Kind attention is drawn to OMs under reference (i), (ii) and (iv) above and VC
meetings held in this conte xt on 15.07.2022 and 22.07.2022 (ref. (iii) above) on t he above
mention ed subj ect (copies attached for ready reference ).
2. The process of validat ion of NHs projectsl alignments on GIS platform of PM
GatiShakti NMP portal is still in progress as information pertaining to NHs entrusted with
State Governments are not fully made availab le and no information perta ining to NHs
entrusted wit h BRO has been received so far.
3. All concerned Stat es l UTs and BRO are requested to provide the requisite details as
per format s attached with OM under reference (ii) above URG ENTLY without any further
delay as the timeline of 31.07.2022 for submission is already overdue.
4. Kind attention is drawn to need for ensuring compliance wi th t he following aspects
while lin king up Latitude, Longitude of Projects and KMZ / KML files of NHs on GIS platform
in order to facilitate mapping and ident ificat ion of NHs project locations correctly on GIS
platform: -
(i) It is requested to ensure that the accuracy of Latitude and Longit ude are
based on those being provided in DPRs by Consu ltants based on site survey data ,
etc., ensuri ng that th e KMZI KML files of the alignments are correc t refl ect ions of
site while the same may be superimposed on any available digital map sof tware I
portal ; Latitude / Longitude shall be furnished to a precision upto 06 digits of decimal
place in degrees; e. g. typical report f ormat shall be
(ii) The GPS survey data being gathered as part of DPR should be critically
checked by the Consultants so that no discrepancy arises with actual ground
situat ion.
5. Ensuri ng compliance wit h above would also be a major step towards eventually
enabling seamless interac tions and information sharing between various portals such as
PMIS, Data lake, RAMS , PMG , OCMS, NIP, PM GatiShakti NMP, etc. , with minor modificat ions
in some of these porta ls; this would facilitate obviat ing current cumbersome practice of
making multiple ent ri es of individual proj ect level information separately in all the portals.
(5C5£? Page 1 of 2
c.IU, ersISUDIPIDownload,IOM_KMZ_LAnONG_"'OS' 2022_Mo<O V.docx
6. It is requested to t ake not e of above and also bring it into the notice of all concerned
for needful compliance of para 3 & 4 above. ~
I I/O g!?o:>-7.-
Sudip Chaudhury
Chief Engineer (Planning)
To,
All CE-ROs / SE-ROs of the Ministry
Copy to : -
Page 2 of 2
c.IU,ersI5UDIPIDownload,IOM. KMZ.LAn ONG.II·OB· IOZ2. Mad.IV.aocx
RW/NH-24036/27/2021-BP&SP-Part(1)
Government of India
Ministry of Road Transport & Highways
(Planning Zone)
Transport Bhawan, 1, Parliament Street, New Delhi – 110001
_____________________________________________________________________
Dated, 28th July, 2022
Office Memorandum (through email)
Kind attention is drawn to the OMs under reference on the above mentioned subject
and the VC Meetings held with the ROs of the Ministry & NHIDCL on 15.07.2022 and
22.07.2022 regarding furnishing of alignment (KMZ / KML files) so that the process of GIS
mapping of NHs network on BISAG-N Portal (PM GatiShakti National Master Plan) can be
concluded urgently.
2. The status of the receipts of KMZ files for ongoing projects is attached herewith. It
may be seen from the same that the details are yet to be received for the States of Andhra
Pradesh, Chhattisgarh, Haryana, Himachal Pradesh, Jammu and Kashmir, Jharkhand,
Karnataka, Kerala, Madhya Pradesh, Maharashtra, Goa, Punjab, Rajasthan, Tamil Nadu,
Puducherry, Telangana and Tripura. Further, partial information has been received from
State of the Bihar, Gujarat & Odisha.
3. In addition to above w.r.t. ref.(ii), it is requested to furnish additional alignment files
of completed / ongoing / balance for Award projects by 30.07.2022 which are available with
the respective agencies along with the details filled in Annexure-B (these are pending for
all States / UTs).
4. All concerned Chief Engineers of Project Zones and Regional Officers are requested
to accord Top Priority in furnishing balance information positively by tomorrow (i.e.
29.07.2022) FN so that the validation of these stretches may be concluded by 31.07.2022.
Sudip Chaudhury
Chief Engineer (Planning)
To,
2. All ADGs
3. All JSs / CEs
4. Sh. S. S. Jha, CGM, NHAI
5. Sh. Ajmer Singh, CGM, NHAI
6. Secretary General, Indian Roads Congress
7. Director, IAHE
8. Director (NT) / SE(PL)-I / SE(PL)-II
9. NIC-for uploading on Ministry’s website under “What’s new”
10. Sr. PPS to Secretary (RT&H)
OFFICE MEMORANDUM
As you are aware, Bhaskaracharya National Institute for Space Applications and Geo-Informatics (BISAG-
N), Gandhinagar, Gujarat has done GIS mapping of approximately ~1,30,000 km of NHs in the country but the
same are required to be updated and verified by field units of all the agencies for the Ministry.
1. With reference to the OM dated 3rd June 2022 from Chief Engineer (Planning), all the field units of executing
agencies (such as State PWDs / RCDs, NHIDCL, BRO, etc.) were requested to verify and update the GIS mapping
of all NHs under their jurisdiction by 31st July 2022.
2. As part of this exercise, MoRT&H has identified a list of projects which were completed in the past and are
currently under implementation for Roads Wing and NHIDCL from Project Monitoring Information System (PMIS).
