RWINH-24036/2 7/2021-BP&SP-Pa rt (1)

Govern ment of India


Mi nistry of Road Transport & Highways
Transport Bhawan, 1, Parliament Street, New Delhi-ll 0001

Dated 11th August, 2022


OFFICE MEMORANDUM (t hrough email )
Subject: GI S mapping of all Nat iona l Highways - Reg.

Ref. (i) Ministry 's OM of even number, dated 03. 06.202 2;


(ii) Mini stry' s OM, dated 11. 07. 2022;
(iii) VC Meeti ngs hel d on 15.07. 2022 & 22.07.2022;
(iv) Minist ry 's OM, dated 28.07 .2022.

Kind attention is drawn to OMs under reference (i), (ii) and (iv) above and VC
meetings held in this conte xt on 15.07.2022 and 22.07.2022 (ref. (iii) above) on t he above
mention ed subj ect (copies attached for ready reference ).
2. The process of validat ion of NHs projectsl alignments on GIS platform of PM
GatiShakti NMP portal is still in progress as information pertaining to NHs entrusted with
State Governments are not fully made availab le and no information perta ining to NHs
entrusted wit h BRO has been received so far.
3. All concerned Stat es l UTs and BRO are requested to provide the requisite details as
per format s attached with OM under reference (ii) above URG ENTLY without any further
delay as the timeline of 31.07.2022 for submission is already overdue.
4. Kind attention is drawn to need for ensuring compliance wi th t he following aspects
while lin king up Latitude, Longitude of Projects and KMZ / KML files of NHs on GIS platform
in order to facilitate mapping and ident ificat ion of NHs project locations correctly on GIS
platform: -
(i) It is requested to ensure that the accuracy of Latitude and Longit ude are
based on those being provided in DPRs by Consu ltants based on site survey data ,
etc., ensuri ng that th e KMZI KML files of the alignments are correc t refl ect ions of
site while the same may be superimposed on any available digital map sof tware I
portal ; Latitude / Longitude shall be furnished to a precision upto 06 digits of decimal
place in degrees; e. g. typical report f ormat shall be

Decimal degree Latitude: 28.568293 0N Longitude :77.08 1060 0E

(ii) The GPS survey data being gathered as part of DPR should be critically
checked by the Consultants so that no discrepancy arises with actual ground
situat ion.
5. Ensuri ng compliance wit h above would also be a major step towards eventually
enabling seamless interac tions and information sharing between various portals such as
PMIS, Data lake, RAMS , PMG , OCMS, NIP, PM GatiShakti NMP, etc. , with minor modificat ions
in some of these porta ls; this would facilitate obviat ing current cumbersome practice of
making multiple ent ri es of individual proj ect level information separately in all the portals.

(5C5£? Page 1 of 2
c.IU, ersISUDIPIDownload,IOM_KMZ_LAnONG_"'OS' 2022_Mo<O V.docx
6. It is requested to t ake not e of above and also bring it into the notice of all concerned
for needful compliance of para 3 & 4 above. ~
I I/O g!?o:>-7.-
Sudip Chaudhury
Chief Engineer (Planning)
To,
All CE-ROs / SE-ROs of the Ministry
Copy to : -

1. The Principal Secretaries/ Secretaries of all States/ } It is requested to


UTs Public Works Department! Road Construction } give di rections to
Department! Highways Department (dealing with all field units
National Highways) } dealing with
}
National Highways
2. The Managing Direct or , NHIDCL, PTI Building, New for needful actio n
Delhi -ll000l } and for providing
} pro-active supports
3. The Director General (Border Roads), Seema Sadak & cooperation to
Bhawan, Ring Road , New Delhi- 110010 } th e ROs of the
} Ministry
4. All Engineers-in -Chief and Chief Engineers of Public
Works Department of States/ UTs / Road }
Construction Departm ent! Highways Departments
}
(dealing with National Highways)

5. The Chairperson, NHAI , G-5&6, Sector - 10, }


Dwarka, N. Delhi - 110075
}

6. Sh . Ajay Patel , Project Director, BISAG- It is request ed to


N; [email protected] ; provide necessary
supports

Copy for informat ion and necessary act ion to :

1. Addit ional Secretary (Highways)


2. All ADGs
3. All JSs / CEs
4. Sh . S. S. Jha, CGM, NHAI
5. Sh. Aj mer Singh, CGM, NHAI
6. Secreta ry General, Indian Roads Congress
7. Directo r, IAHE
8. Director (NT) / SE (PL)-I / SE(PL)-II
9. NIC-fo r uploadin g on Ministry ' s websit e under "What's new"
10. Sr. PPS to Secreta ry (RT&H)
11 . PPS to DG (RD) & SS

Page 2 of 2
c.IU,ersI5UDIPIDownload,IOM. KMZ.LAn ONG.II·OB· IOZ2. Mad.IV.aocx
RW/NH-24036/27/2021-BP&SP-Part(1)
Government of India
Ministry of Road Transport & Highways
(Planning Zone)
Transport Bhawan, 1, Parliament Street, New Delhi – 110001
_____________________________________________________________________
Dated, 28th July, 2022
Office Memorandum (through email)

Subject: - GIS mapping of all National Highways – Reg.

Ref.(i) Ministry’s OM of even number, dated 03.06.2022;


(ii) Ministry’s OM, dated 11.07.2022;
(iii) VC Meetings held on 15.07.2022 & 22.07.2022.

Kind attention is drawn to the OMs under reference on the above mentioned subject
and the VC Meetings held with the ROs of the Ministry & NHIDCL on 15.07.2022 and
22.07.2022 regarding furnishing of alignment (KMZ / KML files) so that the process of GIS
mapping of NHs network on BISAG-N Portal (PM GatiShakti National Master Plan) can be
concluded urgently.
2. The status of the receipts of KMZ files for ongoing projects is attached herewith. It
may be seen from the same that the details are yet to be received for the States of Andhra
Pradesh, Chhattisgarh, Haryana, Himachal Pradesh, Jammu and Kashmir, Jharkhand,
Karnataka, Kerala, Madhya Pradesh, Maharashtra, Goa, Punjab, Rajasthan, Tamil Nadu,
Puducherry, Telangana and Tripura. Further, partial information has been received from
State of the Bihar, Gujarat & Odisha.
3. In addition to above w.r.t. ref.(ii), it is requested to furnish additional alignment files
of completed / ongoing / balance for Award projects by 30.07.2022 which are available with
the respective agencies along with the details filled in Annexure-B (these are pending for
all States / UTs).
4. All concerned Chief Engineers of Project Zones and Regional Officers are requested
to accord Top Priority in furnishing balance information positively by tomorrow (i.e.
29.07.2022) FN so that the validation of these stretches may be concluded by 31.07.2022.

Sudip Chaudhury
Chief Engineer (Planning)
To,

All CE-ROs / SE-ROs of the Ministry

Copy to : - Sh. Ajay Patel, Project Director, BISAG-N; [email protected].

Copy for information and necessary action to:


1. Additional Secretary (Highways)

2. All ADGs
3. All JSs / CEs
4. Sh. S. S. Jha, CGM, NHAI
5. Sh. Ajmer Singh, CGM, NHAI
6. Secretary General, Indian Roads Congress
7. Director, IAHE
8. Director (NT) / SE(PL)-I / SE(PL)-II
9. NIC-for uploading on Ministry’s website under “What’s new”
10. Sr. PPS to Secretary (RT&H)

11. PPS to DG (RD) & SS


Dated July 11, 2022

OFFICE MEMORANDUM

Subject: GIS Mapping of projects on National Highways

As you are aware, Bhaskaracharya National Institute for Space Applications and Geo-Informatics (BISAG-
N), Gandhinagar, Gujarat has done GIS mapping of approximately ~1,30,000 km of NHs in the country but the
same are required to be updated and verified by field units of all the agencies for the Ministry.

1. With reference to the OM dated 3rd June 2022 from Chief Engineer (Planning), all the field units of executing
agencies (such as State PWDs / RCDs, NHIDCL, BRO, etc.) were requested to verify and update the GIS mapping
of all NHs under their jurisdiction by 31st July 2022.

2. As part of this exercise, MoRT&H has identified a list of projects which were completed in the past and are
currently under implementation for Roads Wing and NHIDCL from Project Monitoring Information System (PMIS).

3. In connection with the above, field units of State PWDs and NHIDCL are requested to furnish the alignment
(KMZ / KML) files for the identified projects (list provided in Annexure – A) latest by 15th July 2022

4. The field units shall also furnish additional alignment files of completed / ongoing / Balance for Award projects
by 15th July 2022 which are available with the respective agencies along with the details filled in Annexure - B

5. The KMZ files received will be furnished to BISAG-N for uploading it on the NMP portal.

6. For any further assistance, Sh. Bidur Kant Jha, Director; 8826173057; email: [email protected], may also be
contacted in this regard

With Best Wishes,


Yours Sincerely,

Bidur Kant Jha


Director

To,
All CE-ROs / SE-ROs of the Ministry

Copy to: -
1. The Managing Director, NHIDCL, PTI Building, New Delhi – 110001
2. All Engineers-in-Chief and Chief Engineers of Public Works Department of States / UTs / Roads Construction
Department / Highways Departments (dealing with National Highways)
3. Sh. Ajay Patel, Project Director, BISAG-N; [email protected]

Copy for information and necessary action to:


1. Additional Secretary (Highways)
2. All ADGs
3. All JSs / CEs
4. Sr. PPS to Secretary (RT&H)
5. PPS to DG (RD) & SS
RW I NH-24036/2712021-BP&SP-Pa rt( 1)
Government of India
Ministry of Road Transport & Highways
Transport Bhawan, 1, Parliament Street, New Delhi-11 0001
Dated 03'd June, 2022

OFFICE MEMORANDUM

Subject : GIS mapping of all National Highways -reg ,

As you are aware that GIS mappin g of entire net work of National Highways (NHs) is
one of t he most i mpor tant requirement fo r planni ng, execut ion and monitoring of NHs
net work, but this import ant task has not been completed so far .
2. Bhaskaracharya National Institute for Space Applications and Geo-informatics
(BISAG-N), Gandhin agar , Guj arat has done GIS mappi ng of approxi mate ly 1,30,000 km of
NHs in the count ry but the same are require d to be update d and verifi ed by field units of
t he different agencies for the Ministry . The field units of NHAI in coordina tion and support
of BISAG·N are veri fyi ng t he det ails.
3. Si mila rly th e fi eld units of th e Ministry (i.e . ROs) and f ield units of ot her executing
agencies (such as State PWD sl RCDs , NHIDCL, BRO , etc.) are also req uired to engage
th emselves with BISAG-N for verif icat ion and updation of the GIS mapping of all NHs under
thei r j urisdict ion.
4. Accordi ngly , t he ROs of th e Ministry are requested to coord inat e wit h fi eld units of
other execut ing agencies ment ioned above t o depute sui table personnel from all executi ve
agencies I their f ield units inc luding from the ROs of t he Min istry in consultation wit h BISAG-
N to: -
(i) get th e det ails of all proj ect s I NH s secti ons wi t hin their respecti ve
jurisdictions checked and mapped with GIS maps of BISAG·N;
(ii ) ensure availa bility of relevant prerequisite deta ils wherever feasible (e.g.
available KML I KMZ f iles of alig nments I bypasses, ROW, chainage, et c.) wi t h field
units of respecti ve execut i ng agencies for ready reference dur ing i nt eract ion wi t h
BI SAG·N.
S. The entire exercise may be commenced immediately in consultation wit h BISAG-N
and comple te d by 31 " July, 2022.
6. NHAI has almost completed th e entire exercise f or t he NHs assigned wit h them wi t h
the cooperat ion of their fie ld units.
7. The ROs of the Ministry are requested to coordinate wi t h the ROs of NHAI for
necessary guidance i n this conte xt .
8. For any fu rther assistance , NHAI Nodal Off ice r for t his assignment [Shri 55 Jha, CGM
(Tech); Tel : 250741 00 Ext. No. 1821; M : 9234503333; email - sheoshankar@nhaL org 1 may
also be conta ct ed in this regard.

