GASLOG Singapore GA DWG - Appendix 10
GASLOG Singapore GA DWG - Appendix 10
GASLOG Singapore GA DWG - Appendix 10
Filename: GES-101-C-01-X.dwg
BEDROOM
LIFT
CGL WC ELEVATOR PULLEY
BEDROOM 1700
SPACE
VSAT ANTENNA
CGL
3200
COMMUNICATION MAIN AIR
SUPPLY NAVIGATION
ELECTRONICS GASLOG SINGAPORE
E/R SURPLUS UP CARGO ROOM E/R SURPLUS ELECTRONICS P/D
SPARE CABIN
AIR EXHAUST ENGINEER PIPE/DUCT AIR EXHAUST UP ROOM TRUNK
00
00
DAY ROOM TRUNK
0 0.
40
MAIN AIR WC
R
RETURN
GCU E.G.P
C.L. 20 30 40 50 60 70
C.L. 20 30 40 50 60 70
C.L. 20 30 40 50 60 70
DN MAGNETIC
UP
DN
OWNER PILOT
DN COMPASS
CARGO TANK
E/R SURPLUS DOCUMENT E/R SURPLUS
DAY ROOM
AIR EXHAUST ROOM AIR EXHAUST
BATTERY SAFETY
18855
DN LOCKER STORE
STORE
EL TRUNK
CAPTAIN'S
26000
BEDROOM
NIGHT PANTRY
BEDROOM
UP
DN
SATELLITE TV
CHIEF OFFICER ANTENNA
ELECTRICIAN BEDROOM CAPTAIN DAY ROOM
DAY ROOM ENGINE ROOM
DN DN
4025
3120
B.L B.L
C.L
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
A.P F.P
13600 41600 2450 47145 2900 47145 2900 47145 2700 27765 2700 16800 9600 9600 4039 15283
F.S. : 800 F.S. : 3370 3335 F.S. : 3370 3335 F.S. : 3370 3335 F.S. : 3085 F.S. : 800
21700
MIDSHIP SECTION
C-DECK PLAN B-DECK PLAN A-DECK PLAN
26 27 14 4 3 16 15 20 4 14 27
20 6 8 5 7 16 9
UPPER DECK PLAN
PROVISION CRANE
(SWL:10TON)
FENDER 1 FENDER 2 FENDER 3 FENDER 4
R3
6
SADDLE 1 SADDLE 2
00
R 1
(M
800
0(
IN
)
MA
X) 1 13
UP
DN DN
DN
DN DN
JUNIOR 3RD 3RD V.M.T(A) OFFICE
NEW ITEM / MODIFICATION LIST:
ENGINEER ENGINEER-1 ENGINEER-2 MASTER CREW 1 CREW 2 CREW 3 CREW 4
FRESH AIR EMERGENCY GENERATOR CREW 5
INTAKE & SWBD ROOM
000 NO. NAME OF EQUIPMENT / ITEM QTY. LOCATION CAPACITY/DIMENSIONS REMARKS
R15
0
UP UP
VENT FAN ROOM (S)
00
CREW 6 1 AFT QRH 3 AFT (PORT) / MOORING DECK DOUBLE HOOK (150T) -
F
0
EXISTING NEW EXISTING
V.M.T(B) OFFICE (INSUL. 50)
283,709.80
R1
CHIEF ENGINEER F F 2 NEW LNG FEED PUMP (IN - TANK) 3 INSIDE CARGO TANK 200m³/h @ 250m head EACH PUMP
JUNIOR LOCKER W.C. ELEVATOR GARBAGE STORE H
OFFICER - 2 PETTY 6 LOCKER W.C. ELEVATOR STORE 15
24 3 NEW LNG FEED HEADER 1 MIDSHIP / TRUNK DECK FLOWRATE: 400m³/h -
(INSUL. 80) F F
F (INSUL. 80)
15
CREW 7
R170
H
F H
F F 4 MIDSHIP QRH (EX) 2 MIDSHIP (PORT) / UPPER DECK DOUBLE HOOK (150T) -
F F
F
MAIN AIR MAIN AIR
JUNIOR PETTY 5 AIR HANDLING
00
15
SUPPLY SUPPLY F
OFFICER - 1 TRAINING UNIT ROOM 15 5 ELECTRICAL CABLE REEL 1 MIDSHIP (PORT) / UPPER DECK 750X910X775 PART OF SSL (PORT)
EXISTING
ROOM PIPE/DUCT
GYMNASIUM PIPE/DUCT
TRUNK TRUNK 1530
F
CREW 8 F
NEW
F F F 6 STS TRANSFER SYSTEM 1 MANIFOLD PLATFORM (PORT) LNG LOADING:8000m³/h MAX
MAIN AIR MAIN AIR
RETURN
PETTY 4 C.L. (INSUL. 80) C.L
RETURN H H H
EXISTING
15 15 15
15 15 15
C.L. C.L. F F F 90 F LNG RELOADING:5000m³/h
20 30 40 50 60 70 20 30 40 50 60 70 20 30 40 50 60 70 0 10 20 30 40 50 60 70 80 100 110 120 130 140 150 160 170 180
3RD CREW 9 F.P
UP
UP
A.P
DN
DN
OFFICER-2 OFFICER'S F
142,475.84
LAUNDRY
7 FO CABLE REEL 1 MIDSHIP (PORT) / UPPER DECK 750X910X775 PART OF SSL (PORT)
PETTY 3 SHIP'S
0
(INSUL. 80)
19 LAUNDRY 8 EMERGENCY RELEASE COUPLING 6 MANIFOLD PLATFORM (PORT) NA -
0
CARGO PART OF STS TRANSFER SYS.