3. In connection with the above, field units of State PWDs and NHIDCL are requested to furnish the alignment
(KMZ / KML) files for the identified projects (list provided in Annexure – A) latest by 15th July 2022
4. The field units shall also furnish additional alignment files of completed / ongoing / Balance for Award projects
by 15th July 2022 which are available with the respective agencies along with the details filled in Annexure - B
5. The KMZ files received will be furnished to BISAG-N for uploading it on the NMP portal.
6. For any further assistance, Sh. Bidur Kant Jha, Director; 8826173057; email: [email protected], may also be
contacted in this regard
To,
All CE-ROs / SE-ROs of the Ministry
Copy to: -
1. The Managing Director, NHIDCL, PTI Building, New Delhi – 110001
2. All Engineers-in-Chief and Chief Engineers of Public Works Department of States / UTs / Roads Construction
Department / Highways Departments (dealing with National Highways)
3. Sh. Ajay Patel, Project Director, BISAG-N; [email protected]
OFFICE MEMORANDUM
As you are aware that GIS mappin g of entire net work of National Highways (NHs) is
one of t he most i mpor tant requirement fo r planni ng, execut ion and monitoring of NHs
net work, but this import ant task has not been completed so far .
2. Bhaskaracharya National Institute for Space Applications and Geo-informatics
(BISAG-N), Gandhin agar , Guj arat has done GIS mappi ng of approxi mate ly 1,30,000 km of
NHs in the count ry but the same are require d to be update d and verifi ed by field units of
t he different agencies for the Ministry . The field units of NHAI in coordina tion and support
of BISAG·N are veri fyi ng t he det ails.
3. Si mila rly th e fi eld units of th e Ministry (i.e . ROs) and f ield units of ot her executing
agencies (such as State PWD sl RCDs , NHIDCL, BRO , etc.) are also req uired to engage
th emselves with BISAG-N for verif icat ion and updation of the GIS mapping of all NHs under
thei r j urisdict ion.
4. Accordi ngly , t he ROs of th e Ministry are requested to coord inat e wit h fi eld units of
other execut ing agencies ment ioned above t o depute sui table personnel from all executi ve
agencies I their f ield units inc luding from the ROs of t he Min istry in consultation wit h BISAG-
N to: -
(i) get th e det ails of all proj ect s I NH s secti ons wi t hin their respecti ve
jurisdictions checked and mapped with GIS maps of BISAG·N;
(ii ) ensure availa bility of relevant prerequisite deta ils wherever feasible (e.g.
available KML I KMZ f iles of alig nments I bypasses, ROW, chainage, et c.) wi t h field
units of respecti ve execut i ng agencies for ready reference dur ing i nt eract ion wi t h
BI SAG·N.
S. The entire exercise may be commenced immediately in consultation wit h BISAG-N
and comple te d by 31 " July, 2022.
6. NHAI has almost completed th e entire exercise f or t he NHs assigned wit h them wi t h
the cooperat ion of their fie ld units.
7. The ROs of the Ministry are requested to coordinate wi t h the ROs of NHAI for
necessary guidance i n this conte xt .
8. For any fu rther assistance , NHAI Nodal Off ice r for t his assignment [Shri 55 Jha, CGM
(Tech); Tel : 250741 00 Ext. No. 1821; M : 9234503333; email - sheoshankar@nhaL org 1 may
also be conta ct ed in this regard.
(Sudip Chaudhury )
Chief Engi neer (Planning)
To,
All CE-ROs I SE-ROs of t he Mi nist ry
Page 1 of 2
D:\CE_PL_S. 1. 2018\Gati_Shakti_MMLP\Digitizati on_NH_MopsILetter_GfS_mapping_RO_OJ'06' 2022.docx
Copy to: -
Page 2 of 2
D:\CE_PL_5.1.2018IGati_ShaktCMMLPIDigitizotion_NH_Maps\l et te,_GIS_mappin9_RO_OJ·06·2022.docx
3R'ifiT \'lqIUllll, arrtwr '"lli(tft<l ~ i(1\it'"l l. f lJ l~<t>i(UI
~/ff " " ' " q ~q ,;;1 :Jit;{ i( '1" r ~
I <it
ALKA UPADHYAYA, lAS National Highways Author ity of India
CHAIRPERSON MINISTRY OF ROAD TRANSPORT & HIGHWAYS
GIS mapping of all projects of NHAI is one of the most important tool for
monitoring the projects. Unfortunately, no such mapping has been done so far at
NHAI.
3. Both BISAG & Amnex are located at Gandhinagar/Ahmedabad. Since all the support
is available at the office of BISAG, All ROs need to depute suitable personnel, in
consultation with BISAG, and get the details of all Projects under their respective
j urisdictions checked and mapped with GIS Map of BISAG. In the first instance, RO-
Gujarat, located at Gandhinagar, may get such exercise done in the next 10 days.
4. In view of th e pressure of targets till 31'1 March, 2022, it may not be possible to
spare officers for the above mapping work by other ROs. The mapping of projects
under remaining ROs will, therefore, be taken up from 10th April, 2022 and the whole
exercise will be completed by 31't May, 2022. However, till that time, you may get the
relevant prerequisite details, viz KML file, ROW, Chainage etc., of all Projects under
your jurisdiction compiled for ready reference during checking.
5. Shri 55 Jha, CGM(T) would be the Nodal Officer at NHAI HQ for this task and he
may be contacted for any further information in this regard.
