IMIR Perfect

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Perfect Enginnering

OWNER CONTRACTOR OWNER


IN-COMING MATERIAL INSPECTION REPORT
Report No.:
F. NO. :AMNS/CRM2/MECH/FORM-1 Rev - 00 Date:
Project:
Contractor: : Namre of Work:
Work order: : P.O.No. &Date: Job No.:
LR No.:

MTC No./ IRN


Material Qty. Qty. Observation /
Date of Manufacturer/ No. With date & Heat/ Batch Ref. Invoice/
Sl. No. SOR Item No. Description/ UOM Received Accepted Remarks / Storage
Receipt Vendor Field lab Test No. Challan No.
Tag. No. (MT) (MT) Instruction
etc.
1
2
3
4
5

Note:
INSPECTION ACTIVITY AT SITE (Tick as applicable)
2. Material Condition appears to be
1. Quantity verified and found in Ordrer 3. Heat/ Batch/ Tag. No. Mentioned on the Material
good.
4. Color Coading done as applicable 5. Site Identification Mark on material 6. Correlation w.r.t.IRN/MTC/Lab test report
7. TC Verification w.r.t IRN/ Spec./ QAP. Etc. 8. Check for Vendor/ Source approval 9. Special requirement if any

Contractor field Engineer Contracor QA/QC In-Charge


Contractor RCM/PM AMNS India
Name: Name: Name: Name: