours 1.20 1.00 0.0035 1,20 3.90
0.300 0.09 0.18 23.74 14,05 6 hours 0.95 0.0029 n06 ?no
0,212 2.08 4.16 19.58 8,05 24 hours 0.80 0.60 0.0014 0.80 2.60
0,1 50 2.13 4.26 15.32 Lab. Ref. :20404113
0,063 '1.75 11.82 CLAY 3 % Date Tested :09.04.2013
TOTAL 44.09 SILT I Yo Tested By : Sedi
Borehole/Sample No. : BH2 - D4 SAND 54 % Weight of Sample (gr 50.00
Depth (m) : 7,S0 - 7.9S GRAVEL 34 Yo

PARTICLE SIZE DISTRIBUTION IN SOIL

100.00
90.00
I
I Ii I

80.00
l/
70.00
E 60.00
o
z 50.00
6
o 40.00 J
o- 30.00
20.00
^+
..J"l
10.00 i>
0.00 a ?
0.0001 0.00'10 0.0100 0.'1000 1.0000 10.0000 100.0000

DIAMETER (mm)
Z-DSAC LABORATORIE S (001144285.D)

CIDB MALAYSIA No. 1 99'l 1 02-SL0s41 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

PARTICLE SIZE DISTRIBUTION GRADATION CURVE


BS 1377: Part2:1990

Client JABATAN KERJA RAYA MALAYSIA


Contracto DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FI006/041/93 Barat Daya, Pulau Pinang.

Sieve analysis (Coarse grained) Hydrometer analysis (Fine grained)


BS Weight Retained Passing Time Elapsed Hydrometer Rh'-Cm Particle Modified % Finer
Sieve Retained Time Reading =Rh Diameter Hydrometer Than D

mm 0m) Yo % 8,15 Rh' D (mm) Reading Ko/o

37.5 0.00 0.00 100.00 B.'15 30 secs 6,51 6.31 0.0725 6.51 21.16
20.0 0,00 0.00 100.00 8.16 1 min 6,35 6.15 0.0513 A?6 20.64
14.0 0,00 0.00 100,00 8,17 2 mins 6.10 5.90 0.0364 6.10 10 R?

10.0 0,00 0.00 100.00 8.19 5 mins 5.80 5.60 0,0231 5.80 18,85
A? 0.00 0.00 100.00 8,23 8 mins 5.20 5.00 0.0184 5.20 16.90
5.0 2.83 5,66 94.34 8.30 15 mins 4.50 4.30 0.0135 4.50 14.63
2,0 13.61 27.22 67.12 8.45 30 mins 4,00 3.80 0.0096 4.00 13.00
1.180 5,28 10,56 56.56 9.15 t hours 3,80 3.60 0.0068 3.80 12.35
0.600 3.94 7.88 48.68 10.15 2 hours 3,35 3.15 0.0048 3.35 10.89
0.425 1.62 3.24 45.44 12.15 4 hours 3,00 2.80 0.0034 3.00 076
0.300 2.54 5.08 40.36 14.15 6 hours 2.55 2,35 0.0028 2,55 8.29
0.212 4.12 8.24 32.12 8.15 24 hours 2.20 2,00 0.0014 2.20 /. tc
0.1 50 4.65 9.30 tz.6l Lab. Ref, :20404113
0.063 0.83 t.00 21,16 CLAY 8Yo Date Tested :09.04.2013
TOTAL 39.42 SILT 13% Tested By : Sedi
: BH2-D5 SAND 46% Weight of Sample (gr 50.00
Depth (m) 9.00 - 9.30 GRAVEL 33%
PARTICLE SIZE DISTRIBUTION IN SOIL

100.00
I
90.00
80.00
/'i
s 70.00
o 60.00 f
z 50.00
-a
a 40.00
Jn
30.00
j
20.00
l ...c' ii
10.00 i)* +fi"(
i
tl
0.00
0.0001 0.0010 0.0100 0.1000 1.0000 10.0000 100.0000

DIAMETER (mm)
Z-DSAC LABORATORIES (001144285-D)

CIDB MALAYSIA No. 1 9911 02-SL0541 81


Site lnvestigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

PARTICLE SIZE DISTRIBUTION GRADATION CURVE


BS 1377: Part2:1990

Client JABATAN KERJA RAYA MALAYSIA


Contracto DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/041/93 Barat Daya, Pulau Pinang.