-4eee<;,
(A l ka~
Chairperson
To
Rehabilitation and up-gradation of NH-340 from km 0+000
to km 60+380 (Design Ch. 0/000 to 60/025) (Rayachoty to
275 60530 Roads Wing Andhra Pradesh Angallu section) to two lane with paved shoulders in the 58 319.28 Under Implementation
State of Andhra Pradesh under Corridor Approach through
Engineering, Procurement & Con
Rehabilitation and up-gradation of NH-167 from Km 14/900
to Km70/000 (Design Ch. 14/900 to 69/700) (Chintakunta to
276 60527 Roads Wing Andhra Pradesh Adoni section) to two lane with paved shoulders in the 54.8 290.15 Under Implementation
State of Andhra Pradesh under Corridor Approach through
Engineering, Procurement & Co
Rehabilitation and up-gradation of NH-75(Old NH-234) from
Km 506/100 to Km 508/700 and Km 518/700 to Km
534/350 (Design Ch. Km 506/100 to 508/650 and 518/700
277 60529 Roads Wing Andhra Pradesh 18 147.66 Under Implementation
to 534/100) Mangalore to Thiruvannamalai Road to two
lane with paved shoulders in the State of Andhra Pradesh
on EPC mode
Widening to two lane with paved shoulders of Bowdara -
278 151069 Roads Wing Andhra Pradesh 26.94 127.91 Under Implementation
Vizianagaram section of NH 516E
Two laning with paved shoulders of Paderu to
279 151070 Roads Wing Andhra Pradesh 25.08 222.61 Under Implementation
GundigudaSection of NH 516E
Two laning with paved shoulders of Gondiguda to Araku
280 151071 Roads Wing Andhra Pradesh 24.29 296.66 Under Implementation
(uptoBhallaguda) section of NH 516E
Widening and strengthening of two lane with paved
shoulder to 4-lane road from Kadapa to Airport road in Km
281 151377 Roads Wing Andhra Pradesh 5.9 34.13 Under Implementation
137/6 to Km 140/6 and Yerranguntla town from Km 168/1
to Km 171/0 of Renigunta – Kadapa road of NH-716
Widening and strengthening to two lane with paved
282 151378 Roads Wing Andhra Pradesh 32.03 116.44 Under Implementation
shoulders from Km 491/000 to Km 525/200 of NH-26.
283 151775 Roads Wing Andhra Pradesh Construction of Kadiri Bypass on NH-42 12.57 220.66 Under Implementation
Widening to two lane with paved shoulders from Km 0/0 to
284 151969 Roads Wing Andhra Pradesh 60.45 529.54 Under Implementation
64/020 (Pamarru to Akiveedu)
Rehabilitation and Up-gradation of Thimmapuram to
Gurajanapalli section from Km 26/150 to Km 41/161 of NH -
285 64831 Roads Wing Andhra Pradesh 19 350.61 Under Implementation
214 ( New NH - 216) to two lane with paved shoulder in the
state of Andhra Pradesh under NHDP-IV
Rehabilittion and upgradation of Machilipatnam to
Avanigadda section from km 84/550 - 124/200 of NH 214A
286 64834 Roads Wing Andhra Pradesh 34 376.25 Under Implementation
(new NH 216) to two lane with paved shoulder in the State
of AP under NHDPIV through EPC basis
Rehabilitation and Up-gradation of Pasarlapudi to Dhindi
section from Km 105/170 to Km 126/510 of NH -214 (New
287 64835 Roads Wing Andhra Pradesh 20.82 263.45 Under Implementation
NH -216) to two lane with paved shoulder in the state of
Andhra Pradesh under NHDP-IV
Rehabilitation and upgradation of Repalle to Eeppurpalem
section from Km 129/927 to Km 195/000 of NH-214A (New
288 64836 Roads Wing Andhra Pradesh 62 576.48 Under Implementation
NH-216) to two lane with paved shoulder under NHDP-IV
on EPC basis
Widening & Strengthening of 2/4 lane to 4 lane carriageway
from Km 6/0 to 15/0 of Kurnool Guntur road(NH-340C) in
289 152174 Roads Wing Andhra Pradesh 9.01 96.15 Under Implementation
Kurnool District in the State of Andhra Pradesh through EPC
mode
Widening & Strengthening from Km 93/400 to 95/410 of
Madanapalle - Naidupeta road of NH-71 to two lane with
290 152175 Roads Wing Andhra Pradesh 2 11.57 Under Implementation
paved shoulder in the State of Andhra Pradesh on EPC
mode
Widening the Urban Link of NH-42 from Km 0+000 to Km
9+200 in the Anantapur town in the State of Andhra
291 152421 Roads Wing Andhra Pradesh 9.2 311.93 Under Implementation
Pradesh through EPC mode of contract under NH (O)
(Length-9.200 Kms)
Construction of 4-lane bypass to Vijayanagaram Town from
292 67833 Roads Wing Andhra Pradesh 17 429.43 Under Implementation
537/6 to 552/0 (Raipur- Vijayanagaram section)
Rehabilitation and upgradation of Dornala T junction to
293 68031 Roads Wing Andhra Pradesh Penchalakona Km 361/327 to 425/4 of Nh-565 in the state 42.31 418.03 Under Implementation
of Andhra Pradesh.