(Sudip Chaudhury )
Chief Engi neer (Planning)
To,
All CE-ROs I SE-ROs of t he Mi nist ry

Page 1 of 2
D:\CE_PL_S. 1. 2018\Gati_Shakti_MMLP\Digitizati on_NH_MopsILetter_GfS_mapping_RO_OJ'06' 2022.docx
Copy to: -

1. The Princi pal Secretaries ! Secretaries of all States ! } It is requeste d to


UTs Public Works Department! Road Construction } give directions to all
Department! Highways Department (dealing wi th field units dealing
National Highways) } wi th Nationa l
} Highways for
2. The Managing Director, NHIDCL, PTI Building, New needful act ion and
Delhi-110001 } for providing pro-
} acti ve supports &
3. The Direct or General (Border Roads), Seema Sadak cooperat ion to the
Bhawan, Ring Road, New Delhi - 110 010 } ROs of the Ministry
}
4. All Engineers-in-Chief and Chief Engineers of Public
Works Depart ment of States! UTs! Road Construct ion }
Department! Highways Departm ent s (dealing with }
National Highways)

5. The Chairperson, NHAI, G-5&6, Sector - 10, Dwarka, }


N. Delhi - 11 0 075
}

6. Sh . Ajay Pate l, Project Direct or, BISAG-N ; It is requested to provide


bisagsp7@gujara L gov. in; necessary supports

Copy for info rmation and necessary action to:

1. Additional Secretary (Highways)


2. All ADGs
3. All JSs ! CEs
4. Sh . S. S. Jha, CGM, NHAI
5. Sh . Ajmer Singh, CGM, NHAI
6. Secretary General , Indi an Roads Congress
7. Director, IAHE
8. Direct or (NT) ! SE(PL)·I ! SE(PL)-II
9. NIC-f or uploading on Ministry's website under " What' s new"
10. Sr. PPS to Secretary (RT&H)
11. PPS to DG (RD) a SS

Page 2 of 2
D:\CE_PL_5.1.2018IGati_ShaktCMMLPIDigitizotion_NH_Maps\l et te,_GIS_mappin9_RO_OJ·06·2022.docx
3R'ifiT \'lqIUllll, arrtwr '"lli(tft<l ~ i(1\it'"l l. f lJ l~<t>i(UI
~/ff " " ' " q ~q ,;;1 :Jit;{ i( '1" r ~
I <it
ALKA UPADHYAYA, lAS National Highways Author ity of India
CHAIRPERSON MINISTRY OF ROAD TRANSPORT & HIGHWAYS

NHAI/11013/LA/GIS Map/2022 Date: 17 03.2022

Subject: GIS Mapping of all Projects/National Highways with NHAI

GIS mapping of all projects of NHAI is one of the most important tool for
monitoring the projects. Unfortunately, no such mapping has been done so far at
NHAI.

2. Bhaskaracharya Institute for Space Applications and Geoinformatics (BISAG),


Gandhinagar, Gujarat has done GIS mapping of approximately 1,30,000 Km of NHs
in the country . They are ready to extend all support, including providing technical
manpower for mapping our network of highways. This in turn is to be integrated wit h
the project details available in our Datalake portal, with the help of the developer of
the portal (M/s Amnex) .

3. Both BISAG & Amnex are located at Gandhinagar/Ahmedabad. Since all the support
is available at the office of BISAG, All ROs need to depute suitable personnel, in
consultation with BISAG, and get the details of all Projects under their respective
j urisdictions checked and mapped with GIS Map of BISAG. In the first instance, RO-
Gujarat, located at Gandhinagar, may get such exercise done in the next 10 days.

4. In view of th e pressure of targets till 31'1 March, 2022, it may not be possible to
spare officers for the above mapping work by other ROs. The mapping of projects
under remaining ROs will, therefore, be taken up from 10th April, 2022 and the whole
exercise will be completed by 31't May, 2022. However, till that time, you may get the
relevant prerequisite details, viz KML file, ROW, Chainage etc., of all Projects under
your jurisdiction compiled for ready reference during checking.

5. Shri 55 Jha, CGM(T) would be the Nodal Officer at NHAI HQ for this task and he
may be contacted for any further information in this regard.