Sieve analvsis (Coarse qrained) Hvdrometer analvsis Fine orained)


Rq Weight Retained Passing Time Elapsed Hydrometer Rh'-Cm Particle Modified % Finer

Sieve Retained Time Reading =Rh Diameter Hydrometer Than D


mm Gm) % % 8.20 Rh' D (mm) Reading K%

37.5 0.00 0.00 100,00 8,20 30 secs 8,10 7.90 0.0711 8.1 0 26.33
20,0 0.00 0.00 100.00 8.21 1 min 8,06 7.86 0,0503 8.06 zo.zu
14.0 0.00 0.00 100,00 8,22 2 mins 8.00 7.80 0.0356 8.00 26.00
10.0 0.00 0.00 100.00 8.24 5 mins 7.65 7.45 0,0226 7AF 24,86
6.3 0.00 0.00 100,00 8,28 8 mins 7.42 7.22 0.0179 7.42 24.12
5.0 2.95 5.90 94.1 0 15 mins 6,54 6.34 0.0132 6.54 21.26
,t0 6n
2,0 12.62 25.24 68.86 8.50 30 mins 6,00 5.80 0,0094 6,00
1.180 4.95 oon 58.96 9,20 t hours 5.50 5.30 0.0067 17.88
0.600 3.56 7.12 51.84 10.20 2 hours 4.25 4.05 0.0048 4.25 13.81
0.42s 1,85 3.70 48.14 12,20 4 hours 3.35 3.15 0.0034 10.89
0.300 3.24 6.48 41.66 14.20 6 hours 3.00 2.80 0,0028 3,00 9.75
0.212 3,46 6.92 34.74 8.20 24 hours 2.65 t.4c 0.0014 2,65 8,61

0,1 50 3.25 6.50 28.24 Lab. Ref. :20404113


0,063 0.95 1.90 26.34 CLAY 10 % Date Tested :09.04.2013
TOTAL 36.83 SILT 16 o/o
Tested By : Sedi
: BH2-D7 SAND 43 To Weight of Sample (gr 50.00
Depth (m) 12,00 - 12,30 GRAVEL 31
OI
to

PARTICLE SIZE DISTRIBUTION IN SOIL

100.00
90.00
80.00
70.00
E 60.00
o
z 50.00
U)
U) 40.00
(L 30.00

20.00
10.00
0.00
0.0001 0.0010 0.0100 0.1000 1 .0000 10.0000 100.0000

DIAMETER (mm)
Z-DSAC LABORATORItr S (001144285 u)

CIDB MALAYSIA No. 1991102-SL054181


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

UNCONFINED COMRESSIVE STRENGTH OF ROCK CORE

Client JABATAN KERJA RAYA MALAYSIA


Contractor DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/04'1l93 Barat Daya, Pulau Pinang.
Lab. Ref. 20404t13
Date 08.04.2013
Method of Testing : ASTM D2938 - 1986

1 z
Samole No. BHI -C3 BH1 - C5
uepth (m) 4.20 - 5.70 5.70 -7.20
Length,h (mm) 102.00 106.00
Diameter,d (mm) 51.50 51.50
Weiqht ( om ) 534.56 553.53
Area ( mm2 ) 2083.91 2083.91
Volume ( cm3 ) 212.56 220.89
Density ( Mq/m3 ) 2.515 2.506
General Moisture Condition as-received as-received
Rate of Loading (kN/s) 2.5 2.5

Compressive Load ( kN ) 150.00 182.00

Compressive Strength, Ca ( N/mm2 ) 72.05 87.42

Computed Compressive
Strength,C (N/mm2) 71,96

Remarks: Computed Compressive Strength Of An Equivalent h/d = 2


c = ca / [0.88 + (0.2a dh)l

A sketch of the fractured sample

Strong Strong
( after testing )

sual descriotion
BH1 - C3 Strong, white, solid granite with little fractured rock.
BH1 - C5 Strong, white, solid granite.
Z-D SAC LAB ORATORItrS (001144285.,)

CIDB MALAYSIA No. 1 991 1 02-SL0541 81


Site Investigation - Soil, Asphaltic & Concrete Testing - Chemical Testing - Field Instrumentation

UNCONFINED COMRESSIVE STRENGTH OF ROCK CORE

Client JABATAN KERJA RAYA MALAYSIA


Contractor DEEP ROCKS SDN. BHD.
Project Kerja-Kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT 006/041/93 Barat Daya, Pulau Pinang.
Lab. Ref. 20404t13
Date 08.04.2013
Method of Testing : ASTM D2938 - 1986

3 4 A 6
Sample No. BH2 - C3 BH2-C4 BH2 - C5 BH2 - C6
lJepth (m ) 4.80 - 5.80 6.70 - 7.00 8.00 - 9.00 9.40 - 10.55
Lensth,h (mm) 151.00 104.00 96.00 106.00
Diameter,d (mm) 76.00 52.00 52.00 52.00
Weiqht ( om ) 1806.50 548.60 497.36 556.12
Area ( mm2 ) 4538.29 2124.57 2124.57 2124.57
Volume ( cm3 ) 685.28 220.96 203.96 225.20
Densitv ( Mo/m3 ) 2.636 2.483 2.439 2.469
General Moisture Condition as-received as-recerveo as-received as-received
Rate of Loadino (kN/s) 2.5 2.5 2.5 2.5