Rehabilitation and upgradation of NH 326A from km 0/0 to
41/979 (excluding km 2/255 to 3/372 and km 36/820 to
294 91702 Roads Wing Andhra Pradesh 38/275) (Odisha border to Narasamapeta) to two lane with 39 228.32 Under Implementation
paved Shoulders in the State of Andhra Pradesh under
NH(O) on EPC Mode
Widening and Strengthening to 2 Lane with Paved shoulder
from Intermediate lane of NH-516E from Km.16/000 to
295 152528 Roads Wing Andhra Pradesh Km.28/800 (except Km.18/400 to Km.20/000) of 11.2 31.32 Under Implementation
Rajamahendravaram to Rampachodavaram in the state of
Andhra Pradesh on EPC mode
Rehabilitation and upgradation of New NH 544DD from
296 123729 Roads Wing Andhra Pradesh design Chainage Km. 56/000 to 102/20 of Kalyandrg - 46 289.67 Under Implementation
Molakalmuru Section
Construction ofProposed 4-Lane ROBand its approaches in
lieu of existing level crossing No. 95/SPL @ Km 272.600(
297 124078 Roads Wing Andhra Pradesh 3 87.66 Under Implementation
Railway Chainage 93/17-19) on NH 205 in the State of A.P.
Job No. NH-205 /AP(36)/17-S&R(B)018 dt 07-07-2017
Construction of 2-Lane ROB and subway in lien of level
crossing No. 88 at Railway km 136/5-6 between
298 124082 Roads Wing Andhra Pradesh Kurbalakota & Madanapalli Section on Dharmavaram- 1 43.32 Under Implementation
Pakala Section at km 56/100 of NH-340 on EPC mode in the
State of A.P. Job No. NH-340 -AP17-18 -669 dt 28-03-2018.
Construction of 2-Lane ROB and its approaches in lien of
level crossing No. 31 @ Km 2.100 (Railway chainage 33/900-
299 124085 Roads Wing Andhra Pradesh 1 54.38 Under Implementation
1000) on NH-326A on EPC mode in the State of A.P.Job No.
NH-326 A -AP-17-18 -670 dt 28-03-2018.
Construction of 2-Lane ROB and its approaches in lien of
level crossing No.414 @ Km 33.100 (Railway chainage
300 124086 Roads Wing Andhra Pradesh 1 54.71 Under Implementation
730/11-13) on NH-326A on EPC mode in the State of A.P.
Job No. NH-326A-AP17-18 -671 dt 28-03-2018.
Construction of 4-Lane ROB and its approaches in lien of
existing level crossing No.124E/SPL 3@ Km 1.800( New
301 137315 Roads Wing Andhra Pradesh 1.55 73.92 Under Implementation
Chainage km 77.805 on NH 205 in the State of A.P. Job No.
NH-205 /AP(2)/15-16-007-S&R(B) dt 14-03-2016
Construction of 4-Lane ROBand its approaches in lien of
existing level crossing No. 102/3E @ Km 281.200 of NH 205
302 137317 Roads Wing Andhra Pradesh 1 133.56 Under Implementation
in the State of A.P. Job No. NH-205 /AP(8)/15-16-010-
S&R(B) dt 31-03-2016
Construction ofProposed 4-Lane ROBand its approaches in
lien of existing level crossing No. 30/E @ Km 64.800(
303 137320 Roads Wing Andhra Pradesh 1.43 56.34 Under Implementation
Railway Chainage 42.858) on NH 205 in the State of A.P. Job
No. NH-205 /AP(1)/16-17-016-S&R(B) dt 31-03-2017
Construction ofProposed 4-Lane ROBand its approaches in
lien of existing level crossing No. 48E/C @ Km 96.80(
304 139237 Roads Wing Andhra Pradesh 2 68.83 Under Implementation
Railway Chainage 74.431) on NH 205 in the State of A.P. Job
No. NH-205 /AP(39)/16-17-012-S&R(B) dt 22-03-2017
Construction ofProposed 4-Lane ROBand its approaches in
lien of existing level crossing No. 45 C @ Km 93.40( Railway
305 139238 Roads Wing Andhra Pradesh 1 60.38 Under Implementation
Chainage 70/903) on NH 205 in the State of A.P. Job No. NH-
205 /AP(3)/17-S&R(B)019 dt 07-07-2017
Construction of Proposed 4-Lane ROB and its approaches in
lien of existing level crossing No. 67 @ Km 133.20( Railway
306 139241 Roads Wing Andhra Pradesh 2 63.79 Under Implementation
Chainage 109/3-4) on NH 205 in the State of A.P. Job No.