-4eee<;,
(A l ka~
Chairperson
To

All Reg ional Off icers


NHAI

NHAI, G-5&6 , Seclor-10, Dwarka. New Delhi-110075


Tel.: +91-11-25076503 , Fax: +91-11-25093605, E : chairman@nhaL org I www.nhaLg ov.in
List of projects for which alignment (KMZ / KML) files are required to be shared for Roads Wing and NHIDCL
Sr. No. Project ID Agency State Project Name Length(km) Total Project Cost Stage
1 60003 NHIDCL Andaman and Nicobar Major Bridge over Humphrey Strait Creek 1.45 277.17 Completed
2 60001 NHIDCL Andaman and Nicobar Major Bridge over Middle Strait Creek 1.9 262.97 Under Implementation
Rehabilitation and up-gradation of section from Km 242.0
3 63704 NHIDCL Andaman and Nicobar 55.46 409.85 Under Implementation
to 298.0 of NH-223 (New NH- 4) (Package-II)
Upgradation from Km 107.760 to Km 129.445, Km 130.600
4 80781 NHIDCL Andaman and Nicobar 54.71 391.01 Under Implementation
to km 138.00 and km 155.00 to km 181.00 (pkg-III)
5 80782 NHIDCL Andaman and Nicobar M&R Rehabilitation and Upgradation of Jarwa area 64.3 59.56 Under Implementation
Up-gradation of section from Km 206.00 to Km 242.00
6 102028 NHIDCL Andaman and Nicobar 33.42 234.27 Under Implementation
(Nimbutala to Austin Creek) (Package-IV)
Rehabilitation of section from km 45.00 to km 59.20 of NH
7 123227 NHIDCL Andaman and Nicobar 14.1 59.08 Under Implementation
No-4 (Package VI)
Rehabilitation of km 0.00 to km 12.00 section in Andaman
8 123230 NHIDCL Andaman and Nicobar 12 32.54 Under Implementation
Trunk Road of NH-4 (Package - V)
Rehabilitation of km 181.00 to km 206.00 section in
9 123231 NHIDCL Andaman and Nicobar 25 71.93 Under Implementation
Andaman Trunk Road (Pkg-VII)
10 151355 NHIDCL Andaman and Nicobar Construction of 4 nos. of Minor Bridges 0.01 31.32 Under Implementation
Rehabilitation of Section from km. 298+000 to Km. 330+662
11 152098 NHIDCL Andaman and Nicobar 32.36 109.33 Under Implementation
of Karala to Kalipur PKG-VIII
12 60014 NHIDCL Arunachal Pradesh Hunli-Anini road (PKG-1) 16 322.15 Under Implementation
13 60016 NHIDCL Arunachal Pradesh Hunli-Anini road (PKG-3) 39 568.92 Under Implementation
14 60017 NHIDCL Arunachal Pradesh Hunli-Anini road (PKG-4) 13.7 170.36 Under Implementation
15 60020 NHIDCL Arunachal Pradesh Akajan-Likabali-Bame road (PKG-1) 21 210.5 Under Implementation
16 60023 NHIDCL Arunachal Pradesh Akajan-Likabali-Bame Road (PKG-3) 26.12 374.73 Under Implementation
17 60025 NHIDCL Arunachal Pradesh Hayuliang â€“ Hawai Road (Pkg-I) 13.8 252.05 Under Implementation
18 60026 NHIDCL Arunachal Pradesh Hayuliang â€“ Hawai Road (Pkg-II) 17 252.79 Under Implementation
19 60027 NHIDCL Arunachal Pradesh Hayuliang â€“ Hawai Road (Pkg-III) 17.83 263.31 Under Implementation
20 60029 NHIDCL Arunachal Pradesh Hunli-Anini road (PKG-5) 13.8 182.1 Under Implementation
21 60030 NHIDCL Arunachal Pradesh Hunli-Anini road (PKG-6) 10.3 145.17 Under Implementation
22 60032 NHIDCL Arunachal Pradesh Roing-Hunli (Greenfield Alignment) 74.86 1718.59 Under Implementation
23 63151 NHIDCL Arunachal Pradesh Joram â€“ Koloriang Road (Pkg-I) 12.05 175.65 Under Implementation
24 63152 NHIDCL Arunachal Pradesh Joram â€“ Koloriang Road (Pkg-II) 11.95 176.22 Under Implementation
25 150859 NHIDCL Arunachal Pradesh Arrowa-Khupa-Hayuliang 23.08 301.06 Under Implementation
26 150860 NHIDCL Arunachal Pradesh Demwe-Brahmakund 18.46 353.9 Under Implementation
Construction of Balance work of Joram â€“ Koloriang Road
27 150992 NHIDCL Arunachal Pradesh 16.56 228.72 Under Implementation
(Pkg-III)
Construction of Balance work of Joram â€“ Koloriang Road
28 150993 NHIDCL Arunachal Pradesh 17.17 294.04 Under Implementation
(Pkg-IV)
Construction of Balance work of Joram â€“ Koloriang Road
29 150994 NHIDCL Arunachal Pradesh 15 229.71 Under Implementation
(Pkg-V)
Construction of Balance work of Joram â€“ Koloriang Road
30 150995 NHIDCL Arunachal Pradesh 15 199.03 Under Implementation
(Pkg-VI)
Construction of Balance work of Joram â€“ Koloriang Road
31 150996 NHIDCL Arunachal Pradesh 14.99 184.89 Under Implementation
(Pkg-VII)
Construction of Balance work of Akajan - Likabali-Bame
32 151432 NHIDCL Arunachal Pradesh 32.81 263.4 Under Implementation
road (PKG-2)
Construction of Balance work of Hayuliang– Hawai bypass
33 151889 NHIDCL Arunachal Pradesh 11.3 256.66 Under Implementation
Road (Pkg-IV)
Construction of Balance work of Joram â€“ Koloriang Road
34 153209 NHIDCL Arunachal Pradesh 16.03 244.1 Awarded, not Appointed
(Pkg-VIII)
35 60034 NHIDCL Assam Gohpur to Holongi 10.08 223.3 Completed
36 60038 NHIDCL Assam Silchar Badarpur 4.77 76.78 Under Implementation
37 60039 NHIDCL Assam Numaligarh to Jorhat 39.72 814.56 Under Implementation
38 60041 NHIDCL Assam Demow to End of Moran Bypass 26.9 385.57 Under Implementation
39 60042 NHIDCL Assam Kaliabor Tinali-Dolabari 14.01 811.28 Under Implementation
40 60044 NHIDCL Assam Jamuguri to Biswanath Chariali 26 520.01 Under Implementation
41 60048 NHIDCL Assam Balachera-Harangjao 25.25 818 Under Implementation
42 60049 NHIDCL Assam Moran Bypass to Bogibeel Junction 19.18 330.3 Under Implementation
43 60051 NHIDCL Assam Rangagara to Kaliabor Tinali 18.32 289.99 Under Implementation
44 149300 NHIDCL Assam Hapachara to Tulungia road Km 0.00 to Km 14.050 14 220.19 Under Implementation
Rehabilitation and Up-gradation of Dergaon Town to 4
45 149353 NHIDCL Assam 11 287.63 Under Implementation
laning from km 426.800 to km 437.400
46 149360 NHIDCL Assam Nagaon By-pass to Teliagaon Package-1 10 225.02 Under Implementation
47 149361 NHIDCL Assam Teliagaon to Rangagara Package-2 8.4 225.02 Under Implementation
48 151704 NHIDCL Assam Daboka- Kthkhati Pkg-5 17.43 288.85 Under Implementation
49 150559 NHIDCL Assam Jogighopa Bridge to Agia (Package-6) 12.3 208.84 Under Implementation
50 150699 NHIDCL Assam One time improvement of Moran Town 3.5 14.52 Under Implementation
51 150844 NHIDCL Assam Daboka- Kthkhati Pkg-3 (Dokmoka- Loring Thepi) 15.01 278.46 Under Implementation
52 151165 NHIDCL Assam MMLP (Package-I: Road and Utility Works) 4.25 693.97 Under Implementation
53 151166 NHIDCL Assam MMLP (Package-II: Building and Infrastructure works) 0.01 0 Under Implementation
54 151167 NHIDCL Assam MMLP (Pkg.-III : External Rail Connectivity) 3.76 0 Under Implementation
4 lane bridge including approaches over River Brahmaputra
55 151239 NHIDCL Assam 19.28 4997.04 Under Implementation
between Dhubri and Phulbari
Jia Bharali Bridge of 1.2 Km along with its approaches and
56 151410 NHIDCL Assam 1.94 503.14 Under Implementation
RTW from km 25.552 to km 27.500
Daboka- Kthkhati Pkg-4 ( Loring Thepi â€“ Ganapath Gaur
57 151433 NHIDCL Assam 15.47 260.07 Under Implementation
Gaon)
4-L Tulungia Jogighopa Bridge Approach Section of
58 151637 NHIDCL Assam 18.9 636.42 Under Implementation
Bilasipura- Guwahati (Package-5)
59 151703 NHIDCL Assam Daboka- Kthkhati Pkg-2 15.21 335.88 Under Implementation
60 152291 NHIDCL Assam 2-Lane Brahmaputra River Bridge at Jogighopa 4.38 746.76 Under Implementation
Construction of Balance work of Biswanath Chariali to
61 152731 NHIDCL Assam 57.5 1099.35 Under Implementation
Gohpur
62 152732 NHIDCL Assam Construction of Balance work of Jorhat to Jhanji 37.8 738.15 Under Implementation
63 152733 NHIDCL Assam Construction of Balance work of Dolabari to Jamuguri 16.86 1049.51 Under Implementation
Deveopment of Inland Water Transport (IWT) Terminal at
64 153343 NHIDCL Assam 0.1 70.92 Under Implementation
Jogighopa
65 152336 NHIDCL Assam Daboka- Kthkhati Pkg-6 31.88 625.64 Awarded, not Appointed
66 153150 NHIDCL Assam Dibrugarh-Lahoal-Chabua Bypass Pkg-1 24.6 215.27 Awarded, not Appointed
67 153193 NHIDCL Assam Digboi, margherita & Ledo Bypass Pkg-2 19.73 0 Awarded, not Appointed
68 60060 NHIDCL Jammu and Kashmir Z-Morh Tunnel on (DBFOT) Annuity basis 12 2726.42 Under Implementation
69 66765 NHIDCL Jammu and Kashmir Chenani-Sudhmahadev 16.99 255.9 Under Implementation
Jammu-Akhnoor from Canal Head (Km 0.800) to Ganesh
70 80719 NHIDCL Jammu and Kashmir 5.2 450.05 Under Implementation
Vihar (Km 6.000)
Jammu-Akhnoor from Ganesh Vihar (Km 6.000) to Khati
71 138017 NHIDCL Jammu and Kashmir 20.35 322.49 Under Implementation
Chowk(Km 26.350) Pkg=III
Bi-directional Tunnel at Km 83 of 495 m along with
72 149359 NHIDCL Jammu and Kashmir 1 91.29 Under Implementation
approach road of 664 m and a Major Bridge of 110 m
73 150679 NHIDCL Jammu and Kashmir (i) Zoji-la Tunnel and (ii) Connecting Road to Z Morh 32.62 6808.69 Under Implementation
74 150682 NHIDCL Jammu and Kashmir Baramulla-Gulmarg 42.82 146.31 Under Implementation
75 150870 NHIDCL Jammu and Kashmir Goha-Khellani Package I 9.46 228.39 Under Implementation
76 150872 NHIDCL Jammu and Kashmir Goha-Khellani Package II 8.73 210.79 Under Implementation
77 151430 NHIDCL Jammu and Kashmir Khellani-Khanabal Pkg 1 20.25 486.45 Under Implementation
78 151431 NHIDCL Jammu and Kashmir Khellani-Khanabal (Vailoo) to (Donipawa) Pkg- 6 27.94 285.28 Under Implementation
79 151439 NHIDCL Jammu and Kashmir Goha-Khellani (Khellani Bypass Tunnel) Package- III 2.42 749.61 Under Implementation
80 151691 NHIDCL Jammu and Kashmir Khellani-Khanabal Pkg 3 12.87 398.51 Under Implementation
81 151692 NHIDCL Jammu and Kashmir Khellani-Khanabal (Donipawa -Ashajipora- Khudwani) PKG 7 8.47 260.4 Under Implementation
82 151693 NHIDCL Jammu and Kashmir Khellani-Khanabal Pkg 5 15.5 497.09 Under Implementation
83 152003 NHIDCL Jammu and Kashmir Khellani-Khanabal Pkg 4 16.75 859.67 Under Implementation
84 152091 NHIDCL Jammu and Kashmir Khellani-Khanabal Pkg 2 14.84 512.43 Under Implementation
85 60077 NHIDCL Manipur Barak and Makru Bridge 2 141.14 Under Implementation
86 66770 NHIDCL Manipur Imphal - Moreh (Pkg-I) 4-Lane 20 761.54 Under Implementation
87 66774 NHIDCL Manipur Construction of Moreh-Bypass 2.52 68.14 Under Implementation
88 148456 NHIDCL Manipur Tamenglong-Khongsang road 37.97 471.04 Under Implementation
89 149277 NHIDCL Manipur Churachandpur to Tuivai Package-2A 15.75 232.99 Under Implementation
90 149279 NHIDCL Manipur Churachandpur to Tuivai Package-4A 11.15 204.12 Under Implementation
Churachandpur to Tuivai section Km 13.747 to Km 32.835
91 149280 NHIDCL Manipur 19.09 241.52 Under Implementation
PKG 1B
92 149281 NHIDCL Manipur Churachandpur to Tuivai Package 1A 13.75 167.95 Under Implementation
Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900
93 149283 NHIDCL Manipur 16.9 237.39 Under Implementation
(length 16.900km) Pkg 1
Yaingangpokpi-Finch Corner Section from km 16.900 to
94 149292 NHIDCL Manipur 14.07 241.42 Under Implementation
30.970 (length 14.070km) Pkg 2
Pallel Chandel section from Km 0.000 to Km 18.292 of NH-
95 149356 NHIDCL Manipur 18.29 107.72 Under Implementation
102C
96 150563 NHIDCL Manipur Churachandpur to Tuivai 2B 21.88 365.53 Under Implementation
97 150565 NHIDCL Manipur Churachandpur to Tuivai 4B 11.03 177.76 Under Implementation
98 150572 NHIDCL Manipur Senapati imphal Pkg 4A 12.44 379.39 Under Implementation
99 151706 NHIDCL Manipur Senapati imphal Pkg 5B (Sekmai to Nilkhuthi section) 11.02 211.7 Under Implementation
100 151269 NHIDCL Manipur 4-lane Irang Bridge 0.13 49.31 Under Implementation
101 151444 NHIDCL Manipur Maram -Peren (Package-1A) 22.34 226.32 Under Implementation
102 151445 NHIDCL Manipur Maram -Peren (Package-1B) 17.66 188.36 Under Implementation
103 151446 NHIDCL Manipur Maram -Peren (Package-2A) 16.84 204.58 Under Implementation
104 151447 NHIDCL Manipur Maram -Peren (Package-2B) 18.16 232.26 Under Implementation
105 151638 NHIDCL Manipur Imphal-Moreh (Pkg-IV) 19.41 342.66 Under Implementation
106 151639 NHIDCL Manipur Imphal-Moreh (Pkg-III) 10.32 182.18 Under Implementation
107 151640 NHIDCL Manipur Tamenglong to Mahur (PKG-1) 10 185.8 Under Implementation
108 151641 NHIDCL Manipur Tamenglong to Mahur (PKG-4) 10.7 198.77 Under Implementation
109 151707 NHIDCL Manipur Tamenglong to Mahur (PKG-3) 12.05 234.08 Under Implementation
110 151709 NHIDCL Manipur Imphal - Khongsang - Jiribam Pkg-1 12.67 139.38 Under Implementation
111 151710 NHIDCL Manipur Imphal - Khongsang - Jiribam Pkg-2 17.18 195.14 Under Implementation