CONTROL CREW 10
DRYING ROOM
JUNIOR OFFICER ROOM
9 STS HPU 1 MIDSHIP / TRUNK DECK 1800x1200x1650 PART OF STS TRANSFER SYS.
R170
SPARE-3 PETTY 2
WINCH
(INSUL. 50)
EL. EL
SMOKING
TRUNK DIRTY TRUNK 10 VAPORIZER JB A 1 MIDSHIP / TRUNK DECK 1201x186x367 -
ROOM LINEN DRYING CREW S
FRESH AIR
LOCKER LOCKER ROOM LAUNDRY F
INTAKE HATCH 11 LNG SAMPLING CABINET 1 MIDSHIP / TRUNK DECK 2654x602x2128 -
R1
SWIMMING POOL
0
VENT FAN ROOM (S)
00
CONFERENCE VENT FAN ROOM (S) 12 VAPORIZER JB B 1 MIDSHIP / TRUNK DECK 1201x186x367 -
0
UP ROOM UP CARGO HATCH
ELEC.
R15
FRESH AIR MOTOR MACH 13 FORWARD QRH 3 FWD (PORT) / UPPER DECK DOUBLE HOOK (150T) -
INTAKE 3RD 2ND OFFICER GENERAL CLEAN
000
CO2 ROOM DECK STORE ONLY
OFFICER-1 OFFICE FORM ROOM PETTY 1 LINEN CREW 14 CREW 13 CREW 12 ROOM ROOM
LOCKER 14 STS FENDER 4 MIDSHIP (PORT) / UPPER DECK 4500x9000 FOR FSU MODE
DN DN F
HATCH HATCH MANIFOLD PLATFORM (PORT)
15,986.76
DN DN 15 HOSE SADDLE 5 - PART OF STS TRANSFER SYS.
UP
DN
) (4 SINGLES 1 DOUBLE SADDLE)