NH-205 /AP(38)/16-17-013-S&R(B) dt 24-03-2017
Construction of proposed 4- lane RoB at Railway Chainage
km 44/679 between Puthalapattu -RVS Nagar Station of
307 141388 Roads Wing Andhra Pradesh kathipudi- pakala Section @km 12/4 on NH 18 in the state 2 66.46 Under Implementation
of Andhra Pradesh on EPC Mode [job.no. 18-AP-2018-19-
676 dt:16.01.19
Rehabilitiation and upgradation of Chittoor - Kurnool Road
NH-18 (New NH-40) from 2 lane to 4 Lane from Km 4/14 to
308 144969 Roads Wing Andhra Pradesh 18/34 (excluding 2.94 Km ROB Portion) from Murkumbattu 11 84.55 Under Implementation
Junction to Rangampet cross in the State of Andhra Pradesh
through EPC mode
Construction of 4 Lane ROB and Subway in lien of level
crossing no. 17 @ km 108/1-2 between Jamalamagudu &
309 148635 Roads Wing Andhra Pradesh Proddator Station on Nandyal-Yerraguntla section at km 0.95 63.89 Under Implementation
563/200 of NH-67 EPC mode in the state of A.P. Job No. NH-
67-AP-17-18-672 dt 28-03-2018
"CONSTRUCTION OF 4 LANE ROB & APPROACHES IN LIEU
OF LC NO. 93E/SPL3 AT KM. 84/04-05 BETWEEN AKIVEEDU
AND PALLEVADA STATIONS ON GUDIVADA - BHIMAVARAM
310 150296 Roads Wing Andhra Pradesh 1.68 88.03 Awarded, not Appointed
RAILWAY SECTION AT NH KM. 183+700 ON NH 214 (NEW
NH-165 ) IN KRISHNA DISTRICT, IN THE STATE OF ANDHRA
PRADESH. "
Construction of 4-lane ROB and its approaches between
Gudivada and Nujella railway station on Gudivada -
311 152173 Roads Wing Andhra Pradesh 1.28 90.84 Awarded, not Appointed
Machilipatnam section at Km 10+906 of NH-165 in the State
of Andhra Pradesh
Construction of 4 Lane ROB at Km 510/8 of NH-565 (Near
312 152419 Roads Wing Andhra Pradesh Yerpedu) in Lieu of L.C. No. 36 in the State of Andhra 2.27 98.76 Awarded, not Appointed
Pradesh on EPC mode
Formation of Bypass road to Mudigubba from Km 130/400
to Km 137/500 (Design Ch. 130/392 to 138/141) on NH-42
313 152453 Roads Wing Andhra Pradesh 7.75 116.81 Awarded, not Appointed
of two lane with paved shoulder road in the State of Andhra
Pradesh through EPC mode
Rehabilitation and Up-gradation of NH-565 from Km 86/057
to Km 132/920 Nagarjuna Sagar Dam to Davulapally section
314 152877 Roads Wing Andhra Pradesh 46.86 385.97 Awarded, not Appointed
to Two lane with paved shoulder in the State of Andhra
Pradesh through EPC mode
Rehabilitation and Up-gradation of NH-167B from
km.143/320 (Malakonda) to 189/050 (Singarayakonda) (on
315 153004 Roads Wing Andhra Pradesh 45.73 0 Awarded, not Appointed
NH 16) to two lane with paved shoulders in Andhra Pradesh
through EPC mode of contract
Rehabilitation and Up-gradation from Km 170+700
Bhadrachalam to Km 234+567 Konta on NH-30 to Two lane
316 153077 Roads Wing Andhra Pradesh 63.86 388.7 Awarded, not Appointed
with Paved Shoulder in the State of Andra Pradesh on EPC
mode.
Construction of Two-Lane Major Bridge acroos Penna river
at Km. 739.234 of NH-67 including approaches paralles to
317 153078 Roads Wing Andhra Pradesh 2.68 99.48 Awarded, not Appointed
existing 2 lane bridge in SPS Nellore District in the State of
Andhra Pradesh through EPC contract.
Widening to two lane with paved shoulder including
strengthening of existing 2L+PS and 4 lane stretches of
bypassed stretches of NH 544E of Hindupur and Parigi
318 153083 Roads Wing Andhra Pradesh 20.04 98.16 Awarded, not Appointed
towns Chainage 21 / 640 to Km 41 / 699 under one time
improvement in the state of Andhra Pradesh under NH (O)
for the year 2021-22 on EPC mode
Rehabilitation and Upgradation to 2-lane with paved
shoulders configuration of Koyyuru to Chaprathipalem
section (Km 120+000 to Km 165+500) of NH-516E in the
319 153086 Roads Wing Andhra Pradesh 45.5 349.29 Awarded, not Appointed
State of Andhra Pradesh under Green National Highways
Corridor Project (GNHCP) with the loan assistance of World
Bank on EPC mode
Rehabilitation and Upgradation to 2-lane with paved should
ders Sir, configuration of Chaprathipalem to Lambasingi
section (Km 165+500 to Km 205+000) of NH-516E in the
320 153087 Roads Wing Andhra Pradesh 39.5 311.22 Awarded, not Appointed
State of Andhra Pradesh under Green National Highways
Corridor Project (GNHCP) with the loan assistance of World
Bank on EPC mode
Rehabilitation and Up-gradation of NH-1678 from Km
321 153089 Roads Wing Andhra Pradesh 99.103 (CS Puram) to Km 143.320 (Malakonda) to Two lane 44.22 277.31 Awarded, not Appointed
with Paved Shoulders in Andhra Pradesh
4 lane ROB at km.4/0-4/1 between Gudivada-Nujella station
322 153099 Roads Wing Andhra Pradesh on Gudivada-Machilipatnam section at NH Km. 10+906 on 1.28 90.84 Awarded, not Appointed
Pamarru and Alapadu Bypass road of NH-165
2-lane ROB and its approaches in Lieu of existing LC No.120
323 153101 Roads Wing Andhra Pradesh is at K.M. 56.700 of NH-18 (New NH-40) under Setu 1.4 60.04 Awarded, not Appointed
Bharatam
Construction of 2 lane ROB with approaches in lieu of
324 153102 Roads Wing Andhra Pradesh existing LC No. 119 at km 226/80 of NH 205 (New NH 71) 1.2 66.6 Awarded, not Appointed