Compressive Load ( kN ) 525.00 340.00 155.00 158.00

Compressive Strength, Ca ( N/mm2 ) 115.79 74.99 34.18 34.85

Computed Compressive
Strength,C (N/mm2) 115.70 33.85

Remarks : Computed Compressive Strength Of An Equivalent h/d = 2


c = ca / [0.88 + (0.2a dth)l

A sketch of the fractured samole

( after testing
very strong Strong Moderately Moderately
)
Stronq Stronq
rsual
BH2 - C3 Very strong, white, solid granite.
BH2 - C4 Strong, white with black spot boulders, granite.
BH2 - C5 Moderately strong, white, solid granite.
BH2 - C6 Moderately strong, white, solid granite.
.r-,

-
:-F-
--
f

-
\-ln-
If --L
G EOS OI L EN GI N EERT N G
(Company No. :001700965-K)
.-
I I
-- --
-
POINT---
L-OE TEST RESULTS . D|AMEtT|CAI TESt
( rsRM 198s )
-
PROJECT MENGGANTIMN JAMBATAN SEDIA ADA DI JAMBATAN FT 006 / 041 / 93 BARAT DAYA, PULAU PINANG.

DATE TESTED : 12 I 04 I 2013

Borehole No . BH1 BH1


Sample No c3 c5
Depth (m) 4.50 - 5.70 5.70 -7.20

Diameter of Sample, D ( mm ) 51.5 51.5


Area of Sample ( mm' ) 2083.07 2083.07
Volume of Sample ( cm' ) 212.47 129.15
Load at Failure, P ( kN ) 9.6 10.3
Point Load Strength,
uncorrected, ls (MPa 4.609 4.945
)

Correction factor, F = ( D" / 50 loes 1.100 1 .100


Point Load Index,
ls(50)=F.ls(MPa) 5.07 5.44

Type of Sample Granite Granite

Specimen Before Failure

Specimen After Failure


.-,.-
--
f f

--Er
-
--L
G EOSOI L EN GI N E ERI N G
(Company No. : 001 700963-K)
I
-.-I
---
--- -,
POINT-.JL-m TEST RESULTS . D|AMEtT|CAI TCSI

-' ( tsRM 1985 )

PROJECT : MENGGANTIKAN JAMBATAN SEDIA ADA DI JAI\4BATAN FT 006 / 041 / 93 BARAT DAYA, PULAU PINANG.

DATE TESTED : 121 04 | 20'13

Borehole No. BH2 BH2


Sample No c3 c5
Depth (m) 4.80 - 5.80 8.00 - 9.00

Diameter of Sample, D ( mm ) to 52
Area of Sample ( mm' ) 4536.46 2123.72
Volume of Sample ( cm' ) 462.72 131.67
Load at Failure, P ( kN ) 25.0 10.2
Point Load Strength,
uncorrected, ls ( MPa 5.51'l 4.803
)

Correction factor, F = ( D" / 50 )oot 1.100 1.100


Point Load lndex,
ls(50)=F-ls(MPa) 6.06 5.28

Type of Sample Granite Granite

Specimen Before Failure

Specimen After Failure


DEEP ROCKS SDN. BHD. 2013

APPENDIX C
(FHOTO)
Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 1 : BH 1

Photo 2 : Disturbed Sample BH 1


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 3 : Disturbed Sample BH 1

Photo 4 : Disturbed Sample BH 1


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 5 : Disturbed Sample BH 1

Photo 6 : Disturbed Sample BH 1


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 1 : BH 2

Photo 2 : Disturbed Sample BH 2


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 3 : Disturbed Sample BH 2

Photo 4 : Disturbed Sample BH 2


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 5 : Disturbed Sample BH 2

Photo 6 : Disturbed Sample BH 2


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 1 : BH 1

Photo 2 : Disturbed Sample BH 1


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 3 : Disturbed Sample BH 1

Photo 4 : Disturbed Sample BH 1


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 5 : Disturbed Sample BH 1

Photo 6 : Disturbed Sample BH 1


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 1 : BH 2

Photo 2 : Disturbed Sample BH 2


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 3 : Disturbed Sample BH 2

Photo 4 : Disturbed Sample BH 2


Kerja-kerja Penyiasatan Tanah Dan Ujian Makmal Bagi Projek Cadangan
Menggantikan Jambatan Sedia Ada Di Jambatan FT006/041/93 Barat Daya,
Pulau Pinang.

Photo 5 : Disturbed Sample BH 2