15
25
0(MAX 25 25
R1800 F F
25 25
15 15
16 VSD 2 768X390X373 PART OF STS TRANSFER SYS.
17 HVSC CONTAINER 1 AFT (STB) / UPPER DECK 6058X2438X2896 -
18 LNG FEED PUMP JUNCTION BOX 3 MIDSHIP / UPPER DECK 800X325X1250 -
19 SSL CABINET 1 CCR ROOM / C DECK 600x600x1600 -
20 ERC JUNCTION BOX 2 MIDSHIP / TRUNK DECK 600x150x360 PART OF STS TRANSFER SYS.
PROVISION CRANE
21 BOG LINE MODIFICATION 1 MIDSHIP / UPPER DECK - -
(SWL:5TON)
22 SOLENOID BOX 1 CARGO MACHINERY ROOM 1345x465x2000 -
23 UPS DIST. BOARD FOR ERC 1 NO 1. MAIN SWBD ROOM 800x800x1200 FOR STS TRANSFER SYSTEM
24 IAS CARGO PANEL 1 ELECTRICAL EQUIPMENT ROOM 800x805x2155 -
25 HIGH VOLTAGE EXTENSION PANEL 1 NO 1. MAIN SWBD ROOM 650x1545x2890 -
56,835.69
25 2 2 2
26 GROUP STARTER PANEL 2 NO 1./NO. 2. MAIN SWBD ROOM - -
28 17 26 23 18 22 18 21 12 10 11 18
27 BABY FENDER 2 UPPER DECK (PORT) 1500x3000 FOR FSU MODE
28 HVSC ESCAPE ROUTE 1 UPPER DECK (STBD) - -
PRINCIPAL DIMENSIONS:
2ND DECK PLAN 3RD DECK PLAN 4TH DECK PLAN LENGTH O.A 285.101 m
TANK TOP PLAN LENGTH B.P 274.000 m
BREADTH (MOULDED) 43.400 m
32
E.R. W.B.TK (P) 28 DEPTH (MOULDED) 26.000 m
PURI. ROOM (P) VENT
E/R W.B. TK (P)
DECK 24 K
EXH. VENT. 2ND /B) DECK
I.G.G ROOM 345 A 3RD ) DEC E/ROOM W.B.T. (P)
20 (20 0 A/B 3RD 0 A/B)
(14 57 7 E/R W.B TK (P)
17 (14 5
I.G. BLOWER UNITS NO.1 LSMGO AFT
PURIFIER ROOM (P)
DESIGN DRAUGHT (MOULDED) 11.500 m
STOR TK. (P) INERT GAS GENERATION
IGG NO.1 LSMGO STOR.T.(P)
NO.2 LSMGO NO.1 LSMGO NO.1 LSMGO AFT
SERV. TK SERV. TK STOR. TK (P)
DRAIN
UP
K LINE SUMMER LOAD DRAUGHT (MOULDED) 12.100 m
I.G. EC B)
I.G.G H D A/ NO.2 LSMGO NO.1 LSMGO HIGH SEA
GENERATOR PIPING SPACE ROOM 4T 445 SERV.T.(P) SERV.T.(P)
VAVLE & (10 CHEST
MAIN G.E. (P) UP FITTINGS
DN
PURIFIER SLUDGE TK (S)
) P)
92,952.42
G.V.U ROOM HYD SPARE UP DN (P .( SCANTLING DRAUGHT (MOULDED) 12.500 m
TIGHTENING PARTS NO 2 W
BOIL OFF GAS VENT MOUNTING SOOT DRAIN MOUNTING DEVICES/
DN DEVICE DEVICE LIFTING TOOLS UP UP GENERATOR .T )
EXH. VENT TK. (P)/(2.0 M3) .T. )
F.W.T (P) .B .B . (P (P
I.G. COOLING UNIT F.W. TK. (P) UP ) T.
(228.8 M3) MAIN GENERATOR MAIN GENERATOR UP UP B.W. W W .B.T . (P .B.
VENT ENGINE ROOM (P) ENGINE ROOM (P) A F
LIFT VENT .3W .B.T
MACH. N2 .4 1W
I.G. DRYING UNIT
ROOM
COMPRESSORS VENT
48,839.02 BILGE
.4 NO .2W .
LOBBY
NO.2 MAIN N2
HOLDING T NO NO NO NO
SWITCHBOARD ROOM BUFFER NO.2
I.G. CHILLER UNIT TANK NO. 2
VENT VENT UP ELEVATOR NO.2 NO.1 ELEVATOR TRANSFORMER ELEVATOR CONVERTER
NO 4 MAIN GEN ENGINE ROOM NO 4 MAIN GEN ENGINE
(12V 50 D.P.) (12V 50 D.F.)
ROOM
NO.2 NO.1
)
ECONOMIZER NO.2
SEPARATED (P )
(C
FOR NO. 4 M.G.E NO 2
BILGE OIL T T. C.L.
AUX BOILER NO. 4 CARGO TANK NO. 3 CARGO TANK NO. 2 CARGO TANK NO. 1 CARGO TANK
ECONOMIZER
ID
.B.
FOR NO. 3 M.G.E
LIFTING LIFTING
DW
VO
SPACE
LIFTING
NO 3 MAIN GEN ENGINE
(12V 50 D.P.)
NO 3 MAIN GEN ENGINE
(12V 50 D.F.)
SPACE
S/G ROOM EM'CY
ENGINE ROOM FW BOW THR. VOID (C)
SPACE C.L. EXIT NO. 1 LSMGO FWD STOR.T (C) & FWD PUMP C.L
C.L. 20 30 40 50 60 70 10 20 30 40 50 60 70 DN 20 30 40 50 60 70
C.L. 0 10 20 CLEAN 30 40 50 60 70 80 PIPE DUCT 90 PIPE DUCT 100 110 120 PIPE DUCT 130 140 150 160 170 180
NO 1 DN DRAIN ROOM
LANDING LIFTING LIFTING A.P M.G.E F.P
F.P.
AUX BOILER SPACE
UP LSMGO FED STOR.T.(C)
SPACE NO 2 MAIN GEN ENGINE EM'CY NO 2 MAIN GEN ENGINE SPACE USED L.O.T
LIFTING EXIT LIFTING S/F L O
(12V 50 D.P.) (12V 50 D.F.) SPACE A.P. DRAIN T S/C
SPACE
COFFERDAM
COFFERDAM
COFFERDAM
S) X 12.07.2021 As Built JCB NHH HHH/ACC
COFFERDAM
NO.1
.(
SEPARATED .T
COFFERDAM