112 152087 NHIDCL Manipur Tamenglong to Mahur (PKG-2) 21.43 483.87 Under Implementation
113 152088 NHIDCL Manipur Churachandpur to Tuivai Pkg 3 51.89 673.27 Under Implementation
114 152089 NHIDCL Manipur Imphal - Khongsang - Jiribam Pkg-3 33.16 467 Under Implementation
115 152293 NHIDCL Manipur Tamenglong to Mahur (PKG-5) 26.45 477.86 Under Implementation
116 152328 NHIDCL Manipur Tamenglong to Mahur (PKG-6) (Haflong) 16.24 311.18 Under Implementation
117 152454 NHIDCL Manipur Ukhrul - Toloi - Tadubi (PKG- 3) 31.02 315.56 Awarded, not Appointed
118 152292 NHIDCL Manipur Imphal - Khongsang - Jiribam Pkg-4 35.17 579.63 Awarded, not Appointed
119 152294 NHIDCL Manipur Maram - Peren (PKG-3) 34.49 467.41 Awarded, not Appointed
120 152295 NHIDCL Manipur Ukhrul - Toloi - Tadubi (PKG- 4) 23.96 310.76 Awarded, not Appointed
121 153048 NHIDCL Manipur Khongsang- Jiribam Pkg-5 30 410.68 Awarded, not Appointed
122 153148 NHIDCL Manipur Khongsang- Jiribam Pkg-6 38.29 504.76 Awarded, not Appointed
123 153460 NHIDCL Manipur Akhegwo- Jessami (Akash Bridge to Jessami) Pkg.2 14.72 152.11 Awarded, not Appointed
124 80717 NHIDCL Meghalaya Tura-Dalu 51.5 598.55 Under Implementation
125 91260 NHIDCL Meghalaya Ranikor - Maheshkhola - Baghmara (RMB) Pkg-1 33.25 352.6 Under Implementation
Ranikor - Maheshkhola - Baghmara (RMB) Pkg-4 (Kanai to
126 150842 NHIDCL Meghalaya 14.76 157.86 Under Implementation
Rongra)
Ranikor - Maheshkhola - Baghmara (RMB) Pkg-5 (Rongra to
127 150843 NHIDCL Meghalaya 16.3 146.88 Under Implementation
Panda)
128 151230 NHIDCL Meghalaya 2-L/ 4-L of Shillong-Dawki (Pkg-1) 11.6 351.12 Under Implementation
129 151231 NHIDCL Meghalaya 2-L of Shillong-Dawki (Pkg-2) 26.55 525.68 Under Implementation
130 151232 NHIDCL Meghalaya 2-L of Shillong-Dawki (Pkg-4) 17.77 445.51 Under Implementation
131 151233 NHIDCL Meghalaya 2-L/ 4-L of Shillong-Dawki (Pkg-5) 7.99 284.21 Under Implementation
132 151711 NHIDCL Meghalaya Ranikor - Maheshkhola - Baghmara (RMB) Pkg-3 25 260.21 Under Implementation
133 152814 NHIDCL Meghalaya Nongstoin-Rambrai-Kyrshai (NRK) Pkg-1 33.7 359.86 Under Implementation
Ranikor - Maheshkhola - Baghmara (RMB) Pkg-6 (Panda to
134 152812 NHIDCL Meghalaya 17.09 144.99 Awarded, not Appointed
Baghmara)
135 152966 NHIDCL Meghalaya Ranikor - Maheshkhola - Baghmara (RMB) Pkg-2 25.53 283.5 Awarded, not Appointed
136 60091 NHIDCL Mizoram Aizwal-Tuipang (Pkg-III) 39.99 760.8 Under Implementation
137 60092 NHIDCL Mizoram Aizwal-Tuipang (pkg-II) 50.94 957.34 Under Implementation
138 63336 NHIDCL Mizoram Aizwal-Tuipang (Pkg-IV) 42.83 787.5 Under Implementation
139 63337 NHIDCL Mizoram Aizwal-Tuipang (Pkg-V) 34.58 690.24 Under Implementation
140 63338 NHIDCL Mizoram Aizwal-Tuipang (Pkg-VI) 45.46 768.76 Under Implementation
141 63340 NHIDCL Mizoram Aizwal-Tuipang (Pkg-VIII) 39.94 637.06 Under Implementation
Seling-Keifang section from Km 0 to Km 15 (Seling-Dulte)
142 149294 NHIDCL Mizoram 13.51 206.9 Under Implementation
Pkg-I
Keifang section from Km 15.00 to Km 30.050 (Seling-Dulte)
143 149295 NHIDCL Mizoram 13.89 216.49 Under Implementation
(Pkg II)
Keifang-Rulchawm section Km 30.050 to Km 50.360 (Seling-
144 149296 NHIDCL Mizoram 17.64 292.23 Under Implementation
Dulte) Pkg III
Rulchawm-Dulte from Km 50.360 to Km 69.015 (Seling-
145 149297 NHIDCL Mizoram 17.16 281.77 Under Implementation
Dulte) Pkg IV
146 149925 NHIDCL Mizoram Aizwal-Tuipang (Pkg-I) 57 960.1 Under Implementation
147 150754 NHIDCL Mizoram Aizwal-Tuipang (Pkg- VII) 39.12 605.76 Under Implementation
148 150867 NHIDCL Mizoram Hnathial Bypass (Pkg-2) on Aizawl Tuipang section of NH 54 7 113.58 Under Implementation
Chhiathlang -Serchhip Bypass (Pkg-1) on Aizawl-Tuipang
149 150901 NHIDCL Mizoram 14.4 275.03 Under Implementation
section NH-54
150 151025 NHIDCL Mizoram 2-Laning of Lawngtlai Bypass (Pkg-3) on Aizawl-Tuipang 2.73 58.84 Under Implementation
151 151698 NHIDCL Mizoram Tlabung lunglei PKG A 37.42 698.45 Under Implementation
152 151699 NHIDCL Mizoram Tlabung - Lunglei PKG-B 37.53 740.58 Under Implementation
153 151700 NHIDCL Mizoram Dulte- Kwalkulh - Champai Ch 54.400 to 72.350 Pkg 1 17.95 374.39 Under Implementation
154 151701 NHIDCL Mizoram Dulte- Kwalkulh - Champai Ch 72.350 to 84.800 Pkg 2 12.45 233.25 Under Implementation
155 151702 NHIDCL Mizoram Dulte- Kwalkulh - Champai Ch 84.800 to 111.580 Pkg 3 26.8 674.71 Under Implementation
156 152296 NHIDCL Mizoram Keifang - Tuivai (PKG-1) 31.28 492.94 Under Implementation
157 152297 NHIDCL Mizoram Keifang - Tuivai (PKG-2) 36.89 523.78 Awarded, not Appointed
158 152818 NHIDCL Mizoram Vairengte - Sairang Pkg-3 14.85 491.39 Awarded, not Appointed
159 152819 NHIDCL Mizoram Vairengte - Sairang Pkg-4 16.5 561.91 Awarded, not Appointed
160 153022 NHIDCL Mizoram Keifang- Tuival Pkg-3 30.41 500.88 Awarded, not Appointed
161 153039 NHIDCL Mizoram Vairengte - Sairang Pkg-5 18 720.4 Awarded, not Appointed
162 153040 NHIDCL Mizoram Vairengte - Sairang Pkg-6 16.35 595.65 Awarded, not Appointed
163 60094 NHIDCL Nagaland Dimapur â€“ Kohima (Pkg-I) 14.94 489 Under Implementation
164 60095 NHIDCL Nagaland Dimapur â€“ Kohima (Pkg-II) 13.71 519.7 Under Implementation
165 60097 NHIDCL Nagaland Dimapur Bypass (Nagaland Portion) 20.68 645 Under Implementation
166 63745 NHIDCL Nagaland Dimapur Bypass (Assam Portion) 14.33 511.02 Under Implementation
167 122646 NHIDCL Nagaland Chakabama-Zunheboto PKG-1) 25 340 Under Implementation
168 122647 NHIDCL Nagaland Chakabama-Zunheboto (PKG-2) 25 239 Under Implementation
169 122648 NHIDCL Nagaland Chakabama-Zunheboto (PKG-3) 25 286 Under Implementation
170 122649 NHIDCL Nagaland Chakabama-Zunheboto (PKG-4) 20 315.03 Under Implementation
171 122650 NHIDCL Nagaland Chakabama-Zunheboto (PKG-5) 20.53 255.58 Under Implementation
172 122651 NHIDCL Nagaland Merangkong-Tamlu-Mon (MTM) (PKG-1) 20 215 Under Implementation
173 122653 NHIDCL Nagaland Merangkong-Tamlu-Mon (MTM) Road (PKG-2) 20 216 Under Implementation
174 122654 NHIDCL Nagaland Merangkong-Tamlu-Mon (MTM ) Road (PKG-3) 19 273 Under Implementation
175 122656 NHIDCL Nagaland Pfutsero-Phek (PP) (PKG-1) 20 237.72 Under Implementation
176 122657 NHIDCL Nagaland Pfutsero-Phek (PP) (PKG-2) 20 251.97 Under Implementation
177 122658 NHIDCL Nagaland Pfutsero-Phek (PP) (PKG-3) 22.56 282.97 Under Implementation
178 149309 NHIDCL Nagaland Kohima-Jessami Road (Pkg- 1) 21.72 320.97 Under Implementation
179 149310 NHIDCL Nagaland Kohima-Jessami Road (Pkg- 2) 21.9 355.99 Under Implementation
180 149347 NHIDCL Nagaland Kohima-Jessami Road (Pkg- 3) 22.7 361.73 Under Implementation
181 149363 NHIDCL Nagaland Changtongya to Longleng Road (Pkg- 1) 18.78 278.95 Under Implementation
182 149364 NHIDCL Nagaland Changtongya to Longleng Road (Pkg- 2) 14.65 206.53 Under Implementation
183 149525 NHIDCL Nagaland Wokha-Merapani (Package 1) 26 51.61 Under Implementation
184 149526 NHIDCL Nagaland Wokha-Merapani (Package 2) 22 47.91 Under Implementation
185 149527 NHIDCL Nagaland Wokha-Merapani (Package 3) 12.59 51.5 Under Implementation
186 149927 NHIDCL Nagaland Kohima-Jessami Road (Pkg- 4) 21.5 330.79 Under Implementation
187 149928 NHIDCL Nagaland Kohima-Jessami Road (Pkg- 5) 21.5 330.8 Under Implementation
188 150841 NHIDCL Nagaland Kohima to Mao from km 185.540 to km 211.709 26.25 315.63 Under Implementation
189 150878 NHIDCL Nagaland Kohima-Bypass Road Package- 2 10.5 277.44 Under Implementation
190 150880 NHIDCL Nagaland Kohima-Bypass Road Package- 4 11.45 202.36 Under Implementation
191 150988 NHIDCL Nagaland Peren-Dimapur Pkg-1 17.28 257.15 Under Implementation
192 151391 NHIDCL Nagaland Peren-Dimapur Pkg-2 19.67 258.52 Under Implementation
Merangkong-Tamlu-Mon (MTM) Road(PKG-5) Wakching
193 151712 NHIDCL Nagaland 13.45 161.73 Under Implementation
Town
Construction of Balance work of Dimapur â€“ Kohima (Pkg-
194 152130 NHIDCL Nagaland 14.21 562.98 Under Implementation
III)
Construction of Balance work of Merangkong-Tamlu-Mon
195 153255 NHIDCL Nagaland 23.03 0 Under Implementation
(MTM) Road(PKG-4)
196 151597 NHIDCL Nagaland Peren - Dimapur Pkg - 4 10.25 116.54 Awarded, not Appointed
197 151437 NHIDCL Nagaland Peren-Dimapur Pkg-3 17.38 177.77 Awarded, not Appointed
198 151438 NHIDCL Nagaland Peren-Dimapur Pkg-5 17 207.33 Awarded, not Appointed
199 153084 NHIDCL Nagaland Akhegwo- Jessami (Akhegwo to Akash Bridge) Pkg.1 42.44 605.36 Awarded, not Appointed
200 60101 NHIDCL Sikkim Alternate Highway from Rhenok-Pakyong 26.71 549.97 Completed
201 60102 NHIDCL Sikkim Rangpo viaduct 1.12 180.43 Under Implementation
202 60105 NHIDCL Sikkim Tarku - Ravangla 16.5 368.65 Under Implementation
203 66754 NHIDCL Sikkim Ranipool-Pakyong 16 275.26 Under Implementation
204 66756 NHIDCL Sikkim Chisopani Traffic tunnel 0.42 35.69 Under Implementation
205 145870 NHIDCL Sikkim Bagrakot-Kafer (Package - IVA) 13 431.19 Under Implementation
206 147008 NHIDCL Sikkim Singtam-Tarku 16 375.8 Under Implementation
207 148751 NHIDCL Sikkim Chuba Khola Bridge 0.48 8.93 Under Implementation
2-laning Bagrakot-Kafer from Km. 26.100 to Km. 40.000
208 149354 NHIDCL Sikkim 13.9 242.97 Under Implementation
(Pkg IV-D)
Tunnel (300m) at Rabangla (Pkg- III) (Design Ch.: 32.500 km
209 150788 NHIDCL Sikkim 1.1 79.21 Under Implementation
to 33.600 km
start of Rabangla to Gylashing km 33.600 to km 58.540 (Pkg-
210 150789 NHIDCL Sikkim 25.24 292.8 Under Implementation
IV)
211 150790 NHIDCL Sikkim Legship - Gyalshing from km58.840 to km75.00 (Pkg- V) 16.16 262.84 Under Implementation
212 150791 NHIDCL Sikkim Legship - Gyalshing from km75.00 to km 90.210 (Pkg- VI) 15.21 183.31 Under Implementation
213 150915 NHIDCL Sikkim Bagrakot-Kafer ( Pkg IV-B) 12.6 295.97 Under Implementation
214 150916 NHIDCL Sikkim Kafer- Lava More (Pkg-VA) 21.1 311.02 Under Implementation
215 150917 NHIDCL Sikkim Lava More Pedong bypass to Reshi Border (Pkg-VB) 16.55 345.38 Under Implementation
216 151060 NHIDCL Sikkim Rishi Border- Rolep- Menla (Pkg-2B) 10.4 230.45 Under Implementation
217 151061 NHIDCL Sikkim Rishi Border -Rolep- Menla (Pkg-2C) 14.4 493.42 Under Implementation
218 151063 NHIDCL Sikkim Rishi Border -Chochenpheri - Rolep- Menla (Pkg- 3A) 30 816.79 Under Implementation
219 151347 NHIDCL Sikkim Rishi Border -Rhenok- Menla (Pkg- 3B) 12.03 410.6 Under Implementation
220 151402 NHIDCL Sikkim Rishi Border- Rolep- Menla (Pkg-2A) 7.31 332.28 Under Implementation
Realignment - CH: 0.00 (Km 77.800 of NH-10) to CH:2.00
221 151436 NHIDCL Sikkim 2 76.67 Under Implementation
(Km 3.100 of NH-717A) Including Major Bridge of 680 m
222 151855 NHIDCL Sikkim Algaraha Bypass junction to start of Pedong Bypass 3.35 0 Under Implementation
Balance Work of Ranipool to Pakyong from km 2.000 to km
223 152132 NHIDCL Sikkim 14.17 275.26 Under Implementation
16.167
224 60107 NHIDCL Tripura Agartala-Udaipur from Km 6.800 to km 55.00 48.2 770.83 Under Implementation
225 63065 NHIDCL Tripura Feni Bridge 1.89 128.69 Under Implementation
226 149267 NHIDCL Tripura Agartala â€“ Khowai on NH 108 B Package-I 12.8 165.55 Under Implementation
227 149273 NHIDCL Tripura Kailashahar Kurti Bridge Package-I 11.8 154.51 Under Implementation
Widening of Khayerpur -Amtali (Agartala Bypass) Section
228 149305 NHIDCL Tripura 12.9 147.06 Under Implementation
from km 0.00 to km 12.900 of NH-8
229 149368 NHIDCL Tripura Jolaibari Belonia (from km 0.000 to km 21.412) of NH-108A 21.41 201.99 Under Implementation
Kailashahar â€“ Kurti Bridge from km 11.800 to km 25.250
230 149759 NHIDCL Tripura 13.45 178.44 Under Implementation
Pkg-II
231 150534 NHIDCL Tripura Kailashahar-Kurti Bridge section (Package-III) 11.21 140.56 Under Implementation
Manu- Lalchara section from km 0.00 to km 16.290 (Manu-
232 150640 NHIDCL Tripura 16.29 247.76 Under Implementation
Simlung -I)
Kanchanpur- Vaghmun section from km 46.597 to km
233 150642 NHIDCL Tripura 20.24 347.36 Under Implementation
66.845 (Manu-Simlung-III)
234 150648 NHIDCL Tripura Kailashahar to Kumarghat 18.6 277.5 Under Implementation
235 150808 NHIDCL Tripura Agartala-Khowai section km 31.300 to km 45.300 (PKG-III) 14 173.17 Under Implementation