under Setu Bharatam
Widening of existing road to 2 lane NH standards along with
improvements and realignments from Nechipu to Hoj, via
325 53016 Roads Wing Arunachal Pradesh Seppa, Khodaso, Sagalee (part of Trans Arunachal Highway) 252.21 2036.9 Completed
in Arunachal Pradesh under SARDP-NE on BOT (Annuity)
mode
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 0.00 to Km 44.35 (Package-1) on EPC Mode in
326 149631 Roads Wing Arunachal Pradesh the State of Arunachal Pradesh under Arunachal Pradesh 44.38 403.68 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/115]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 44.35 to Km 77.95 (Package-2) on EPC Mode in
327 149632 Roads Wing Arunachal Pradesh the State of Arunachal Pradesh under Arunachal Pradesh 33.6 342.55 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/115]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 77.95 to Km 117.56 (Package-3) on EPC Mode
328 149633 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 39.61 421.48 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/115]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 117.56 to Km 163.59 (Package-4) on EPC Mode
329 149634 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 46.03 543.05 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 206.66 to Km 247.05 (Package-6) on EPC Mode
330 149666 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 40.39 486.7 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 247.05 to Km 284.92 (Package-7) on EPC Mode
331 149667 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 37.87 560.39 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/117]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 284.92 to Km 314.25 (Package-8) on EPC Mode
332 149668 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 29.33 347.78 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/117]
Widening of existing road to 2 lane with paved shoulder
333 149892 Roads Wing Arunachal Pradesh from Hukanjuri to Khonsa section of NH-315A from design 9 98.45 Under Implementation
chainage Km 0.00 to 9.00 (Package-A) in the State of Arun
Construction of major bridge including approaches over
Dikrong river at Km 28.750 of NH-713A on EPC mode in the
334 149893 Roads Wing Arunachal Pradesh 0.84 41.86 Under Implementation
State of Arunachal Pradesh [Job No. 713A/Ar. P/2019-
20/024]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 314.25 to Km 351.383 (Package-9) on EPC
335 150367 Roads Wing Arunachal Pradesh Mode in the State of Arunachal Pradesh under Arunachal 37.13 394.27 Under Implementation
Pradesh Package of Roads and Highways of SARDP-NE [Job
No: SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/117]
Construction of 2-lane road of Potin to Pangin section of NH-
13 from Km 163.59 to Km 206.66 (Package-5) on EPC Mode
336 150458 Roads Wing Arunachal Pradesh in the State of Arunachal Pradesh under Arunachal Pradesh 43.07 450.65 Under Implementation
Package of Roads and Highways of SARDP-NE [Job No:
SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116]
4-laning of NH-415 from design Chainage 29/500 to 40/400
(Itanagar to Banderdewa section) in the State of Arunachal
337 56991 Roads Wing Arunachal Pradesh 10.9 243.89 Under Implementation
Pradesh under Annual Plan 2016-17 on EPC Mode. Package
– A.
2-laning of Longding– Tissa- Khonsa road (NH-215) on
338 150910 Roads Wing Arunachal Pradesh EPC Mode in the State of Arunachal Pradesh [Job No. 42.5 358.26 Under Implementation
215/Ar. P/2019-20/028]
Widening of existing road to 2 lane with paved shoulder
from Hukanjuri to Khonsa section of NH-315A from design
339 150912 Roads Wing Arunachal Pradesh chainage Km 9.00 to 12.24 (Package-B) in the State of 3.24 41.41 Under Implementation
Arunachal Pradesh on EPC mode. [Job No. 315A/Ar.P/2019-
20/023]
340 150997 Roads Wing Arunachal Pradesh Lalpul-Arunachal Pradesh-Changlang-PKG-1 68.3 588.09 Under Implementation
4-Laning of Itanagar to Bandardewa section of NH-415from
km 40+430 to km 51+735 (Package-B)on EPC Mode in the
341 151280 Roads Wing Arunachal Pradesh 11.31 496.47 Under Implementation
state of Arunachal Pradesh (Job NO. 415/Ar. P/2020-
21/031)
4-Laning of Itanagar to Bandardewa section of NH-415from
342 151361 Roads Wing Arunachal Pradesh km 51+700 to km 59+199 (Package-C)on EPC Mode in the 7.5 437.6 Under Implementation
state of Arunachal Pradesh (Job NO.415/Ar. P/2020-21/030)
Widening of existing road to 2 lane with paved shoulder
from Hukanjuri to Khonsa section of NH-315A from design
343 152414 Roads Wing Arunachal Pradesh chainage Km 12.240 to 26.342 (Package-C) in the State of 14.1 182.55 Under Implementation
Arunachal Pradesh on EPC mode. [Job No. 315A/Ar. P/2020-
21/032]
Construction of minor bridge over Holongi river at Km
344 148163 Roads Wing Arunachal Pradesh 11.800 on Holongi-Itanagar section of NH-415 in the state 0.04 6.81 Under Implementation
of Arunachal Pradesh on EPC Mode.
