QA / QC INSPECTION CHECKLIST

ELECTRICAL SYSTEM

PROJ NO. PRO TITLE

DATE LOCATION

INSPECTION DATE LOCATION / AREA QA /QC AWARNESS CHECKPOINT


1ST 2ND CEILING WALL FLOOR TRUNKING & CONDUIT INSTALLTION

1. Check material & accessories approved by consulatant / Client

2. Ensure the routing of trunking & conduit follow as per approval


shop drawing.
3. Ensure proper bend, correct height and enough rod/ bracket/
clamp used for support.
4. Make sure spacing of support for different conduit sizes used,
per request.
5. Make sure use correct sizes of truking and conduit to have
enough spaces for pull/laying cable.
6. All conduit on walls are to be run neatly, horizontally or
vertically.
7. Firestops install at penetrations through fire partitions / fire
wall / smoke partitions or floor.
8. Ensure penetrations through floor / exterior wall and above
ceiling sealed.
9. Flexible connections to equipment with approved length and
secured propelly with trunking or conduit
10. Labeling on trunking and conduit.

COMMENT / REMARK :

WITNESSED BY: TRADE CONTRACTOR


BY PLM : SECM / CM / CE

Signature : Signature :
Name : Name :
Date : Date :

QA / QC INSPECTION CHECKLIST
ELECTRICAL SYSTEM

PROJ NO. PRO TITLE

DATE LOCATION

INSPECTION DATE LOCATION / AREA QA /QC AWARNESS CHECKPOINT


1ST 2ND CEILING WALL FLOOR PULL / LAYING CABELING WORK

1. Check material & accessories approved by Consulatant / Client

2. Ensure use approved sizes of cable as per approved shop


drawing.
3. Ensure all the cable dropper or the point according to
fittings / panel / equipment location.
4. Prepare spare length of cable avaliable before do any
termination on fittings / panel / equipment.
5. Ensure the cable bending radius, acceptable.

6. Ensure cable plug / clamp for termination on DB


panel used.
7. Ensure cable labeling and carry on proper insulation test.

COMMENT / REMARK :
WITNESSED BY: TRADE CONTRACTOR
BY PLM : SECM / CM / CE

Signature : Signature :
Name : Name :
Date : Date :

QA / QC INSPECTION CHECKLIST
ELECTRICAL SYSTEM

PROJ NO. PRO TITLE

DATE LOCATION

INSPECTION DATE LOCATION / AREA QA /QC AWARNESS CHECKPOINT


1ST 2ND CEILING WALL FLOOR LIGHT FITTINGS INSTALLTION

1. Ensure all the wiring work complete and tested.

2. Refer approved shop drawing / latest version before


installtion.
3. Ensure all the light fittings received at site as per approved
material submission.
4. Light fittings to be install in line and parallel with other line of
fixtures as per approved drawing.
5. Ensure heavy light fittings shall be support from ceiling / slab,
as approved material from consulatant.
6. Make sure light fittings connected with earthing cable on the
base.
7. Ensure light fiitings clean before installtion and shall used
gloves during installation.
8. No finger prints or dust on light fitting louvers.

9. Double check correct lamp are fixed as per approved drawing.

10. Turn on/off lighting for testing.

COMMENT / REMARK :
WITNESSED BY: TRADE CONTRACTOR
BY PLM : SECM / CM / CE

Signature : Signature :
Name : Name :
Date : Date :

QA / QC INSPECTION CHECKLIST
ELECTRICAL SYSTEM

PROJ NO. PRO TITLE

DATE LOCATION

INSPECTION DATE LOCATION / AREA QA /QC AWARNESS CHECKPOINT


1ST 2ND CEILING WALL FLOOR SWITCHES AND SOCKET INSTALLATION

1. Check material & accessories as approved by Consulatant /


Client
2. Verify all the switches / socket location and height from
consultant and client.
3. Ensure install alignment with other switches / socket.

4. Ensure parallel installtion of socket outlet not to near each


other.
5. Ensure follow approved shop drawing on switches / socket
outlet location on tiles / carpet / funiture / waldrope .
6. Ensure the switches / socket on off switch in good
condition.
7. Labeling on switches and socket / update circuit details /
location or area
8. Procceed with testing.

COMMENT / REMARK :
WITNESSED BY: TRADE CONTRACTOR
BY PLM : SECM / CM / CE

Signature : Signature :