236 151212 NHIDCL Tripura Construction of 2 RCC Bridges on river Gomati and Muhuri 1.8 86.53 Under Implementation


237 151213 NHIDCL Tripura Kailashahar to Khowai PKG-1 8.1 99.48 Under Implementation
238 151214 NHIDCL Tripura Kailashahar to Khowai PKG-2 20 206.78 Under Implementation
239 151215 NHIDCL Tripura Kailashahar to Khowai PKG-3 14.5 280.91 Under Implementation
240 151216 NHIDCL Tripura Kailashahar to Khowai PKG-4 12 159.13 Under Implementation
241 151217 NHIDCL Tripura Kailashahar to Khowai PKG-5 25.6 332.14 Under Implementation
242 151575 NHIDCL Tripura Agartala - Khowai (package-II) Re-awarded 12 141.48 Under Implementation
243 151713 NHIDCL Tripura 2-laning from Manu-Simlung ( Pkg IV) 18.3 354.79 Under Implementation
Lalchara- Kanchanpur section from km 16.077 to km 43.935
244 153005 NHIDCL Tripura 27.86 456.88 Awarded, not Appointed
(Manu-Simlung -II)
245 151458 NHIDCL UT Ladakh Kargil- Zanskar Road (Pkg-4) 11.52 80.92 Under Implementation
246 151459 NHIDCL UT Ladakh Kargil- Zanskar Road (Pkg- 5) 18.65 169.79 Under Implementation
247 151460 NHIDCL UT Ladakh Kargil- Zanskar Road (Pkg-6) 31.14 239.81 Under Implementation
248 151461 NHIDCL UT Ladakh Kargil-Zanskar Road (Pkg-7) 47.93 308.86 Under Implementation
249 151694 NHIDCL UT Ladakh Kargil - Zanskar Road Pkg-1 30.04 384.24 Under Implementation
250 151695 NHIDCL UT Ladakh Kargil - Zanskar Road Pkg-2 26.96 404.89 Under Implementation
251 151696 NHIDCL UT Ladakh Kargil - Zanskar Road Pkg-3 30 381.01 Under Implementation
252 151697 NHIDCL UT Ladakh Kargil - Zanskar Road Pkg-8 33.77 398.37 Under Implementation
253 60113 NHIDCL Uttarakhand Slope Protection work at Bareti landslide 0.75 40.89 Under Implementation
254 68016 NHIDCL Uttarakhand Silkyara Tunnel 4.86 1383.78 Under Implementation
255 102034 NHIDCL Uttarakhand Rudraprayag to Joshimath Package-I 29.13 274.31 Under Implementation
256 102035 NHIDCL Uttarakhand Rudraprayag to Joshimath Package-II 28.8 403.36 Under Implementation
257 102036 NHIDCL Uttarakhand Rudraprayag to Joshimath Package-III 36.67 417.24 Under Implementation
Construction of proposed 4-lane ROB and its approaches in
lieu of existing Level Crossing No.23/SPL class at Km 3.6 on
258 52004 Roads Wing Andhra Pradesh NH-18 between Chittoor & RVS Nagar railway stations on 1 109.03 Completed
Chittoor - Pakala Railway section in the state of Andhra
Pradesh on EPC
Rehabilitation and up-gradation of NH-544E from Km 0/00
to Km 56/803 (Design Ch. 0/00 to 56/803) (Kodikonda
259 67828 Roads Wing Andhra Pradesh Junction to Madakasira section) to two lane with paved 57 504.19 Completed
shoulder in the State of Andhra Pradesh under NH(O) on
EPC mode
Construction of Proposed 4-Lane ROB and its approaches in
lien of existing level crossing No. 75 @ Km 145.200( Railway
260 139239 Roads Wing Andhra Pradesh 1.43 68.48 Completed
Chainage 121/470) on NH 205 in the State of A.P. Job No.
NH-205 /AP(4)/17-S&R(B)020 dt 07-07-2017
Rehabilitation and upgradation from two to four lane from
261 150184 Roads Wing Andhra Pradesh 5.4 96.63 Under Implementation
Km 0 to 5/4 of Anantapur-Guntur road
Construction of 4-Lane Fly-Over at Km 742/600 at
262 150185 Roads Wing Andhra Pradesh 0.81 41.88 Under Implementation
Muthukur Road Junction) in Nellore District
Rehablitation and Strengthening of NH 516 D from Km
263 150188 Roads Wing Andhra Pradesh 20 117.46 Under Implementation
0.000 to 20.000 Devarapalli - Jeelugumilli road
264 150197 Roads Wing Andhra Pradesh Construction of Saluru Bypass 5.79 70.81 Under Implementation
"CONSTRUCTION OF 2 LANE ROB & APPROACHES IN LIEU
OF L.C.NO.104E/SPL3 AT KM.97/06-07 BETWEEN
CHERUKUWADA AND UNDI RAILWAY STATIONS ON
265 150297 Roads Wing Andhra Pradesh 1.35 90.99 Under Implementation
GUDIVADA - BHIMAVARAM RAILWAY SECTION AT N.H.
KM.170+400 ON N.H.214 (NEW NH-165) IN WEST
GODAVARI DISTRICT, IN THE STATE OF ANDHRA PRADESH "
Approaches to 2L ROB of LC No. RV324 @ KM436/12-13 on
266 150453 Roads Wing Andhra Pradesh 0.98 37.22 Under Implementation
NH43 (Manapuram)
Widening to two lane with paved shoulders from Km
267 150556 Roads Wing Andhra Pradesh 42.38 220.66 Under Implementation
57/700 to 103/200 (Madakasira to A.P/Karnataka Border)
Widening to two lane with paved shoulders from Km
268 150589 Roads Wing Andhra Pradesh 63/540 to Km 74/165 (Polekuru - Komaragiri) section of NH- 10 86.27 Under Implementation
216
Rehabilitation and Upgradation of NH-219 from km.58/600
to 140/680 (Palamaneru to Krishnagiri Border Section) to
269 52015 Roads Wing Andhra Pradesh 81.44 271.45 Under Implementation
two lane with paved shoulders in the State of AP under
Corridor Aproach on EPC mode
Rehabilitation & Upgradation of NH214(New NH-216) from
Km 34/230 to Km 84/550 (Losari to Machavaram Section) to
270 52023 Roads Wing Andhra Pradesh two lane with paved shoulder in the state of 49 445.22 Under Implementation
Andhrapradesh under NHDP-IV through Engineering,
Procurement& Construction (EPC) mode.
Rehabilitation and Up-gradation of Dhindi - Digamarru
section from Km 126/510 to Km 135/740 of NH -214(New
271 52025 Roads Wing Andhra Pradesh NH -216) and digamarru -Losari section from Km 0/000 tp 42 316.06 Under Implementation
Km 34/230 of NH-214 A(New Nh-216) to two lane with
paved shoulder in the state of AP-NH
Rehabilitation and up-gradation of Karnataka/Andhra
Border to Gooty section from Km.368/920 to Km. 424/225
272 52028 Roads Wing Andhra Pradesh 57.29 995.09 Under Implementation
of NH-67 to four lane with paved shoulder in the state of
Andhra Pradesh under NHDP-IV on EPC basis
Rehabilitation and upgradation of Gurajanapalli village -
Polekuru village section (from km.41/161 to 59/800) and
273 52029 Roads Wing Andhra Pradesh Komaragigi-pasarlapudi section (km 70/400 to 105/170) of 50.38 422.52 Under Implementation
NH-214 (new NH-216) to two lane with paved shoulder in
the state of Andhra Prad
Rehabilitation and up-gradation of NH-42 from km 244/930
to km 299/775 (Madanapalli-Punganuru-Palamaneru
274 60247 Roads Wing Andhra Pradesh 54.84 372.68 Under Implementation
Section) to two lane with paved shoulder in the state of
Andhra Pradesh under Corridor Scheme on EPC Mode