Widening of existing road to 2 lane with paved shoulder
from Hukanjuri to Khonsa section of NH-315A from design
345 148855 Roads Wing Arunachal Pradesh chainage Km 26.30 to 27.474 (Package-D) in the State of 1.17 16.55 Under Implementation
Arunachal Pradesh on EPC mode. [Job No. 315A/Ar.P/2019-
20/022]
Construction of new Bridge over River krishnai (Br. No.34/1)
346 149532 Roads Wing Assam on NH-37 (New NH-17) in the State of Assam under 0.01 34.62 Under Implementation
EPCMode. (Job.No.017(New)/AS/2019-20/193)
Construction of new Bridge over River Kumatia ( Bridge
347 150618 Roads Wing Assam No.397/1) including subway bridge and approaches on NH- 0.01 43.55 Under Implementation
52 ( New NH No.15) Job No.015/AS/2020-21/211
348 50686 Roads Wing Assam 2 laning from Kanubari to start of Bogibeel Bridge 63.4 268.08 Under Implementation
Construction of 2-lane Highway with paved shoulders
349 50687 Roads Wing Assam 34.85 133.4 Under Implementation
between Dibrugarh - Panitola km 603/0 to 637/0 of NH-37
350 50695 Roads Wing Assam Dhaleshwari Bypass from km. 0.00 - 3.500 3.5 53.15 Under Implementation
Construction of Proposed North Lakhimpur By-pass from
351 50707 Roads Wing Assam existing km 338/924 to km 349/213 of NH-52 in the state of 12.51 127.24 Under Implementation
Assam (Job No.052-AS-2011-12-099)
Construction of Guide Bund and Bridge Protection works of
Bridge No. 338/1 over River Ranganadi and Re-construction
352 150664 Roads Wing Assam of Superstructure of Bridge over River Haijan (Bridge no. 0.01 19.19 Under Implementation
342/1) on NH-15 under NH Nagaon Division in the State of
Assam. (Job No. 015/AS/2019-20/208)
Construction of new bridge over River Dhansiri (Br. No.
82/1) on NH-15 (Old NH-52) under Annual Plan for the year
353 150672 Roads Wing Assam 0.01 40.45 Under Implementation
2019-20 in the State of Assam under EPC mode. (Job No.
015/AS/2019-20/202)
"Balance work for ""Improvement of existing single
intermediate lane road of NH-44 to be 2-lane road with
paved shoulder from km 230/200 to km 247/000, km
261.504 (Ex.ch.260.109) to km 263.191 (Ex.ch.261.761 &
354 150783 Roads Wing Assam 30.28 166.94 Under Implementation
Km 272.241 (Ex.ch.271.00 to km.284.053 (Ex.ch.284.053
(Total Length=30.28km of NH-44 in the state of Assam on
EPC mode"". Job no.SARDP-NE/NH-44/AS/PWD/2010-
11/182"
Construction of New 2-lane major bridge including
approached over Brahmaputra between Majuli on North
Bank and Jorhat on South Bank from Km 11/690 to Km
355 151563 Roads Wing Assam 0.01 925.47 Under Implementation
19/715-Length of bridge 6812.5 m (Package II) on NH-715 K
in the State of Assam on EPC mode. (Job.No.715/AS /2020-
21/213 )
Construction of New Bridge over river Kuthori (Br.No.
356 153389 Roads Wing Assam 352/1) on NH-715 (Old NH-37) in the State of Assam under 0.01 6.87 Under Implementation
EPC mode (Job No. BR.352/1/AS/2021-22/222)
W&S of 2 lane with paved shoulder from km 0.00 to 25.01
357 50615 Roads Wing Bihar 25 84 Completed
of NH-327A under NH(O) on EPC Mode.
W/S to two lane with paved shoulder in km 0.00 to 19.04 of
358 53086 Roads Wing Bihar 19.4 111 Completed
NH-81 in the state of Bihar
Construction of 4-lane ROB of km 119 of NH-30 (Job no. NH-
359 61053 Roads Wing Bihar 1.56 126.6 Completed
30/Bihar (6)/15-16/017-S&R(B))
360 62910 Roads Wing Bihar HL RCC minor bridge in km 24 0.04 6.02 Completed
Strengthening and widening to 2 lane with paved shoulder
361 142226 Roads Wing Bihar 24.44 100.44 Completed
from km 112.00 to 136.440 of NH-327E
362 50590 Roads Wing Bihar Sheohar-Sitamarhi Section km 40.000 to 79.400 km Lot-I 28.5 179 Under Implementation
363 50592 Roads Wing Bihar Sitamarhi-Jaynagar Section km 79.400 to km 156.500 Lot-II 77 370 Under Implementation
364 50593 Roads Wing Bihar Fatuah-Harnaut-Barh Section km 0 to km 69.6 NH-30A 72 683.82 Under Implementation
365 50594 Roads Wing Bihar Birpur – Bihpur Section km 0.0 to Km 106 NH – 106 106 780.77 Under Implementation
366 50595 Roads Wing Bihar Jaynagar-Narahia Section km 156.500 to km 219.945 Lot-III 63.45 553 Under Implementation
Gaya-Hisua-Rajgir-Nalanda-Biharsharif section km0.00 to
367 50597 Roads Wing Bihar 93 1408.85 Under Implementation
92.935 NH-82
368 50599 Roads Wing Bihar Construction of ROB at km 1.10 & km 1.11 of NH-101 1.5 62 Under Implementation
369 50600 Roads Wing Bihar Construction of ROB on NH-81 at Km 31 1.48 53.78 Under Implementation
370 50603 Roads Wing Bihar W&S km 0.00 o 28.00 NH-527A 26.3 99 Under Implementation
371 50604 Roads Wing Bihar Construction of ROB on NH-19 at Km 132 2 99.61 Under Implementation
372 50605 Roads Wing Bihar Construction of ROB on NH-19 at Km 135 0 75.35 Under Implementation
373 50608 Roads Wing Bihar Construction of ROB on NH-103 at Km 12 2.11 192.14 Under Implementation
374 50610 Roads Wing Bihar CONSTRUCTION OF FOUR LANE ROB ON NH-327E AT KM 11 2.4 82.43 Under Implementation
CONSTRUCTION OF TWO LANE ROB ON NH-32 M
375 50611 Roads Wing Bihar
W
M
W
W
W M
M
W
W
W
W
W
W
W M
W
W
W W
W W
W W
M
W
W
W
W
W
W
M
W
W
M
W M
M
W
W
W
W
W
W
M M
M
W
M
M
W
W W
W
W
W
M
W
W M
W
W
W M
W
W
W
W
W
W M
W
W
W
W M
W
W M
W
W
W M
W M
W
M
M
W
W
W
M
W
M
W
W
M M
W
W M W
W
M
W M
W
M
W M
W M
W
W M M
W
M
W
W
W
M
W
M
W
@
W
W
W
M
W
@
M
M
W
M
W M
M
W
M
W
W
W
W
M
W
M
W
W
M
W
W
W
W
W
M
W
W
W
W
W M
W M M
W
W
W
M
W
W
W W
W
W
M
W
W
M
W
M
W
W
W
W
W M
W
W
W
W
W W
W
W
W
W
W
M
W
W
W
W
W
W
W
W
W
W
W M
W
W
W
W
M
W M
W
W
W
W
W
W
M
W
W
M M
W
W
W
W
W
M
W
W
M
W
M
W
W
W
W
W M
W
W
W
W
W
W
M
W
W
W
W
M
W
W M
W
M
W
M M
W
M
W
M
W
W
M
W
M
W
M M
W M
M
W
M
W
W
W
W
M M
W M
M
W M
W M
M
W M
W M
W M
M
W M
W M
W M M
W M M
W M
W M M
W M
W M
M M
M
W M
M
W M
M
M
W M
M M
W M
M M
W W
W M
W M
W M
M
W M
W M
M
M
W M
M
W
W M
W M M
W M
W M M M
W M
W M
M
W M
M
M
W M
M
W
W M
W M
W M
M
M
W M
M
M
W M
M
W M
M
W M
W M
M
W M
W M
W M
W M
M
W M
W W
W M
W M
W M
W M M M M
W M M
W M
W M
W
W M
W
W M
W M
W M
W M
W M M
W M
W M
W M M
W M
W M M
W M
W M
W
W M
M
M
W M
W M
W M M
W M
W M
W M
W M
W M
W M
W M W
W M
W M
M
W M
W M
W M
W M
M
W M
M
M
W M
M
M
W
W M
M
M
W M
M
W M
M
W M
W M
W M
W M
W
W M
W M
W M
M
W M
W M
W M
W
W M
W M
M
W M
W M
W M W
W M
W M
W M
M
W M
W
W M
M
W M
M
W M
W M
W M
W M
W M
M
W M
M
W M
W M M
W M
W M
W M
W M
W M
W M
W M M
W M
M
W M
M
M M
W M
M
M
W
W M
M
M
M
W M
M
W M
W M W
M
M
W M
M
M
W M
M
W
W M
W
M
W M
M
M
W M
M
M
W M
M
W M
M
W M
M
M
M
M M
W M
W M M
W M M
M
W M
W M
W
W M
W M
M
W M
W M
W M
W M
W M
W M
W M
M
W M
W M
W M
W M
M M
W M @
M
W M
W M
M
W M
M M
W M
M
W M
W M
M
W M
W M W
W M
W M
W M
W M
W M
W M
W M M M
W M
W M
W M W
W M W
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M M
W M M
M
W M
W M
W M M
W M M
W M
W M
W M M
W M
W M
M
W
W M
M
M
W M
M
W M
M
W M
W M
W M
M
W M
W M M
W M
M
W M
M
M
W
W
W M
M
W M M
M
W
W M
W
M
W
W M
M
M
W M
M
W
M
W M
M
M
W
W M
M
M
M
W M
M
W M
M
W
W M
M
M
W M
W M
W M
W M
W M
M
M
W M
M M
W M
W M
M M
W
W M
M M
M
W
W M
M
M M
W œ
W M
M M
W M
M M
W M M M
M
M
M M M
W M
MM
W M M M M
W
W M
W M
W M
M M
W
W
M
W
W
W
W
W
W
W M
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
M
W
W
W
W
W
W
W
W
W
W
W
M
W
W
W
W
W
W
W
W
W
W
W
W
M M
M M
W
W
M
M
W
W
M
W
M
W
W
W M
W M
W
M
W
W
M
W M
M
W
M
M
W M M
W
W
M
W
W
W M
W M
W
M
W W M
M
M
W
W
M
W
M
W
M
W
W
W
W
M
W
W
W M
M
W
W
M
W
M M
M
W
W
W
W
W
W
W
W
M
W
W
M
W M
W
M
W
W
W
M
W
M
W
M
M
W
W
W
W
W
W
M
W
W M
W
M
M M
W
W M
W
M
W
W
W
W
M
W
W
W
M
W
M
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
M
W
W M
W
M
M
W
M
W
W M
W
W
M
M
W
M
W
W
W
W
M
W
W
M
W
W
M
W
W
W
W
W
W
W
M
W
W
W M
W
M
W
W
W
W
W
W
M
W
M
M
W
M
W
W
W
W
W
W
W
W M
W
M
W
W
W
W
W
M
W
W
W
W
W
M
M W
W
W
W
M
M
W
M
W
W M
W
W
W
M
W
W
M
M
W
W
W
W
M
M
W
M
W M
M
W M
M
W
W W
W
W W
W
W
W W
W W
M
W W W
W
W W
M
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W M
W
W
M
W W W M
W
W W M
W W
W
W W
Project Details for which KMZ Files are shared additionally for GIS Validation