Rehabilitation and up-gradation of NH-340 from km 0+000
to km 60+380 (Design Ch. 0/000 to 60/025) (Rayachoty to
275 60530 Roads Wing Andhra Pradesh Angallu section) to two lane with paved shoulders in the 58 319.28 Under Implementation
State of Andhra Pradesh under Corridor Approach through
Engineering, Procurement & Con

Rehabilitation and up-gradation of NH-167 from Km 14/900
to Km70/000 (Design Ch. 14/900 to 69/700) (Chintakunta to
276 60527 Roads Wing Andhra Pradesh Adoni section) to two lane with paved shoulders in the 54.8 290.15 Under Implementation
State of Andhra Pradesh under Corridor Approach through
Engineering, Procurement & Co
Rehabilitation and up-gradation of NH-75(Old NH-234) from
Km 506/100 to Km 508/700 and Km 518/700 to Km
534/350 (Design Ch. Km 506/100 to 508/650 and 518/700
277 60529 Roads Wing Andhra Pradesh 18 147.66 Under Implementation
to 534/100) Mangalore to Thiruvannamalai Road to two
lane with paved shoulders in the State of Andhra Pradesh
on EPC mode
Widening to two lane with paved shoulders of Bowdara -
278 151069 Roads Wing Andhra Pradesh 26.94 127.91 Under Implementation
Vizianagaram section of NH 516E
Two laning with paved shoulders of Paderu to
279 151070 Roads Wing Andhra Pradesh 25.08 222.61 Under Implementation
GundigudaSection of NH 516E
Two laning with paved shoulders of Gondiguda to Araku
280 151071 Roads Wing Andhra Pradesh 24.29 296.66 Under Implementation
(uptoBhallaguda) section of NH 516E
Widening and strengthening of two lane with paved
shoulder to 4-lane road from Kadapa to Airport road in Km
281 151377 Roads Wing Andhra Pradesh 5.9 34.13 Under Implementation
137/6 to Km 140/6 and Yerranguntla town from Km 168/1
to Km 171/0 of Renigunta â€“ Kadapa road of NH-716
Widening and strengthening to two lane with paved
282 151378 Roads Wing Andhra Pradesh 32.03 116.44 Under Implementation
shoulders from Km 491/000 to Km 525/200 of NH-26.
283 151775 Roads Wing Andhra Pradesh Construction of Kadiri Bypass on NH-42 12.57 220.66 Under Implementation
Widening to two lane with paved shoulders from Km 0/0 to
284 151969 Roads Wing Andhra Pradesh 60.45 529.54 Under Implementation
64/020 (Pamarru to Akiveedu)
Rehabilitation and Up-gradation of Thimmapuram to
Gurajanapalli section from Km 26/150 to Km 41/161 of NH -
285 64831 Roads Wing Andhra Pradesh 19 350.61 Under Implementation
214 ( New NH - 216) to two lane with paved shoulder in the
state of Andhra Pradesh under NHDP-IV
Rehabilittion and upgradation of Machilipatnam to
Avanigadda section from km 84/550 - 124/200 of NH 214A
286 64834 Roads Wing Andhra Pradesh 34 376.25 Under Implementation
(new NH 216) to two lane with paved shoulder in the State
of AP under NHDPIV through EPC basis
Rehabilitation and Up-gradation of Pasarlapudi to Dhindi
section from Km 105/170 to Km 126/510 of NH -214 (New
287 64835 Roads Wing Andhra Pradesh 20.82 263.45 Under Implementation
NH -216) to two lane with paved shoulder in the state of
Andhra Pradesh under NHDP-IV
Rehabilitation and upgradation of Repalle to Eeppurpalem
section from Km 129/927 to Km 195/000 of NH-214A (New
288 64836 Roads Wing Andhra Pradesh 62 576.48 Under Implementation
NH-216) to two lane with paved shoulder under NHDP-IV
on EPC basis
Widening & Strengthening of 2/4 lane to 4 lane carriageway
from Km 6/0 to 15/0 of Kurnool Guntur road(NH-340C) in
289 152174 Roads Wing Andhra Pradesh 9.01 96.15 Under Implementation
Kurnool District in the State of Andhra Pradesh through EPC
mode
Widening & Strengthening from Km 93/400 to 95/410 of
Madanapalle - Naidupeta road of NH-71 to two lane with
290 152175 Roads Wing Andhra Pradesh 2 11.57 Under Implementation
paved shoulder in the State of Andhra Pradesh on EPC
mode
Widening the Urban Link of NH-42 from Km 0+000 to Km
9+200 in the Anantapur town in the State of Andhra
291 152421 Roads Wing Andhra Pradesh 9.2 311.93 Under Implementation
Pradesh through EPC mode of contract under NH (O)
(Length-9.200 Kms)
Construction of 4-lane bypass to Vijayanagaram Town from
292 67833 Roads Wing Andhra Pradesh 17 429.43 Under Implementation
537/6 to 552/0 (Raipur- Vijayanagaram section)
Rehabilitation and upgradation of Dornala T junction to
293 68031 Roads Wing Andhra Pradesh Penchalakona Km 361/327 to 425/4 of Nh-565 in the state 42.31 418.03 Under Implementation
of Andhra Pradesh.
Rehabilitation and upgradation of NH 326A from km 0/0 to
41/979 (excluding km 2/255 to 3/372 and km 36/820 to
294 91702 Roads Wing Andhra Pradesh 38/275) (Odisha border to Narasamapeta) to two lane with 39 228.32 Under Implementation
paved Shoulders in the State of Andhra Pradesh under
NH(O) on EPC Mode
Widening and Strengthening to 2 Lane with Paved shoulder
from Intermediate lane of NH-516E from Km.16/000 to
295 152528 Roads Wing Andhra Pradesh Km.28/800 (except Km.18/400 to Km.20/000) of 11.2 31.32 Under Implementation
Rajamahendravaram to Rampachodavaram in the state of
Andhra Pradesh on EPC mode
Rehabilitation and upgradation of New NH 544DD from
296 123729 Roads Wing Andhra Pradesh design Chainage Km. 56/000 to 102/20 of Kalyandrg - 46 289.67 Under Implementation
Molakalmuru Section
Construction ofProposed 4-Lane ROBand its approaches in
lieu of existing level crossing No. 95/SPL @ Km 272.600(
297 124078 Roads Wing Andhra Pradesh 3 87.66 Under Implementation
Railway Chainage 93/17-19) on NH 205 in the State of A.P.
Job No. NH-205 /AP(36)/17-S&R(B)018 dt 07-07-2017

Construction of 2-Lane ROB and subway in lien of level
crossing No. 88 at Railway km 136/5-6 between
298 124082 Roads Wing Andhra Pradesh Kurbalakota & Madanapalli Section on Dharmavaram- 1 43.32 Under Implementation
Pakala Section at km 56/100 of NH-340 on EPC mode in the
State of A.P. Job No. NH-340 -AP17-18 -669 dt 28-03-2018.
Construction of 2-Lane ROB and its approaches in lien of
level crossing No. 31 @ Km 2.100 (Railway chainage 33/900-
299 124085 Roads Wing Andhra Pradesh 1 54.38 Under Implementation
1000) on NH-326A on EPC mode in the State of A.P.Job No.
NH-326 A -AP-17-18 -670 dt 28-03-2018.
Construction of 2-Lane ROB and its approaches in lien of
level crossing No.414 @ Km 33.100 (Railway chainage
300 124086 Roads Wing Andhra Pradesh 1 54.71 Under Implementation
730/11-13) on NH-326A on EPC mode in the State of A.P.
Job No. NH-326A-AP17-18 -671 dt 28-03-2018.
Construction of 4-Lane ROB and its approaches in lien of
existing level crossing No.124E/SPL 3@ Km 1.800( New
301 137315 Roads Wing Andhra Pradesh 1.55 73.92 Under Implementation
Chainage km 77.805 on NH 205 in the State of A.P. Job No.
NH-205 /AP(2)/15-16-007-S&R(B) dt 14-03-2016
Construction of 4-Lane ROBand its approaches in lien of
existing level crossing No. 102/3E @ Km 281.200 of NH 205
302 137317 Roads Wing Andhra Pradesh 1 133.56 Under Implementation
in the State of A.P. Job No. NH-205 /AP(8)/15-16-010-
S&R(B) dt 31-03-2016
Construction ofProposed 4-Lane ROBand its approaches in
lien of existing level crossing No. 30/E @ Km 64.800(
303 137320 Roads Wing Andhra Pradesh 1.43 56.34 Under Implementation
Railway Chainage 42.858) on NH 205 in the State of A.P. Job
No. NH-205 /AP(1)/16-17-016-S&R(B) dt 31-03-2017
Construction ofProposed 4-Lane ROBand its approaches in
lien of existing level crossing No. 48E/C @ Km 96.80(
304 139237 Roads Wing Andhra Pradesh 2 68.83 Under Implementation
Railway Chainage 74.431) on NH 205 in the State of A.P. Job
No. NH-205 /AP(39)/16-17-012-S&R(B) dt 22-03-2017
Construction ofProposed 4-Lane ROBand its approaches in
lien of existing level crossing No. 45 C @ Km 93.40( Railway
305 139238 Roads Wing Andhra Pradesh 1 60.38 Under Implementation
Chainage 70/903) on NH 205 in the State of A.P. Job No. NH-
205 /AP(3)/17-S&R(B)019 dt 07-07-2017
Construction of Proposed 4-Lane ROB and its approaches in
lien of existing level crossing No. 67 @ Km 133.20( Railway
306 139241 Roads Wing Andhra Pradesh 2 63.79 Under Implementation
Chainage 109/3-4) on NH 205 in the State of A.P. Job No.
NH-205 /AP(38)/16-17-013-S&R(B) dt 24-03-2017
Construction of proposed 4- lane RoB at Railway Chainage
km 44/679 between Puthalapattu -RVS Nagar Station of
307 141388 Roads Wing Andhra Pradesh kathipudi- pakala Section @km 12/4 on NH 18 in the state 2 66.46 Under Implementation
of Andhra Pradesh on EPC Mode [job.no. 18-AP-2018-19-
676 dt:16.01.19
Rehabilitiation and upgradation of Chittoor - Kurnool Road
NH-18 (New NH-40) from 2 lane to 4 Lane from Km 4/14 to
308 144969 Roads Wing Andhra Pradesh 18/34 (excluding 2.94 Km ROB Portion) from Murkumbattu 11 84.55 Under Implementation
Junction to Rangampet cross in the State of Andhra Pradesh
through EPC mode
Construction of 4 Lane ROB and Subway in lien of level
crossing no. 17 @ km 108/1-2 between Jamalamagudu &
309 148635 Roads Wing Andhra Pradesh Proddator Station on Nandyal-Yerraguntla section at km 0.95 63.89 Under Implementation
563/200 of NH-67 EPC mode in the state of A.P. Job No. NH-
67-AP-17-18-672 dt 28-03-2018
"CONSTRUCTION OF 4 LANE ROB & APPROACHES IN LIEU
OF LC NO. 93E/SPL3 AT KM. 84/04-05 BETWEEN AKIVEEDU
AND PALLEVADA STATIONS ON GUDIVADA - BHIMAVARAM
310 150296 Roads Wing Andhra Pradesh 1.68 88.03 Awarded, not Appointed
RAILWAY SECTION AT NH KM. 183+700 ON NH 214 (NEW
NH-165 ) IN KRISHNA DISTRICT, IN THE STATE OF ANDHRA
PRADESH. "
Construction of 4-lane ROB and its approaches between
Gudivada and Nujella railway station on Gudivada -
311 152173 Roads Wing Andhra Pradesh 1.28 90.84 Awarded, not Appointed
Machilipatnam section at Km 10+906 of NH-165 in the State
of Andhra Pradesh
Construction of 4 Lane ROB at Km 510/8 of NH-565 (Near
312 152419 Roads Wing Andhra Pradesh Yerpedu) in Lieu of L.C. No. 36 in the State of Andhra 2.27 98.76 Awarded, not Appointed
Pradesh on EPC mode
Formation of Bypass road to Mudigubba from Km 130/400
to Km 137/500 (Design Ch. 130/392 to 138/141) on NH-42
313 152453 Roads Wing Andhra Pradesh 7.75 116.81 Awarded, not Appointed
of two lane with paved shoulder road in the State of Andhra
Pradesh through EPC mode
Rehabilitation and Up-gradation of NH-565 from Km 86/057
to Km 132/920 Nagarjuna Sagar Dam to Davulapally section
314 152877 Roads Wing Andhra Pradesh 46.86 385.97 Awarded, not Appointed
to Two lane with paved shoulder in the State of Andhra
Pradesh through EPC mode
Rehabilitation and Up-gradation of NH-167B from
km.143/320 (Malakonda) to 189/050 (Singarayakonda) (on
315 153004 Roads Wing Andhra Pradesh 45.73 0 Awarded, not Appointed
NH 16) to two lane with paved shoulders in Andhra Pradesh
through EPC mode of contract
Rehabilitation and Up-gradation from Km 170+700
Bhadrachalam to Km 234+567 Konta on NH-30 to Two lane
316 153077 Roads Wing Andhra Pradesh 63.86 388.7 Awarded, not Appointed
with Paved Shoulder in the State of Andra Pradesh on EPC
mode.
Construction of Two-Lane Major Bridge acroos Penna river
at Km. 739.234 of NH-67 including approaches paralles to
317 153078 Roads Wing Andhra Pradesh 2.68 99.48 Awarded, not Appointed
existing 2 lane bridge in SPS Nellore District in the State of
Andhra Pradesh through EPC contract.
Widening to two lane with paved shoulder including
strengthening of existing 2L+PS and 4 lane stretches of
bypassed stretches of NH 544E of Hindupur and Parigi
318 153083 Roads Wing Andhra Pradesh 20.04 98.16 Awarded, not Appointed
towns Chainage 21 / 640 to Km 41 / 699 under one time
improvement in the state of Andhra Pradesh under NH (O)
for the year 2021-22 on EPC mode
Rehabilitation and Upgradation to 2-lane with paved
shoulders configuration of Koyyuru to Chaprathipalem
section (Km 120+000 to Km 165+500) of NH-516E in the
319 153086 Roads Wing Andhra Pradesh 45.5 349.29 Awarded, not Appointed
State of Andhra Pradesh under Green National Highways
Corridor Project (GNHCP) with the loan assistance of World
Bank on EPC mode
Rehabilitation and Upgradation to 2-lane with paved should
ders Sir, configuration of Chaprathipalem to Lambasingi
section (Km 165+500 to Km 205+000) of NH-516E in the
320 153087 Roads Wing Andhra Pradesh 39.5 311.22 Awarded, not Appointed
State of Andhra Pradesh under Green National Highways
Corridor Project (GNHCP) with the loan assistance of World
Bank on EPC mode
Rehabilitation and Up-gradation of NH-1678 from Km
321 153089 Roads Wing Andhra Pradesh 99.103 (CS Puram) to Km 143.320 (Malakonda) to Two lane 44.22 277.31 Awarded, not Appointed
with Paved Shoulders in Andhra Pradesh
4 lane ROB at km.4/0-4/1 between Gudivada-Nujella station
322 153099 Roads Wing Andhra Pradesh on Gudivada-Machilipatnam section at NH Km. 10+906 on 1.28 90.84 Awarded, not Appointed
Pamarru and Alapadu Bypass road of NH-165
2-lane ROB and its approaches in Lieu of existing LC No.120
323 153101 Roads Wing Andhra Pradesh is at K.M. 56.700 of NH-18 (New NH-40) under Setu 1.4 60.04 Awarded, not Appointed
Bharatam
Construction of 2 lane ROB with approaches in lieu of
324 153102 Roads Wing Andhra Pradesh existing LC No. 119 at km 226/80 of NH 205 (New NH 71) 1.2 66.6 Awarded, not Appointed
under Setu Bharatam
Widening of existing road to 2 lane NH standards along with
improvements and realignments from Nechipu to Hoj, via
325 53016 Roads Wing Arunachal Pradesh Seppa, Khodaso, Sagalee (part of Trans Arunachal Highway) 252.21 2036.9 Completed
in Arunachal Pradesh under SARDP-NE on BOT (Annuity)
mode
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 0.00 to Km 44.35 (Package-1) on EPC Mode in
326 149631 Roads Wing Arunachal Pradesh the State of Arunachal Pradesh under Arunachal Pradesh 44.38 403.68 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/115]

Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 44.35 to Km 77.95 (Package-2) on EPC Mode in
327 149632 Roads Wing Arunachal Pradesh the State of Arunachal Pradesh under Arunachal Pradesh 33.6 342.55 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/115]

Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 77.95 to Km 117.56 (Package-3) on EPC Mode
328 149633 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 39.61 421.48 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/115]

Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 117.56 to Km 163.59 (Package-4) on EPC Mode
329 149634 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 46.03 543.05 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116]

Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 206.66 to Km 247.05 (Package-6) on EPC Mode
330 149666 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 40.39 486.7 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116]

Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 247.05 to Km 284.92 (Package-7) on EPC Mode
331 149667 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 37.87 560.39 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/117]

Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 284.92 to Km 314.25 (Package-8) on EPC Mode
332 149668 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 29.33 347.78 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/117]

Widening of existing road to 2 lane with paved shoulder
333 149892 Roads Wing Arunachal Pradesh from Hukanjuri to Khonsa section of NH-315A from design 9 98.45 Under Implementation
chainage Km 0.00 to 9.00 (Package-A) in the State of Arun
Construction of major bridge including approaches over
Dikrong river at Km 28.750 of NH-713A on EPC mode in the
334 149893 Roads Wing Arunachal Pradesh 0.84 41.86 Under Implementation
State of Arunachal Pradesh [Job No. 713A/Ar. P/2019-
20/024]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 314.25 to Km 351.383 (Package-9) on EPC
335 150367 Roads Wing Arunachal Pradesh Mode in the State of Arunachal Pradesh under Arunachal 37.13 394.27 Under Implementation
Pradesh Package of Roads and Highways of SARDP-NE [Job
No: SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/117]

Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 163.59 to Km 206.66 (Package-5) on EPC Mode
336 150458 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 43.07 450.65 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116]
4-laning of NH-415 from design Chainage 29/500 to 40/400
(Itanagar to Banderdewa section) in the State of Arunachal
337 56991 Roads Wing Arunachal Pradesh 10.9 243.89 Under Implementation
Pradesh under Annual Plan 2016-17 on EPC Mode. Package
– A.
2-laning of Longding– Tissa- Khonsa road (NH-215) on
338 150910 Roads Wing Arunachal Pradesh EPC Mode in the State of Arunachal Pradesh [Job No. 42.5 358.26 Under Implementation
215/Ar. P/2019-20/028]
Widening of existing road to 2 lane with paved shoulder
from Hukanjuri to Khonsa section of NH-315A from design
339 150912 Roads Wing Arunachal Pradesh chainage Km 9.00 to 12.24 (Package-B) in the State of 3.24 41.41 Under Implementation
Arunachal Pradesh on EPC mode. [Job No. 315A/Ar.P/2019-
20/023]
340 150997 Roads Wing Arunachal Pradesh Lalpul-Arunachal Pradesh-Changlang-PKG-1 68.3 588.09 Under Implementation
4-Laning of Itanagar to Bandardewa section of NH-415from
km 40+430 to km 51+735 (Package-B)on EPC Mode in the
341 151280 Roads Wing Arunachal Pradesh 11.31 496.47 Under Implementation
state of Arunachal Pradesh (Job NO. 415/Ar. P/2020-
21/031)
4-Laning of Itanagar to Bandardewa section of NH-415from
342 151361 Roads Wing Arunachal Pradesh km 51+700 to km 59+199 (Package-C)on EPC Mode in the 7.5 437.6 Under Implementation
state of Arunachal Pradesh (Job NO.415/Ar. P/2020-21/030)
Widening of existing road to 2 lane with paved shoulder
from Hukanjuri to Khonsa section of NH-315A from design
343 152414 Roads Wing Arunachal Pradesh chainage Km 12.240 to 26.342 (Package-C) in the State of 14.1 182.55 Under Implementation
Arunachal Pradesh on EPC mode. [Job No. 315A/Ar. P/2020-
21/032]
Construction of minor bridge over Holongi river at Km
344 148163 Roads Wing Arunachal Pradesh 11.800 on Holongi-Itanagar section of NH-415 in the state 0.04 6.81 Under Implementation
of Arunachal Pradesh on EPC Mode.
Widening of existing road to 2 lane with paved shoulder
from Hukanjuri to Khonsa section of NH-315A from design
345 148855 Roads Wing Arunachal Pradesh chainage Km 26.30 to 27.474 (Package-D) in the State of 1.17 16.55 Under Implementation
Arunachal Pradesh on EPC mode. [Job No. 315A/Ar.P/2019-
20/022]
Construction of new Bridge over River krishnai (Br. No.34/1)
346 149532 Roads Wing Assam on NH-37 (New NH-17) in the State of Assam under 0.01 34.62 Under Implementation
EPCMode. (Job.No.017(New)/AS/2019-20/193)
Construction of new Bridge over River Kumatia ( Bridge
347 150618 Roads Wing Assam No.397/1) including subway bridge and approaches on NH- 0.01 43.55 Under Implementation
52 ( New NH No.15) Job No.015/AS/2020-21/211
348 50686 Roads Wing Assam 2 laning from Kanubari to start of Bogibeel Bridge 63.4 268.08 Under Implementation
Construction of 2-lane Highway with paved shoulders
349 50687 Roads Wing Assam 34.85 133.4 Under Implementation
between Dibrugarh - Panitola km 603/0 to 637/0 of NH-37
350 50695 Roads Wing Assam Dhaleshwari Bypass from km. 0.00 - 3.500 3.5 53.15 Under Implementation
Construction of Proposed North Lakhimpur By-pass from
351 50707 Roads Wing Assam existing km 338/924 to km 349/213 of NH-52 in the state of 12.51 127.24 Under Implementation
Assam (Job No.052-AS-2011-12-099)
Construction of Guide Bund and Bridge Protection works of
Bridge No. 338/1 over River Ranganadi and Re-construction
352 150664 Roads Wing Assam of Superstructure of Bridge over River Haijan (Bridge no. 0.01 19.19 Under Implementation
342/1) on NH-15 under NH Nagaon Division in the State of
Assam. (Job No. 015/AS/2019-20/208)
Construction of new bridge over River Dhansiri (Br. No.
82/1) on NH-15 (Old NH-52) under Annual Plan for the year
353 150672 Roads Wing Assam 0.01 40.45 Under Implementation
2019-20 in the State of Assam under EPC mode. (Job No.
015/AS/2019-20/202)
"Balance work for ""Improvement of existing single
intermediate lane road of NH-44 to be 2-lane road with
paved shoulder from km 230/200 to km 247/000, km
261.504 (Ex.ch.260.109) to km 263.191 (Ex.ch.261.761 &
354 150783 Roads Wing Assam 30.28 166.94 Under Implementation
Km 272.241 (Ex.ch.271.00 to km.284.053 (Ex.ch.284.053
(Total Length=30.28km of NH-44 in the state of Assam on
EPC mode"". Job no.SARDP-NE/NH-44/AS/PWD/2010-
11/182"
Construction of New 2-lane major bridge including
approached over Brahmaputra between Majuli on North
Bank and Jorhat on South Bank from Km 11/690 to Km
355 151563 Roads Wing Assam 0.01 925.47 Under Implementation
19/715-Length of bridge 6812.5 m (Package II) on NH-715 K
in the State of Assam on EPC mode. (Job.No.715/AS /2020-
21/213 )
Construction of New Bridge over river Kuthori (Br.No.
356 153389 Roads Wing Assam 352/1) on NH-715 (Old NH-37) in the State of Assam under 0.01 6.87 Under Implementation
EPC mode (Job No. BR.352/1/AS/2021-22/222)
W&S of 2 lane with paved shoulder from km 0.00 to 25.01
357 50615 Roads Wing Bihar 25 84 Completed
of NH-327A under NH(O) on EPC Mode.
W/S to two lane with paved shoulder in km 0.00 to 19.04 of
358 53086 Roads Wing Bihar 19.4 111 Completed
NH-81 in the state of Bihar
Construction of 4-lane ROB of km 119 of NH-30 (Job no. NH-
359 61053 Roads Wing Bihar 1.56 126.6 Completed
30/Bihar (6)/15-16/017-S&R(B))
360 62910 Roads Wing Bihar HL RCC minor bridge in km 24 0.04 6.02 Completed
Strengthening and widening to 2 lane with paved shoulder
361 142226 Roads Wing Bihar 24.44 100.44 Completed
from km 112.00 to 136.440 of NH-327E
362 50590 Roads Wing Bihar Sheohar-Sitamarhi Section km 40.000 to 79.400 km Lot-I 28.5 179 Under Implementation
363 50592 Roads Wing Bihar Sitamarhi-Jaynagar Section km 79.400 to km 156.500 Lot-II 77 370 Under Implementation
364 50593 Roads Wing Bihar Fatuah-Harnaut-Barh Section km 0 to km 69.6 NH-30A 72 683.82 Under Implementation
365 50594 Roads Wing Bihar Birpur â€“ Bihpur Section km 0.0 to Km 106 NH â€“ 106 106 780.77 Under Implementation
366 50595 Roads Wing Bihar Jaynagar-Narahia Section km 156.500 to km 219.945 Lot-III 63.45 553 Under Implementation
Gaya-Hisua-Rajgir-Nalanda-Biharsharif section km0.00 to
367 50597 Roads Wing Bihar 93 1408.85 Under Implementation
92.935 NH-82
368 50599 Roads Wing Bihar Construction of ROB at km 1.10 & km 1.11 of NH-101 1.5 62 Under Implementation
369 50600 Roads Wing Bihar Construction of ROB on NH-81 at Km 31 1.48 53.78 Under Implementation
370 50603 Roads Wing Bihar W&S km 0.00 o 28.00 NH-527A 26.3 99 Under Implementation
371 50604 Roads Wing Bihar Construction of ROB on NH-19 at Km 132 2 99.61 Under Implementation
372 50605 Roads Wing Bihar Construction of ROB on NH-19 at Km 135 0 75.35 Under Implementation
373 50608 Roads Wing Bihar Construction of ROB on NH-103 at Km 12 2.11 192.14 Under Implementation
374 50610 Roads Wing Bihar CONSTRUCTION OF FOUR LANE ROB ON NH-327E AT KM 11 2.4 82.43 Under Implementation
CONSTRUCTION OF TWO LANE ROB ON NH-32 M
375 50611 Roads Wing Bihar
W
M
W

W
W M

M
W
W

W
W
W
W

W M

W
W
W W
W W
W W
M
W
W
W
W
W
W
M
W
W
M

W M

M
W

W
W
W

W
W
M M
M

W
M

M
W

W W

W
W

W
M
W

W M

W
W
W M
W
W
W
W
W
W M
W
W
W
W M
W
W M
W
W

W M

W M

W
M

M
W

W
W

M
W
M

W
W

M M
W

W M W
W
M
W M

W
M

W M

W M
W

W M M
W

M
W

W
W

M
W
M

W
@

W
W

W
M

W
@

M
M
W

M
W M

M
W

M
W

W
W

W
M

W
M
W

W
M
W

W
W
W

W
M

W
W

W
W

W M
W M M

W
W

W
M
W
W

W W

W
W

M
W

W
M

W
M

W
W
W

W
W M

W
W

W
W
W W
W

W
W
W
W

M
W
W
W
W
W

W
W

W
W

W
W M

W
W
W
W
M
W M
W
W
W
W
W
W
M

W
W
M M
W

W
W
W

W
M
W

W
M

W
M

W
W

W
W

W M
W

W
W
W

W
W

M
W

W
W

W
M
W

W M
W
M
W

M M

W
M

W
M

W
W
M

W
M

W
M M

W M

M
W
M
W
W

W
W

M M
W M
M

W M

W M
M

W M

W M

W M
M

W M
W M
W M M
W M M
W M
W M M
W M

W M
M M
M
W M
M

W M
M
M

W M
M M

W M
M M

W W
W M

W M

W M
M

W M

W M
M
M

W M
M

W
W M
W M M
W M

W M M M

W M
W M

M
W M
M
M

W M

M
W
W M

W M

W M
M
M

W M
M
M

W M
M

W M
M
W M
W M
M
W M

W M

W M

W M
M
W M
W W
W M

W M

W M
W M M M M
W M M
W M
W M
W
W M
W
W M
W M
W M
W M
W M M
W M
W M
W M M
W M
W M M
W M
W M

W
W M
M
M
W M

W M
W M M
W M
W M
W M
W M
W M
W M
W M W
W M
W M
M
W M
W M
W M
W M
M

W M

M
M

W M

M
M
W
W M
M
M

W M
M

W M
M

W M

W M

W M

W M
W
W M

W M

W M
M
W M
W M

W M
W
W M

W M
M
W M
W M
W M W

W M

W M

W M
M
W M
W
W M
M
W M
M
W M

W M

W M

W M
W M
M
W M
M
W M
W M M
W M
W M
W M
W M
W M
W M
W M M
W M

M
W M
M

M M
W M
M
M

W
W M
M
M
M
W M
M

W M

W M W

M
M

W M

M
M
W M
M
W
W M
W

M
W M
M
M

W M
M
M

W M
M

W M
M

W M
M
M
M
M M
W M
W M M
W M M
M
W M
W M
W
W M

W M
M
W M

W M

W M

W M
W M
W M

W M
M
W M

W M

W M

W M
M M
W M @
M

W M

W M
M

W M

M M

W M
M
W M
W M
M
W M
W M W
W M
W M
W M
W M
W M
W M
W M M M
W M
W M
W M W
W M W
W M
W M
W M
W M
W M
W M

W M

W M

W M
W M M
W M M
M
W M

W M
W M M
W M M
W M
W M
W M M
W M
W M

M
W
W M
M

M
W M
M

W M

M
W M

W M

W M
M
W M
W M M
W M
M
W M
M
M
W
W
W M
M

W M M

M
W

W M
W
M
W
W M
M
M
W M
M
W
M
W M
M
M
W
W M
M

M
M
W M
M

W M
M

W
W M
M

M
W M

W M

W M

W M

W M
M

M
W M
M M

W M
W M
M M

W
W M
M M
M
W

W M
M
M M
W œ

W M

M M

W M
M M

W M M M
M
M

M M M
W M
MM

W M M M M

W
W M

W M

W M
M M
W
W

M
W

W
W

W
W

W
W M

W
W

W
W

W
W

W
W
W
W W

W
W
W
W
W
W
W
W
M
W
W

W
W
W
W

W
W

W
W

W
M
W

W
W

W
W
W
W

W
W

W
W

W
M M
M M

W
W
M
M
W

W
M

W
M

W
W
W M

W M
W
M

W
W
M

W M

M
W
M
M
W M M
W

W
M

W
W
W M

W M

W
M

W W M

M
M
W

W
M
W

M
W

M
W

W
W

W
M

W
W
W M

M
W

W
M

W
M M
M

W
W

W
W

W
W

W
W

M
W

W
M

W M

W
M
W

W
W

M
W

M
W
M
M

W
W

W
W

W
W

M
W

W M

W
M

M M
W

W M

W
M
W

W
W

W
M
W

W
W

M
W

M
W
W

W
W

W
W

W
W

W
W

W
W

W
W

W
W
M
W

W M

W
M

M
W

M
W

W M

W
W
M

M
W

M
W
W

W
W

M
W

W
M
W

W
M

W
W
W

W
W
W

W
M
W
W
W M

W
M
W

W
W

W
W

W
M

W
M

M
W

M
W

W
W

W
W

W
W

W M

W
M
W

W
W

W
W
M

W
W

W
W
W
M
M W
W

W
W

M
M
W

M
W

W M

W
W

W
M
W

W
M

M
W
W

W
W
M

M
W

M
W M

M
W M

M
W

W W
W
W W
W
W
W W

W W
M

W W W
W

W W
M

W W

W W

W W

W W

W W

W W

W W
W W

W W

W W
W W

W W M
W
W

M
W W W M
W

W W M
W W
W

W W
Project Details for which KMZ Files are shared additionally for GIS Validation

Length Cost (in KMZ File Shared


Sr. No. State Project Name Status
(in km) Rs. Cr.) (Y/ N)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

You might also like